Metalworking - New Middle School Building - Metal Construction, Locksmith Work. 1. General And Higher-Level Services, Calculations And Evidence, Etc. 2. Steel Bar Railings, H = Approx. 1.10 M, Powder-Coated, With Oak Wooden Handrail 2.1 Staircase 1: Approx. 25 M + Training On 5 Stairwells, Intermediate Landings 2.2 Staircase 3: Approx. 18 M + Training On 3 Stairwells, Intermediate Landings 3. Sheet Steel Railing, H = Approx. 1.10 M, Powder-Coated, With Wooden Handrail Oak 3.1 Staircase 2: Approx. 31 M + Training At 5 Stairwells, Landings 3.1 Staircase 2, 1St Floor Ramp: Approx. 13.5 M + Training On Intermediate Landing 4. External Stairs, Steel Rr Profiles, H = Approx. 1.10 M, Different Colors, With Handrail V2a 4.1 All-Round Panel On Stair Opening, 3-Sided, H = Approx. 1.55M: Approx. 25 M 4.2 Balustrades Made Of Rr 80X40, H = Approx. 5.53 M, Different Colors: Approx. 17 M 4.3 Balusters Made Of Rr 80X40, H = Approx. 2.60 M, Different Colors: Approx. 8 M 4.4 Handrails, V2a, Round Tube, With Consoles: Approx. 20 M 5. All-Glass Railing 1St Floor Student Terrace, Laminated Safety Glass, H = Approx. 1.10 M 5.1 All-Glass Railing Vsg, With Uk, With V2a Round Tube Handrail: Approx. 78 M 6. Other 6.1 Maintenance Staircase 1St Floor Inner Courtyard, Steel Fvz. / Giro, 2 Pieces 23/30 Cm: 1 Piece 6.2 Shaft Ladder Ug, V4a, L = Approx. 1.68 M, With Entry Aid V2a: 1 Piece 7. Documentation
|