Workstations - Renovation Of Secondary Technology And Innovation Of Ris 400 Kv Lemešany - Construction Implementation. The Subject Of The Contract Is The Implementation Of The Construction In Accordance With The Requirements Defined In The Documentation For The Selection Of The Contractor (Hereinafter Referred To As Dvz) In The Following Scope: Operating File Ps 07 Switchboard 400 Kv: • Modification Of The Existing Control Cabinets Of The R400 Kv Fields, • Modification Existing Switches In Connection With The Replacement Of Switch Monitoring. Operational File Ps 10.1 Switchboard 33 Kv: • Modification Of The Existing Control Cabinets Of The R33 Kv Arrays, • Modification Of Existing Switches In Connection With The Replacement Of Switch Monitoring Devices. Operational File Ps 30.1 Central Device: • Sw Modification Of Databases And Testing In Existing Ones Headquarters In Awa06, Awa07, • Sw Modification Of Databases And Testing For Existing Operator Workplace, • Sw Editing Of Databases And Testing At Sed Za, • Sw Editing Of Databases And Testing At Ps Východ. Operating File Ps 30.2 Ris - Links To Technology: • Exchange Of Substations Ris (Awcxy) For R400kv Fields In The Protection Houses, • Replacement Of Ris Substations (Ava5, Ava7) For Transformers T402 And T403, • Replacement Of Ris Substations (Axa5.1, Axa5.2) For Fields R33kv, • Building A Ris Substation For Own Consumption (Awa0, Awa13), • Building Ris Substations For Self-Consumption Az (Ang00), • Replacement Of Ris Substations (Awnxy) For Own Consumption In Shelter Houses, • Moving The Switchboard Asc11 Within The Do11,12 House To A New Position, • Dismantling Of Awcxy Switchboards In The Protection Houses, • Dismantling Of Switchboards Ava5, Ava7, • Disassembly Of Axa5.1 And Axa7.1 Switchboards, • Disassembly Of Awa08 Switchboards, Awa13, • Dismantling Of Awnxy Switchboards In The Protection Houses. Operating File Ps 30.3 Electrical Protections (Lemešany): • Replacement Of Protections And Fault Recorders Of Lines V408 – Spišská Nová Ves, V487 – Moldava, V488 – Košice, V409 – Vola And Their Auxiliary Districts Up To The Terminal Blocks In The Original Switchboards Ara01, Ara04, Ara06 And Ara12, • Replacement Of Protections And Spp Fault Recorder And Their Auxiliary Circuits Up To The Terminal Blocks In The Original Switchboards Ara03, • Replacement Of Auxiliary Circuits Of Rop Outlet Units Up To Terminal Blocks In The Original Switchboards Arb01, Arb03, Arb04, Arb06 And Arb12, While Outlet Units Rops Remain, • Replacement Of Machine Protections, Primary, Secondary, Tertiary Side, Fault Recorders, Transformers T402, T403 And Their Auxiliary Circuits Up To Terminal Blocks In The Original Switchboards Rc1÷Rc4, Rc6÷Rc9, • Replacement Of Protections And Devices Synchronized Switching Of The Switches Of The 33 Kv Substation (Choke Terminals) And Their Auxiliary Ones Circuits Up To The Terminal Blocks In The Original Switchboards Rc5, Rc10, • Modification In The Secondary Ones Protection Circuits Of The Aca10 Field (Ksp) Resulting From The Exchange Of Protections In The Fields Mentioned Above. Operating File Ps 30.3 Electrical Protections (Moldova): • Replacement Of Differential Protection Lines V487 – Plows In Switchboard Ara08. Operating File Ps 30.3 Electrical Protection (Voľa): • Replacement Of The Differential Protection Of The Line V409 - Plows In The Ara09 Switchboard. Operating File Ps 30.3 Electrical Protections (Košice): • Replacement Of Differential Protection Lines V488 – Plowed In The Ara2 Switchboard. Operating File Ps 30.5 Automatic Regulation Voltage (Arn): • Replacement Of Existing Arns For T402 And T403, • Replacement Of Existing Arns For T32 And T33. Operating File Ps 30.6 Tis Protection: • Addition Of Switch U2403 To Of The Existing Switchboard Ava402, Together With The Power Supply And Fault Signaling Circuits, • Connecting Optical Patch Cords Needed To Connect The New Switch U2403 To Of The Existing Switch U203 In The Tiso Awm01 Headquarters. Operating File Ps 30.7 Monitoring Technology System: • Replacement Of Existing Switch Monitoring Devices In R400 Kv And Related Modifications Of The Existing Rph18 Cabinets, • Dismantling Of Communication Converters In Existing Rph18, • Addition Of Communication Ethernet Switch U1 To Rph18 In The Field Aca06, • Replacement Of Existing Circuit Breaker Monitoring Devices In R33 Kv And Related Equipment Modification Of Existing Ashxy Control Cabinets, • Dismantling Of Communication Converters In Existing Ashxy, • Addition Of Communication Ethernet Switch U233 To The Existing One Of The Ava402 Switchboard, Together With Power Supply And Fault Signaling Circuits, • Connecting Optical Patch Cords Needed To Connect From The Existing Ythx.1 Optoboxes To The New One Switch U233 In Ava402 And For Connecting New Monitors To Prepared Optoboxes Ythx.1 In The Corresponding Ashxy. Operating File Ps 30.8 Internal Communications: • Addition 2 Pcs Of Optical 24 Fiber Singlemode Cables Between Ava67 And Awa14. Operating File Ps 50 Own Consumption: • Adjustment Of The Control And Signaling Circuits Of The Ang1 Switchboard To 14 In Connection With The Deployment Of A New Automatic Back-Up (Az) Of Own Consumption In The Ang00 Switchboard, • Addition Of Low Voltage Cables For Connection Of Control And Signalling From The Ang## Cabinets To The New Switchboard Awa08 (Ris Substation For Own Consumption). Operational File Ps 62 Transmission Paths: • Exchange Of Protection Transmission Equipment For The V408 Line And V409 In Ayy1 Including Auxiliaries. Operational File Ps 62 Transmission Paths (Will): • Replacement Of Protection Transmission Device For V409 Line In Aya09, Including Auxiliary Ones Devices. Operational File Ps 62 Transmission Roads (Spišská Nová Ves): • Exchange Of Transmission Protection Devices For Line V408 In Aya06 Including Auxiliary Devices. More Details On The Subject Of The Contract Are Stated In The Contract For The Work (Hereinafter Referred To As Zod), Which Is Published At The Web Address: Https://Sepsas.Eranet.Sk/#/Tenderpublicdetails/33 Attachments No. 2, 3 And 8 To The Contract For The Work Will Be Provided To Interested Parties In Accordance With Points 29.7 And 29.8 Of The Tender Documents.
|