1. The Investment Will Consist In The Reconstruction Of The District Road No. 1016F In The Town Of Łupice Along With The Reconstruction Of The Intersection With The Provincial Road No. 316 From Km 0+000 To Km 0+316.70. Existing Condition Of The Road: Provincial Road No. 316 (Plot No. 528 /3) In The Town Of Łupice, At The Site Of The Planned Reconstruction Of The Intersection With District Road No. 1016F, Has A Semi-Street Cross-Section With A Road With A Bituminous Surface, 6.0÷7.0 M Wide, And A Left-Side Sidewalk Made Of Paving Slabs, 1.25 M Wide, And A Right-Side Dirt Shoulder With Variable Width. The Sidewalk Is Separated From The Road By A Protruding Vibropressed Concrete Street Curb 20X30cm Placed On A Concrete Footing. On Both Sides Of The Road There Are Loose Developments Of Single-Family Residential And Farm Buildings. Currently, The Connection Of The District Road No. 1016F Into The Provincial Road No. 316 Takes Place Through Two Separate Integration Channels Separated In The Middle By A Green Belt In The Shape Of A Triangle, And The Connecting Roads Connect With The Road Of The Provincial Road At An Acute Angle, Significantly Reducing Visibility At The Intersection. District Road No. 1016F (Plot No. 528/5 And 514/1) In Łupice, On The Section Of The Planned Road Reconstruction, Has A Semi-Street Cross-Section With A Road With A Cobblestone Surface Ranging From 5.0 M To 3.20 M Wide And A Left-Side Sidewalk Made Of Vibro-Pressed Paving Stones, 1 M Wide .50 M And A Right-Side Dirt Shoulder Of Variable Width. The Sidewalk Is Separated From The Road By A Protruding Vibro-Pressed Concrete Street Curb 15X30cm Placed On A Concrete Footing, While The Dirt Shoulder Is Separated From The Road By A Stone Retainer. There Are Entrances To The Property Along The Existing Road, With Widths Matching The Width Of The Entrance Gates. Both The Road Surface And The Existing Sidewalks Are In Poor Technical Condition And Have Numerous Defects And Depressions. The Road Does Not Have A Storm Water Drainage System.2. Scope Of The Project: - Reconstruction Of The Intersection Of District Road No. 1016F With Provincial Road No. 316, - Reconstruction Of District Road No. 1016F, - Reconstruction Of Intersections Of District Road No. 1016F With Municipal Roads, - Construction Of A Rainwater Drainage System Along With The Construction Of A Water Facility - An Earth Pond Serving As A Water Receiver Rainwater Discharged From The Road Surface.1. Required Characteristic Technical Parameters Of The Road: - Road Category - District, - Road Class - L - Local - Traffic Load Category - Kr 2 - Design Speed - 30 Km/H - Width Of The Maneuvering Road - From 5.50 M To 5.00 M - Width Sidewalk - 2.00 M To 1.80 M - Width Of Curb Gutter - 0.20 M - Width Of Parking Spaces - 2.50 M - Depth Of Parking Spaces - 5.00 M - Type Of Road Surface - Bitumen And Domino Concrete Cubes, - Type Of Sidewalk Surface - Rectangular Concrete Cubes Holland - Type Of Exit Surface - Rectangular Concrete Cubes Holland The Scope Of Works Will Include: - Reconstruction Of The Intersection Of The District Road With The Provincial Road, - Reconstruction Of The District Road, - Reconstruction Of Existing Intersections With Municipal Roads, - Construction And Reconstruction Of Exits, - Construction Of A Rainwater Drainage System With An Earth Pond, - Installation Of Horizontal And Vertical Markings As Part Of Permanent Traffic Organization, - Lighting Of A Pedestrian Crossing In The Intersection With A Provincial Road, - Cutting Down And Grubbing Up Felled Tree Trunks Colliding With The Investment. Wood From Felling Is The Property Of The Ordering Party And The Contractor Will Be Obliged To Submit It To Plot No. 153 Located In Łupice. - Topsoil And Grassing Of Green Areas, - Reconstruction Of Existing Technical Infrastructure Colliding With The Investment. - Any Other Works That May Prove Necessary To Complete The Subject Of The Order. The Ordering Party Will Require The Contractor To Perform The Works Covered By The Subject Of The Order, In Accordance With The Design And Cost Estimate Documentation, The Conditions Of The Permits Granted, The Conditions Issued By The Owners Of The Technical Infrastructure Network, The Principles Of Technical Knowledge And Construction Practice, And The Principles And Conditions Of Occupational Health And Safety, Including: A) Providing The Ordering Party With Within 7 Days Before The Planned Date Of Commencement Of Works, All Properly Issued Documents Necessary For The Commencement Of Construction Works, Including: - The Original Declaration Of The Construction Manager On Assuming The Duties Of Construction Manager, - The Original Declarations Of All Industrial Works Managers Confirming The Acceptance Of The Obligation To Manage The Works, - Certified For Compliance With Original Copies Of The Authorizations Of The Construction Manager And Works Managers As Well As Current Certificates That They Are Members Of The District Chamber Of Construction Engineers, B) Introducing Temporary Traffic Organization For The Duration Of The Works, C) Marking Out The Works By An Authorized Surveyor, D) Implementing The Investment In Accordance With The Construction Design And In Accordance With The Conditions Issued By The Owners Of The Existing Technical Infrastructure, E) Recycled Materials: Paving Stones From The Demolition Of The Sidewalk, Field Stone And Wood From Tree Felling Are The Property Of The Ordering Party And The Contractor Will Be Obliged To Submit Them To Plot No. 153 Located In Łupice (The Paving Stones From The Sidewalk Demolition Should Be Place On Pallets), F) In Accordance With The Act Of July 19, 2019 On Ensuring Accessibility For People With Special Needs, The Employer Requires That Strips Of Relief Directional And Warning Tiles Be Used On The Surface Of Sidewalks, In Places Where Pedestrian Crossings Are Located, One Pedestrian Crossing Should Be Illuminated In Accordance With Annex No. 1 To Swz.G) Removal And Management Waste Generated During Construction Works In Accordance With The Provisions Of The Act Of December 14, 2012 On Waste (Journal Of Laws Of 2023, Item 1587), H) If Permanent Geodetic Points Are Found In The Investment Area, Protect Them Against Damage And Immediately Notify The Ordering Party About This Fact, I) Make Horizontal And Vertical Markings Of The Completed Road Section In Accordance With With The Approved Permanent Traffic Organization Project, J) Carrying Out An As-Built Surveying Inventory By An Authorized Surveyor. The Detailed Scope Of The Investment Is Specified In The Design And Cost Estimate Documentation Constituting Annex No. 1 To The Swz.
|