Road Construction Works - Construction Of The S10 Szczecin - Piła Road; Episode 3: Suchań (With A Junction) – Recz (With A Junction). The Subject Of The Order Is: Construction Of The S10 Szczecin - Piła Road On The Section At The End Of The Bypass Stargard - The Beginning Of The Piła Bypass (With The Koszyce Junction), Excluding The Towns Bypass Wałcz, Section 3: Suchań (With An Interchange) – Recz (With An Interchange)” The Scope Of The Task Includes In Particular: 1) Construction Of An Expressway, 2) Road Junctions: Suchań Junction, Recz Junction, 3) Reconstruction Existing Roads In Terms Of Collision With The Expressway, 4) Construction Of The Main Road Route Expressway, 5) Reconstruction Of Existing Roads In Terms Of Collisions With The Expressway, 6) Construction Of Roads Other Than Expressways, Including Changing The Route Of Existing Roads, 7) Construction Of Additional Roadways Located In The Expressway Right-Of-Way, 8) Construction And/Or Reconstruction Of Infrastructure For Pedestrians And Cyclists, 9) Crossings Emergency Roads And Emergency Entrances To The Expressway, 10) Service Lanes, 11) Facilities Engineering Along The Expressway And On Roads Intersecting With The Expressway, 12) Area Drainage System, 13) Environmental Protection Devices, In Particular: Acoustic Protection, Animal Crossings, Ecological Culverts With Fencing Protective And Guiding, Greenery And Fencing Of The Expressway, Anti-Glare Screens, Protective Devices For Bats, Replacement Tanks For Amphibians, 14) Infrastructure For The Needs Of Expressway Facilities Located Along The Expressway Including: Power Supply And Lighting Networks, Water Supply Networks, Networks And Devices Sewage Treatment, Storm Sewage With Pre-Treatment Devices And Others, 15) Demolition Of Buildings And Structures, Demolition Of Road Elements, Culverts And Others, 16) Telecommunications Network For The Needs Of The Ordering Party, 17) Lighting Road, 18) Traffic Organization, Including Road Traffic Safety Devices, 19) After Completion Of The Works - Full Recultivation Of The Areas Occupied By Technical Facilities And Social, Construction Site, Temporary Roads - Made For The Needs Of The Contractor And The Construction Site And Any Other Areas Transformed By The Contractor, 20) Management System Movement, 21) Strengthening The Ground And Ensuring The Stability Of Slopes And Excavations And Embankments To The Extent Adapted To The Soil And Water Conditions, 22) Written Arrangements Between Contractors, Design Solutions At The Junction Of Adjacent Tasks. Purchaser Reserves The Obligation For The Contractor To Personally Perform Key Tasks, I.E. Paving The Main Route, Including Construction And Installation, And Execution Of The Remaining Layers Pavement Structure Above The Native Soil (Excavation) Or Embankment Soil (Embankment), With Excluding The Supply Of Materials And Services. Total Estimated Order Of Magnitude Of Value Orders Over Eur 20,000,000.
|