Substation Construction Work - Reconstruction Of Diósd132/22 Kv Substation. In The Above Subject, The Tender Is For The Architectural And Electrical Engineering Of An Existing Substation Starts A Two-Stage Negotiated Public Procurement Procedure For Its Reconstruction. Task Of The Winning Bidder: In Diósd 132/22 Kv Substation: 132 Kv Open Space Complete Dismantling Of 1 Auxiliary Rail And Associated Disconnectors, 3 Unused Complete Demolition Of Reserve Field, 2 Transmission Line Fields, 2 Transformer Fields, 1 Db Rail Bridging Field Primary (Replacement Of Disconnectors, Transmission Line Fields Surge Arresters Installation) And Secondary Rebuilding Or Defense Reconstruction According To Plan Documentation. Star Point Transformers, Fanoe Resistors In 2 Transformer Fields And Complete Replacement Of Arc Windings, With Associated Switchgear And Rail Replacements, Architectural Along With Renovation. 1 22 Kv Control And Switch Building Reconstruction, Partial Renovation, Installation Renovation In A 22 Kv Switch Building 2 Transformer Supply Cells, Reconstruction Of 1 Busbar Bridge Cell, 2 Branches (J00, J12) Complete Final Dismantling, Busbar Shortening And Busbar Grounding Disconnectors Relocation, Complete Reconstruction Of 6 Consumer Branches, 3 Medium Voltage Per Branch For Small Group Branching Equipped With A Case, With The Currently Built Cellular Design, Per Branching In Addition To The Demolition Of 2 Consumer Cellular Structures, There Are 2 Additional Undeveloped Reserves Creation Of A Branch For The Possibility Of Later Expansion. Related Secondary Transformations And Complete Protection Reconstruction. Reconstruction Of 2 Domestic Transformer Rooms, Construction Of New Connections, Replacement Of 1 Hü Transformer, New Mobile Hfkv Connector Installation Of Equipment Demolition Of 3 Current 22 Kv Hfkv Srto Cases, 1 New Mobile Construction Of A Foundation And Connection Suitable For Receiving Hfkv, As Well As Other Architectural Renovations And The Execution Of Electrical Technological Reconstruction Works In The Design Documentation According To The Useful Floor Area Of The Substation Building Is 1202.45 M2. Albertfalva 132/11 Kv In The Substation: 1 132 Kv Diósd Transmission Line In The Field, Protection Device Replacements And Related Secondary Transformations In Order To Create Section Protection, In The Diósd Substation Devices With The Same Protections Installed. The Detailed Task Description Of Public Procurement Included In The Documentation. M1. Technical/Professional Eligibility Conditions When Defining The 10/110Kv Substations, It Was Prescribed As A Simplified Condition Eligibility Condition. If The Technical Description Is Of A Specific Make 321/2015. Or Equivalent Should Be Understood As A Product/Thing/Process. Equivalence You Must Attach Your Evidence To The Offer In Simple Copy.
Contact Information
Contact Person
Darida Éva
Address
Riadó utca 5.
Contact No.
+36 18828635
Email
hirdetmeny@kt.hu
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 73256236
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.