Building Demolition And Wrecking Work And Earthmoving Work - Renovation Of Bernsdorf Outdoor Pool / Lot 01 Demolition Work. Demolition Work Pool: 400 M² Scaffolding 250 M² Concrete Cutting Work, Horizontal, Pool Head 72 M² Separation Cuts 10 M² Concrete Cutting Work, Vertical, Pool Wall 60 M² Concrete Cutting Work, Pool Floor 240M Demolition Sheet Metal Duct 400 M3 Demolition Reinforced Concrete, Masonry 3000Kg Sealing Compound >Z2 Remove 240 Pieces. Installation Demolition Pieces 500 M3 Disposal Of Building Rubble In Accordance With Ebv 15 T Disposal According To Avv 1703 50 T Disposal According To Avv 1701 600 M2 Blasting Work Color Coating 24 T Disposal According To Avv 1201 2 Pieces Protective Tent 1 Piece B/W Sanitary Container Demolition Work Existing Building: 1 Pc. Demolition Staircase 3 M2 Demolition, False Ceiling, Concrete 10 Pcs. Winch Supports 26 M2 Demolition Of Masonry 9 M2 Demolition Of Floor Slab, Foundations 50 M3 Complete Demolition Connector Construction 350 M2 Dismantling Wooden Cladding 25 Pieces. Removal Of Windows/Doors 23 M2 Dismantling Gk Suspended Ceilings 15 M2 Demolition Gk Walls 140 M2 Demolition Tile Coverings 350 M2 Demolition Plaster 170 M2 Demolition Pvc Covering 100 M2 Demolition Cast Stone 45 M3 Loosen The Floor And Dispose Of 55 Pieces. Dismantling Lights Including Bulbs 820 M Dismantling Cables/Wires 5 Pieces. Dismantling Distributor 200 M Dismantling Pipes Metal/Plastic Incl. Insulation And Sheet Metal Wall 16 Pieces. Dismantling Sanitary Ceramics 280 T Disposal Construction And Demolition Waste According To Waste Code 1500 M2 Cleaning Demolition Work Outdoor Areas: General Dispose Of 7 T Of Unusable Materials 5 M³ Break Down Obstacles In The Ground 259 M² Of Rootstocks Cleared And Disposed Of Demolition Edging + Covering Layers 717 M² Of Sand Area Pick Up And Dispose Of 746 M² Of Fleece. Pick Up And Dispose Of 285 M² Of Gravel Area Pick Up And Dispose Of 1,017 M² Exposed Concrete Slabs Including Bedding, Break Off, Load And Dispose Of 37 M² Concrete Slabs, Bonded Construction, Demolish, Load And Dispose Of Break Down 100 M² Of H-Interlocking Paving, Load And Dispose Of 55 M² Of Rectangular Paving Break Down, Load And Dispose Of 60 M² Plastic Fall Protection Panels. Break Down, Load And Dispose Of 102 M² Of Asphalt Surface, Load And Dispose Of 24 M² Of In-Situ Concrete Area Demolish, Load And Dispose Of 410 M Demolition Concrete Curb, 8 Cm, Including Foundation 100 M Demolition Concrete Edge Stone, 6 Cm, Including Foundation 26 M Demolition Drainage Channel Made Of Concrete, 30 Cm Wide, Including Substructure, Demolition Of Walls + Fence, 5 M Bar Mesh Fence, H: Approx. 2.00 M, Including Demolishing The Foundation, Loading And Disposing Of 24 M Wire Mesh Fence, H: Approx. 2.00 M, Including Expanding The Foundation And Storing 125 M Of Exposed Concrete Masonry On The Side With Seat Pads Made Of Granite, Including The Foundation. Break Down, Load, Transport And Dispose Of Properly, Demolish 110 M Collector Aisle (Underground Cavity), Load, Remove And Dispose Of Equipment Professionally. Demolish And/Or Store Equipment 3 Pieces Of Demolition And Side Storage Sign Holders In Two Sizes, Including Foundations 3 Pcs. Demolition And Store Concrete Animals Elephant On The Side Including Foundations 2 Pcs. Relocate And Side Storage Of Concrete Table Tennis Tables 19.5 M³ Walk-Through Pool (4 Pcs.) Made Of In-Situ Concrete, Pick Up, Load And Dispose Of 10 M Round Tube Railing H: Up To 100 Cm With Posts Break Off And Dispose Of 14 Pieces. Pick Up And Dispose Of Plant Containers (Various Sizes) Made Of Exposed Aggregate Concrete 3 Pieces. Demolition And Disposal Of Concrete Animals Horses Incl. Foundations 1 Piece. Demolition And Disposal Of Basketball System (Without Board And Basket), Incl. Foundation 4 Pcs. Demolition And Disposal Posts Of The Net Holder (Beach Volleyball) 30 M Demolition And Disposal Ball Stop Fence Including Foundation 1 Piece. Demolition And Disposal Wooden Hut Made Of Wood Including Base Plate 11.5 M³ Demolition And Disposal Of Strip Foundation 17 Pieces Of Former Sanitary Building. Demolition And Disposal Masonry Shaft, Including Steel Frame With Steel Cover Demolition Pipeline 260 M Demolition Pipeline Pe 5 T Disposal Of Pipelines 300Kg Disposal Of Metallic Waste
|