Building Construction Work - Tamás Spa Restoration Plan And Implementation. Ii.. Design Task Description: In View Of The Character Limit, Ii.2.14. Bt-300 More Information Section. (The Description Has Not Been Changed) Execution: (The Detailed Quantities Included In The Technical Documentation) - Restoration Of The Bath Building: O 462 M2 Lindab Jaw-Shaped Metal Sheet Covering Made Of Roll Material O 462 M2 Dörken Delta Trela Underlay Separating Layer O 462 M2 Unplaned Pine Decking 2.5 Cm Vtg. With Closed Fitting Provided With Flame And O Fungicide O 462 M2 1 X-Ray Vapor Permeable Underlay Film In Dörken Placement Of Delta-Vent N O 462 M2 Isover Quattro Thermal Insulation Felt O 462 M2 Sbs Modification Self-Adhesive Elastomer Vapor Barrier Sheet Firnnforest Thermo Wood With Heat-Treated Layered Film Coating Building Board On The Inner Surface O 3957 M2 White Dispersion Wall Painting In 2 Rtg With 15% Repair With Smoothing O Construction Of 610 M2 Facade Pipe Stand O Mechanical Demolitions: O Water And Sewer Restoration: O Heating Restoration: Surface Preparation: Anti-Corrosion Primer Pipe And 106M On The Surface Of The Register Pipe, O Ventilation Restoration: O Electrical Restoration: - Reconstruction Of Medicine In The Spa Building O 85M2 Demolition Of 10Cm Vtg Brickwork O 202M2 Making Internal Plaster On Partition Wall 1.5 Cm Thick. Until O 8 New 105 X 210 Cm Inner Installation Of A Door In A 10 Cm Partition O Installation Of 1 New 90 X 210 Cm Internal Door In A Partition O Installation Of 1 New 105 X 210 Internal Metal Door O Demolition Of 143 M2 Cassette False Ceiling Construction Of Suspended Ceiling: Construction Of A New 60X60 Mineral Fiber Suspended Ceiling On The First Floor: 38 M2 Construction Of A New 60X60 Metal False Ceiling (Base Sistema 500 Os504m): 105 M2 Monolith Impregnated Construction Of Plasterboard False Ceiling: 421 M2 Construction Of 60X60 Mineral Fiber False Ceiling: 201 M2 59 M2 Covering Of The Pool Wall Of The Weight Room And Forced Foot Wash Agrob Buchtal O With Mosaic Tile In Fresh Desert Sand Mix Color With 2.5 X 2.5 Cm Mosaic Tile. O 408 M2 Floor Covering Demolition And New Floor Covering Construction O Medicine - Mechanical Demolition: Dismantling Of Water Supply Equipment 9 Pieces, Dismantling Of Pipelines, Galvanized Or Black Steel Pipes 20M, Demolition Of Pipelines, Demolition Of Underfloor Heating Pipe 159.9M2 O Medical Water-Sewage Conversion: Drinking Water Pipe, Cross-Linked Polyethylene Pipe (Pe-Xa) Installation 95M, Installation Of Pe Polyethylene Drain Pipe 71M, Pvc Drain Pipe Installation 10M, Placement And Connection Of Sink Or Wash Basin Equipment 2 Pcs, Toilet Bowl Placement And Connection 1Pc, Placement Of Plumbing Fixtures 3Pc O Medicine - Ventilation Conversion: Installation Of Air Ducts With A Circular Cross-Section And Their Fittings 1 Unit, Square Installation Of Cross-Section Ceiling Fans Or Extractors 8 Pcs O Medicine – Heating Conversion: Placement Of Dry Shaft Circulation And Delivery Pumps And Connection, Inline Design, Energy-Saving 1Pc, Placement Of Heat Pumps 1Pc, Heating, Insulation Of Hmv, Hhv Lines 285M, Heating Line, Installation Of Galvanized Carbon Steel Pipe 255M, Floor Heating, Installation Of Cross-Linked Polyethylene Pipe (Pe-Rt) 159.9M2, Cooling And Heating Line, Installation Of Stainless Steel Pipe 130M, Placement Of Plate Heat Exchanger And Connecting It To The Heating System, With A Wall Or Standing Support Structure 1Pc, Heating, Air Conditioning, Cooling Technology Wet Shaft High-Efficiency Regulated Pump 3 Pcs., Air Convectors, Cassette, 2-Pipe System 10 Pcs, Dehumidification Equipment Installation, Compact Design 1 Pc O Medicine - Electric - Renovation Of A Bathroom O 1507 M2 Ceramic Floor Coverings Demolition And Construction Of A New Ceramic Floor Covering O Demolition Of 1,980 M2 Of Wall Covering Making New Wall Coverings (Including Medical Wall Coverings) O 1915 M2 Socket Leveling O 76 Fm Replacement Of Stair Face Plate O 216 Fm Floor Expansion Placement Of Profile By Cutting The Screed Concrete Underneath O 542 M2 New Kent Floor Insulation Preparation Of 542 M2 O 610 M2 Preparation Of New Painted Wall Insulation In The Water Blocks O 326 Re-Covering Fm Pool Gutters O Sanding And Glazing The Wooden Structure Of The 1850 M2 Roof O Demolition Of 534 M2 Pool Floor Coverings O Demolition Of 384 M2 Pool Wall Coverings O 534 M2 Making A New Pool Cover From Agrob Buchtal Pool Cover O 384 M2 New Pool Construction Of Wall Coverings From Agrob Buchtal Covering O 570 M2 Roof Terrace Slope Correction Making Of Thermal Insulation O 570 M2 Demolition Of Roof Terrace Waterproofing And New Pvc Waterproofing O 128 M2 Replacement Of False Ceiling Tiles From Cassette False Ceiling O Replacement Of 3 Uniquely Sized Dome-Shaped Skylights O Replacement Of 1 Reception Desk O Replacement Of 180 Lockers O Replacement Of Washstands In Rooms F31 And F26 O Replacement Of 12 Dressing Cubicles O Replacement Of 12 Toilet Cubicles O 1 Replacement Of Buffet Counter O 1 Replacement Of Cafeteria Cabinets O 66 M2 Floor Flower Bed Insulation O Construction Debris Containers For Storage O 15 Pipe Collars Re-Insulation O Mechanical Engineering - Automatic Heating Control O Electrical And Energy Modernization Pool Cold Lining Work In Total: 918 M2 (Details In Kd.)
|