Architectural, Engineering And Planning Services - New Körmend Sports Hall. The Planning Task In The Inner Area Of The City Of Körmend Is The 1566/3. On Property With Geographic Number Building Permit For The New Körmend Sports Hall, Training Center, Reception Building And Preparation Of Construction Plans, Obtaining The Necessary Permits For Construction. The Approval Plan, Which Is The Basis Of The Design, Available To Bidders He Forgives. The Site Is Easily Accessible, A Former Brick Factory Area That Has Been Rehabilitated It Is Considered A Brownfield Investment. Next To The Sports Hall (Net Floor Area: 10265 M2). Also Designed A Training Center With New Changing Rooms And Training Fields, Which In Terms Of Their Function For Basketball, Fencing, Futsal, Kickboxing, Wrestling And Other Local Sports Associations Provides Space. The Hall Building, The Main Fighting Arena And Its Associated Seats Have Nearly 3,000 Seats Auditorium, As Well As The Functions That Serve Them, Buffets, Changing Rooms, Social Rooms, Mechanical Engineering. There Is Also A Gym For Athletes And A Gym For The Public In The Hall Building. It Is Connected To The Hall Building, But Can Be Handled As A Separate Unit In The Training Center (Net Floor Area: 4087 M2) For The Purpose Of Training Youth For Basketball, Fencing And Wrestling Training Fields And Changing Rooms Are Being Prepared, With Minimal Standing Areas And Additional Rooms. Leisure Activities In The Open Space Next To The Reception Building (Net Floor Area: 707 M2) Suitable For Two Basketball Courts Designed For Streetball Or 3X3 Basketball. The Pitch Also Has A Small Changing Room. Next To The Tracks, There Are Street Workout Machines Installation Is Also Planned. The Buildings Are Planned To Have A Total Of 2187 M2 Of Sports Parquet Contain The Number Of Planned Parking Lots Is 309, Of Which They Are Barrier-Free And Electric Parking Spaces With Chargers Must Also Be Provided, As Well As Two Parking Spaces Also A Bus Stop. Additional Tasks Of The Designer: -External And Internal Utilities Are Complete Design - Bim Level 3 Model Creation Lod (Level Of Development) 300 Detail By Level. Delivery Of An Ifc Model Corresponding To A Performance Milestone - Public Procurement Participation In The Public Procurement Procedure For The Implementation Of The Investment The Construction It Is Necessary To Take All Of Them Into Account When Developing Licensing And Implementation Plans The Requirements Contained In The Rule Books And Regulations Of The Sport Concerned: - Fiba Official Bascetball Rzles-2020 - Mkosz Hungarian Basketball Competition Rules-2020 - Fiba Official 3X3 Basketball Rules – 2021 - Mksz The Game Rules Of Handball Are The Ihf, Ehf And Mksz Completed With Jab Resolutions-2018 - Uww, Mbsz International Competition Regulations- Freestyle, Womens Discipline - 2020 - Competition Regulations Of The Fie, 2015, December - Wako Kickboxing Rules – V17.4 - Mtsz Hungarian Bowling And Bowling Association Professional Bowling Association Technical Regulations - March 2020 - Fifa Futsal Game Rules - 2014/2015 - The Sports Technology And Track Requirements Must Be Met During The Construction Period It Is Necessary To Examine And Check What Is Written In Each Rule Book, If Any Due To Changes Affecting Tracks. Design Tasks That Are The Subject Of This Public Procurement A Detailed Description Of Which Is Part Of The Public Procurement Documents Included In The Plan. Tenderer 321/2015. (X. 30.) Section 46 (3) Of Government Decree Records That In The Invitation To Initiate The Procedure And In The Public Procurement Documents To A Thing, Procedure, Activity, Person Of A Specific Make, Origin, Type, Reference To A Patent Or Trademark Is Only A Clear Definition Of The Nature Of The Subject Matter Was Made For, And The Term Or Equivalent Should Be Understood. It Is The Responsibility Of The Tenderer To Prove Equivalence.
|