Quotation are invited for Onsite Flange Replacement Work in between Deaerator & Storage Tanks at Ph-III, E-Stn. SCOPE OF WORK FOR FLANGE REPLACEMENT WORK IN BETWEEN DEAERATOR & STORAGETANKS AT PH-III, E- STATION IN JEBEL ALI POWER STATIONFABRIC ATION & ONSITE REPLACEMENT OF PIPE FLANGES IN BETWEEN DEAERATOR &STORAGE TANKS AT PH-III,E STATION DUE TO CORROSION AND DEEP PITTI NGCAUSING FREQUENT LEAKS FROM THE FLANGES. THIS IS ONE TO ONE REPLACEMENTOF EXISTING FLANGES. DETAILS ARE AS FOLLOWS-PIPE FLANGE DET AILS:·#Ø18INCH, PIPE SCHEDULE 40, CS, WNRF, QTY.05SETS (1SET = 02FLANGE).CONTRACTOR SCOPE:·#SITE SURVEY & SPOT MEASUREMENTS (UPON RE QUEST) OF PIPES & ALL ATTACHMENTS IS TO BE DONE BY SUPPLIERS.·#MOBILIZATION OF MANPOWER AS PER JOB SCHEDULE PROVIDED BY THE DEWAENG INEER.·#INSULATION REMOVAL AND SURFACE CLEANING FOR JOB & RE-FIXING AFTERTESTING.·#CUTTING & REMOVAL OF OLD EXISTING FLANGES PLACING ON DESIGNATED AREA.·#EDGE PREPARATION & CLEANING TO MAKE READY FOR INSTALLATION.·#NEW FLANGE TO BE SAND BLASTING & PAINTING (SA2.5) TO MAKE READY FORINSTALLATION.·#FIT-UP OF FLANGES IN CORRECT POSITION AND DIRECTION PRIOR TOWELDING.·#MISALIGNMENT BETWEEN THE NEW & EXISTING PIPE SHALL BE CHECKEDTHOROUGHLY.·#FLANGE BOLT TORQUE TIGHTENING AFTER PLACING GASKETS.·#NO WELDING SHALL BE CARRIED OUT W ITHOUT APPROVAL OF DEWA ENGINEERS OFTHE FIT-UP.·#ONLY QUALIFIED/CERTIFIED WELDERS SHALL BE ENGAGED FOR ALL THEWELDING INCLUDING TACK WELDING.·#WELDING SHALL BE DONE IN ACCORDANCE WITH THE APPROVED SPECIFIEDWELDING PROCEDURE.·#CONTRACTOR NEED TO SUBMIT THEIR METHOD STATEMENT, RISK ASSESSMENT,PQR, WPS AND WELDERS QUALIFICATION CERTIFICATES.·#ALL MACHINES (CUTTING, GRINDING & WELDING ETC) TO BE ARRANGEDBY CONTRACTOR WITH VALID TESTING & CALIBRATION CERTIFICATES FROM 3RDPARTY LICENSED CERTIFYING AGENCIES.·#CONSUMABLE LIKE ELE CTRODES, GRINDING AND CUTTING DISCSREQUIRED FOR CUTTING AND INSTALLATION.·#IN GENERAL ALL ITEMS OF TOOLS, ACCESSORIES, CONSUMABLE, H OSES,CABLES, DISTRIBUTION BOARD ETC. OTHER THAN FACILITIES PROVIDED BY DEWASHALL BE ARRANGED BY THE CONTRACTOR.·#ALL RIGGING TOOLS ( BELTS, SHILLINGS AND D-SHACKLES) ARRANGED BYCONTRACTOR, MUST BE TESTED & CERTIFIED.·#INSPECTION TO BE DONE BY DEWA ENGINEER AT ALL THE STAGES ANY TIME.·#THE CONTRACTOR SHOULD APPLY FOR WORK TO PERMIT IN THEPRESCRIBED FORMAT IN ADVANCE BEFORE COMMENCING THE WORK. Qty: 1 Onsite Flange Replacement Work in between Deaerator & Storage Tanks at Ph-III, E-Stn. Contact Person: Gopal Tewari / GopalT@de wa.gov.ae / 04-80-44558 STANDARD TERMS & CONDITIONS 1) Prices should be DDP delivery duty paid at DEWA stores. 2) Quotation to be submitted only in local currency U.A.E Dirhams 3) DEWA Standard payment terms is 30 days credit from the date of acceptance of material 4) No DEWA staff or his or her relatives up to third degree should have ownership or partnership in your company, and your participation in DEWA tenders / RFQs should not constitute a Conflict or perceived Conflict of Interest. Supplier Registration: https://srm.dewa.gov.ae/irj/portal/anonymous/regis Tender Link : https://www.dewa.gov.ae/api/RfxDownload/Get/2332302818
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 74270459
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.