The Subject Of The Order Is The Expansion Of The Building Of The Public Primary School In Drwalewo With A Temporary Construction Facility - A Roof With A Permanent Steel Structure With A Temporary Coating With A Technical Durability Until December 31, 2045, Together With A Multi-Purpose Sports Field, Connected By A Connector To The Existing Building Of The Public Primary School In Drwalewo, Along With With Sanitary Facilities And Construction Equipment, As Part Of The Task Entitled Construction Of A New Multi-Purpose Sports Field With A Roof Of A Permanent Structure At The Public Primary School Named After Polish Patriots In Drwalew” On The Plot No. 724 Within The Registry No. 0009 Drwalew, Unit Register 140603_2 Chynów. The Main Facility Designed As Part Of The Task Covered By The Order Is A Multi-Purpose Sports Field With Dimensions Of 20X40 M With A Roof With A Permanent Steel Structure Covered With A Pvc Coating On The Roof And Walls Of The Roof. The Main Supporting Structure Of The Roof Will Be Made Of Thin-Walled Steel Profiles With Rectangular Cross-Sections, Placed On Reinforced Concrete Footings And Foundation Strips. The Multi-Functional Pitch Will Be Made With A Polyurethane (Epdm) Surface, Enabling Sports Activities And Games In The Field Of Football, Handball, Volleyball, Basketball And Tennis. Additionally, It Is Planned To Equip The Facility With Four Laser Shooting Ranges And A Portable Stage With A Protective Carpet - In Order To Use The Facility For Entertainment, Recreational And Sports Purposes. The Designed Playing Field With A Roof Will Be Connected To The Existing School Building With A Connector Made Using Traditional Improved Technology: Brick And Reinforced Concrete. The Main Load-Bearing System Of The Connector Will Be Load-Bearing Brick Walls Made Of Aerated Concrete Blocks, Reinforced With Reinforced Concrete Columns. The Buildings Roof Is Made Of Reinforced Concrete, Insulated From Above With Mineral Wool And Secured With Two Layers Of Roofing Felt. Direct Foundation Of The Building - On Reinforced Concrete Foundations. The Connector Will Be Constructed In A Separate Fire Zone From The Rest Of The School Building And The Planned Sports Field Roof. It Will Be Fire-Resistant Using Walls With Appropriate Fire Resistance, Along With Fire-Resistant Windows And Doors. It Is Planned To Build Sanitary And Locker Room Facilities In The Connector Building, Which Will Consist Of The Following Rooms: Womens And Mens Locker Rooms With Sanitary Facilities, Toilets, A Training Room With Facilities, Two Storage Rooms For Sports Equipment, A Stage And Shooting Ranges, And A Cleaning Room. The Investment Envisages Equipping The Designed Facilities With The Following Installations: - Electrical; - Telecommunications; - Water And Sewage; - Gas; - Central Heating (Supplying The Facilities With Heat From The Existing Boiler Room, Which Will Be Modernized In Accordance With The Project); - Mechanical Ventilation. Power Supply For The Designed Facilities Electricity Is Planned From The Existing Primary School Building, Along With Increasing The Power Allocation For The Facility. Cold Water From The Existing Installation In The Facility. Hot Water And Central Heating Will Be Supplied To The Designed Facilities From The Existing Boiler Room (The Order Provides For The Modernization Of The Boiler Room). Discharge Of Sanitary Sewage From The Designed Facilities To The Existing Sewage Treatment Plant On The Plot (The Project Assumes The Inclusion Of A Newly Designed Sewage System In The Manhole Along With Replacing The Existing One With A New One). The Order Provides For The Supply Of Equipment For The Designed Building Facilities In Accordance With Their Intended Use (Baskets, Goals, Nets, Ball Catches, Stands, Scoreboard, Lockers, Training Room Equipment, White Assembly Of Rooms, Etc.). The Order Provides For Comprehensive Implementation Of Construction Works Related To The Designed Facility Together With With Its Installations, Devices And Other Elements Necessary To Function In Accordance With The Designed Purpose. The Investment Will Also Include Access To The Designed Facilities, Including Off-Road Stairs And A Ramp For Disabled People, As Well As Hardened Parking Spaces For Passenger Cars. A Detailed Description Of The Subject Of The Order Is Included In The Design Documentation And Technical Specification, Which Constitute An Annex To The Description Of The Subject Of The Order And The Contract Template. The Bill Of Quantities Is An Auxiliary Document To Describe The Subject Of The Contract.
|