|
Construction Work - Construction Of A Puz Teaching Building In Tarnobrzeg. 1. The Subject Of The Order Is The Construction Of A Teaching Building And A Garage Building Together With The Necessary Technical Infrastructure, Land Development (Including Works Demolition) And Equipment. The Basis For The Execution And Valuation Of Construction Works Is The Design Documentation Prepared By Dresler Studio Architektura I Urbanistyka Ltd. Sp. K. Constituting An Annex To This Tender Procedure. 2. Characteristic Parameters Of The Teaching Building: 1) Location, Tarnobrzeg, Ul. Henryka Sienkiewicza 50 On Plot No. 1732/3, 1574/8, 1579/30, 1731/5, 1731/8, Area 12 Number Of Above-Ground Floors: 3 Number Of Underground Floors: 1 Area Development Of The Teaching Building: 1,496.1 M2 Usable Area Of The Teaching Building: 3,505.5 M2 Total Area Of The Teaching Building: 4,140 M2 Gross Volume Teaching Building: 18,520 M2 Height Of The Teaching Building: 14.32 M 2) Building The Didactic Area Was Designed As A Combination Of Two Blocks Placed Perpendicular To Each Other, In Plan It Is Similar To The Letter L. A) The Eastern Part Of The School Building Contains: Zone Main Entrance In A High, Bright Hall, With Security, With A Cloakroom; Educational Zone Fields Of Emergency Medical Services, Psychology, Internal Security; Sports Zone In The North-Eastern Part. B) The Western Part Includes: A Complex Of Guest Rooms For School Employees; Social Area For Teachers; Administrative Part – Rectorate. 3. Characteristic Parameters Of The Garage Building: Number Of Floors Above Ground: 1 Number Of Underground Floors: None Building Area Garage: 133.38 M2 Usable Area Of The Garage Building: 113 M2 Area Total Area Of The Teaching Building: 133.38 M2 Gross Volume Of The Garage Building: 580.2 M2 Height Of The Garage Building: 4.35 M 4. As Part Of The Investment, Construction Contractor Will Perform Installations Including: 1) Electrical And Telecommunications Installations, I.E.: Installation Power Supply And Energy Distribution, Power Generator, Photovoltaic Installation Pv, Installation Of General, Emergency And Directional Evacuation Lighting, Installation Of External Lighting, Installation Of Power And Plug Sockets, Installation Grounding And Equipotential Bonding, Lightning Protection System, Signaling System Fire Protection System (Ssp), Gravity Smoke Extraction System (Odd), Access Control System (Skd), Intruder Alarm System (Sswin), Video Surveillance System (Cctv), Video Intercom Installation (Vdom), Structured Cabling Installation (Os), Lan And Wifi Active Devices, Calling System For Disabled Toilets, 2) Mechanical Ventilation And Air Conditioning Installations, 3) Water And Sewage Installations. Including: Water For Social And Fire Protection Purposes, 4) Installation Of Sanitary Sewage Systems, Including: Drainage Of Sewage From Toilet Bowls, Washbasins, Sinks, Urinals And Inlets; Draining Condensate From Air Conditioners; Room Drainage Technical – Room Heating Station, Room Water Connections Etc.; Draining Condensate From The Humidifier Steam; Outflow From Linear Drainage In The Room. Waste Collection 5) Installation Storm Sewage System, Including: Drainage Of The Roof Of The Designed Building, Drainage Roof Of The Garage Building And Waste Collection, As Well As Runoff From The Drainage Of Garage Stalls, 6) Central Heating Installations – Heat Pumps, 7) Smoke Removal Installations For Staircases And Shafts Elevators, 5. The Subject Of The Order Is Described In Detail In The Construction Design And Design Executive For The Entire Order, I.E.: 1) Construction Design A) Opinions, Arrangements, Permits B) Architectural And Construction Design C) Technical Design Pt Construction Pt Electrical Installations Pt Ventilation Pt Water And Sewage Installations Internal Pt Water And Sewage Connections (Agreement) Pt Water And Sewage Connections. (Report) Pt Connection Rainwater Sewage System (Agreement) Pt Rainwater Sewage Connection (Notification) Pt Road Industry Pt Water And Sewage Installations. External Pt External Installation Stormwater Drainage D) Land Development Design 2) Detailed Design Pw Architecture Pw Construction Pw Electrical Installations Pw Ventilation Pw Water And Sewage Installations. Internal Pw Water And Sewage Connections Pw Sewage Connection Rainwater Pw Road Industry Pw Av Installation Pw Bms Installation Pw Installations Water And Sewage External Pw External Rainwater Drainage Installation Pw Arrangement Interior Design 3) Demolition Project; 4) Stwiorb; 5) Bill Of Quantities, Provided That It Has It Is Informative. The Contractor, After Reviewing The Design Documentation, Is Obliged To Determine The Scope Of Work Necessary To Achieve The Result; 6. Any The Work Should Be Performed On The Basis Of Designs And Bills Of Quantities In The Order Of Importance: Project Documentation; Stwiorb; Bills Of Quantities
|