Tramline Construction Works – Halle Light Rail Program, Project 8.1/8.2 Dessauer Straße, Section 2, Traffic Systems And Canal Construction. As Part Of The Continuation Of The Light Rail Program, Dessauer Straße Will Be Further Built On The Southern Part (Ba1) With Project 8.1/8.2 (Dessauer Straße / Connection Point Happy Future) Ba2. The Project Includes Track Construction, Road, Path And Civil Engineering Services (Pipelines For Drinking Water, Wastewater, Low And Medium Voltage, Communication And Drainage). Btg 001 Track * Remove Approx. 150 M Of Cross-Tie Track * Remove Approx. 3,500 T Of Track Ballast/Track Superstructure * Remove Approx. 1,200 M Of Track Edge * Remove Approx M³ New Construction, Unbound Superstructure Layers Including Soil Replacement * Approx. 150 M New Construction Connection Lines * Approx. 3,000 M² Asphalt Track Base Layer * Approx. 600 M² Concrete Support Slab Track Made Of Steel Fiber Concrete * Approx. 1,500 M Frame Track, Elastic Bearing, Grooved Rails * Approx. 36 Pieces Of Track/Rail Drainage Boxes * Approx. 14 M Box Gutters * Approx. 200 M Nappenbord/Platform * Approx. 2,000 M² Pavement Covering Track Area * Approx. 720 M² Asphalt Covering Track Area * Approx. 1,800 M² Covering Grass Track Btg 02 Catenary Systems * 21 Masts Including Foundations Removed * 26 Mast Foundations Btg 03/05 Traction Power Systems/Communications * 34 Cable Pull Shafts * Approx. 6,000 M Of Cable Protection Pipes Btg 004/010/011/012 Stops/Road Construction/Cycle/Walkways/Parking Spaces * Approx. 13,700 M² Asphalt Demolition * Approx. 3,300 M² Pavement Demolition * Approx. 3,800 M Curbs Of Natural Stone/Concrete * Approx. 3,000 M³ Of Soil Removal * Approx. 10,800 M² Of Asphalt Road Including Drainage, Marking And Signage * Approx. 5,200 M Of Curbs * Approx. 5,200 M² Of New Pavement Construction Of Concrete Paving/Slabs, Mosaic Paving * 5 Pcs Of Stop Equipment Fgu/ Railing/Afi/Ofi Btg 013 Traffic Signal Systems * Decommissioning Of A Traffic Signal System * Construction Of 4 Light Signaling Systems Including Control Btg 14 Street Lighting * Decommissioning Of 33 Light Poles * Approx. 4,000 M Of Cable Including Earthworks * 42 Lighting Poles With 65 Lights * 4 Control Cabinets Btg 016/050 Open Spaces/Replacement Plantings * Approx. 3,000 M² Green Space (Lawn, Perennials) Btg 021 Sewers * Approx. 8 M Sewer Construction * Approx. 20 M Sewer Renovation Btg 023 Drinking Water * Approx. 1,100 M New Building Twl Dn 80-400 Ggg Incl. Earthworks * Approx. 150 M Pe House Connection Lines * Approx. 36 Pieces. Enclose House Connections Incl. 100 M Of Pe Line Btg 024/034/035/134 Electrical Energy Supply/Information Technology * Approx. 8,000 M Of Cable Laying Incl. Earthworks * Approx. 37 Pieces. Enclose House Connections * 8 Pcs Cable Pull Shafts And Cable Distribution Cabinets * Approx. 1,200 M Cable Protection Pipes Btg 025 Gas Supply * Approx. 1,000 M Gas Low-Pressure Line Dn 100 To Dn 300 Pe-Hd * Approx. 200 M Gas Low-Pressure Line Dn 25 To Dn 50 Pe-Hd For Ha * Approx. 33 Pieces Of House Connection Lines Connecting Btg 130 Cable Media * 6 Pieces Of Cable Pulling Shafts * Approx. 1,700 M Of Cable Protection Pipes Btg 60 Traffic Management And Diversion (Traffic Signaling Systems) * 2 Construction-Period Traffic Signaling Systems For Para
|