|
The Subject Of The Order Is: Construction Of A Sanitary Sewage System In The Town Of Stróża, Kraśnik Commune. The Subject Of The Order Includes In Particular: The Planned Project Involves The Construction Of A Collective Sewage Disposal System, I.E.: A Sanitary Sewage System, Enabling The Discharge Of Sewage From Buildings Located Between Ul. Wapienna And Ul. Dębowa, Stróża Commune Kraśnik. Sanitary Sewage From The Study Area Will Be Discharged Through A Sewage Pumping Station And A Pressure Pipeline To The Existing Sanitary Sewage System Located In The City Of Kraśnik To A Well Marked On The Development Plan As W1 With Ordinates 249.25/247.15 On The Existing Sanitary Sewage System Ks200 In The Road Area Of Towarowa Street (District No. 365/16, Registration Area: Railway Station). Connection To The Existing Network Is Planned Through An Expansion Well, Which Will Function As A Precipitator Of Energy From Sewage Discharged From The Pumping Station To The Receiver. The Planned Sanitary Sewage System Will Be Located In The Immediate Vicinity Of Farm Buildings, Mostly In Home Gardens And Lawns. On Sections Running Outside Buildings, It Runs On Meadows, In Road Lanes Of Municipal Roads, Local Roads With Bituminous Surfaces Or Dirt Roads). The Location Of The Designed Networks Is Determined By The Depth Of The Network Foundation, Existing Buildings And The Location Of Septic Tanks On The Property. Due To The Existing Terrain And The Inability To Drain Sewage By Gravity, A Network Pumping Station With An Energy Supply Cooperating With The Gravity Network Is Planned. The Pumping Station Will Be An Underground Facility, Equipped With Two Submersible Pumps Operating In A System: One Working And One Reserve, Working Alternately With Automatic Switching On Of The Reserve Pump. In Connection With The Implementation Of The Investment, It Is Planned To Use Materials And Raw Materials In The Form Of E.G. Pvc And Pe Pipes, Wells, Concrete , Aggregates, Sand For Bedding, Backfilling, Backfilling Of Excavations. In Addition, Fuel And Electricity Will Be Consumed. Water Is Expected To Be Used For Technological Purposes - Tightness Tests. All Raw Materials, Materials, Water, Fuels And Energy Used For Construction Should Be Used In Accordance With Applicable Standards And Regulations, With Particular Attention Paid To The Recovery Of Materials And Raw Materials During Waste Management. It Is Planned To Build A Gravity Sewage Network From Pvc U Pipes With A Solid Homogeneous Wall With An Internal Heavy Print S - Sn 8 Kpa With A Diameter Of Dn160÷Dn200mm, From Pe 100 Sdr 17 Dn Pipes 160÷200Mm. Parameters, Diameters And Quality Of The Pipes In Accordance With With Pn-En 1401-1. Pvc Sewage Pipes Should Have An Internal Marking With The Manufacturers Name And Pipe Type, Enabling The Materials Used By The Contractor To Be Checked Using An Inspection Camera. All Pipes Used Are Socket-Connected With A Factory-Installed Gasket, Gaskets With A Plastic Stiffening Ring In Accordance With With The Harmonized Standard Pn-En 681-2.1. List Of Main Investment Parameters - Sanitary Sewage Network Main And Side Collectors Catchment No. Series S(Sdr 34) Sn8160x4.7[Rm] Series S(Sdr 34) Sn8200x5.9[Rm] Pe 100-Rc(Sdr 17) Type 3200X11.9[ Mb] P-1 115.9 2,188.0 31.7Wł-1 - 5.0 -Total: 179.0 2,193.0 31.7Pumping Pipespumping Station No. Pe Sdr 1190X8.2 [Mb]P-1 350.5Total: 350, 5Summary Of Pumping Houses Pumping Station Type Of Pumping Station/Pump Tank Dimensions [Mm] Commentsp-1 Polymer Concrete Acc. Category Cards 1500 Pump – 2 Pcs. List Of Manholes Catchment No. (Pumping Station) /R. Gravitational/ /R. Discharge/Control Inspection Cascade Expansion Inspection-Drainage Measuring Dn425 [Pcs] Dn 1000[Pcs] Dn 1000[Pcs] Dn 1000[Pcs] Dn 1500[Pcs] Dn 1500[Pcs]P-1 14 69 17 - 1 1Wł-1 - - - 1 - -Total: 14 69 17 1 1 12. List Of Main Investment Parameters - Sewage Connectionssanitary Sewage Connections Catchment No. Series S(Sdr 34) Sn8160x4.7 [Mb] Series S(Sdr 34) Sn82 00X5, 9 [Mb]P-1 1 698.5 445.6 Wł-1 - -Total: 1 698.5 445.6 List Of Manholes Catchment No. (Pumping Station) /R. Gravity/Inspection Control Dn425 [Pcs.] Dn 1000 [Pcs.]P-1 78 7Wł-1 - -Total: 78 7The Detailed Scope Of The Order Regarding The Implementation Of The Subject Of The Contract Is Specified In The Documentation Attached To The Swz (Annex No. 7 To The Swz), I.E. The Construction Design , Technical Design, Technical Specifications For The Execution And Acceptance Of Works, Bill Of Quantities, Contract Template, Bioz Constituting Annexes To The Siwz. However, The Ordering Party Indicates That The Bills Of Quantities Are Only Of Auxiliary Nature For The Contractor And Do Not Constitute The Basis For The Valuation Of The Offer. Providing Bills Of Quantities Does Not Release The Contractor From The Obligation To Calculate The Offer Price Based On Technical Specifications And From The Obligation To Take Into Account All Works And Costs, Including Those Not Provided For In The Bill Of Quantities. The Contractor Is Obliged To Check The Completeness Of The Bill Of Quantities And Treat It As Auxiliary To The Above-Mentioned Documents, Which Have Priority When Determining The Actual Scope Of Works Included In The Subject Of The Order. The Ordering Party Does Not Provide For An On-Site Inspection Or Verification By The Contractor Of Documents Necessary To Complete The Order. Available On-Site At The Ordering Party, Referred To In Art. 131 Section 2 Of The Public Procurement Law As A Requirement To Submit An Offer.
|