Quotation are invited for Flange Replacement Work in between Deaerator & Storage Tanks at Ph-I, E-Stn. SCOPE OF WORK FOR FLANGE REPLACEMENT WORK IN BETWEEN DEAERATOR & STORAGE TANK (M-3A) AT PH-I, E- STATION IN JEBEL ALI POWER STATION FABRICATION & ONSITE REPLACEMENT OF PIPE FLANGES IN BETWEEN DEAERATOR & STORAGE TANKS AT PH-I,E STATION DUE TO CORROSION AND DEEP PITTING CAUSING FREQUENT LEAKS FROM THE FLANGES. THIS IS ONE TO ONE REPLACEMENT OF EXISTING FLANGES. DETAILS ARE AS FOLLOWSPIPE F LANGE SIZE: ·#Ø20INCH,PIPE SCHEDULE 40,CS, WNRF, QTY.02SETS (1SET = 02FLANGE). CONTRACTOR SCOPE: ·#SITE SURVEY & SPOT MEASUREMENTS (UPON REQUEST) OF PIPES & ALL ATTACHMENTS IS TO BE DONE BY SUPPLIERS. ·#MOBILIZATION OF MANPOWER AS PER JOB SCHEDULE PROVIDED BY THE DEWA ENGINEER. ·#INSULATION REMOVAL AND SURFACE CLEANING FOR JOB & RE-FIXING AFTER TESTING. ·#CUTTING & REMOVAL OF OLD EXISTING FLA NGES PLACING ON DESIGNATED AREA. ·#EDGE PREPARATION & CLEANING TO MAKE READY FOR INSTALLATION. ·#NEW FLANGE TO BE SAND BLASTING & PA INTING TO MAKE READY FOR INSTALLATION. ·#FIT-UP OF FLANGES IN CORRECT POSITION AND DIRECTION PRIOR TO WELDING. ·#MISALIGNMENT BETWEE N THE NEW & EXISTING PIPE SHALL BE CHECKED THOROUGHLY. ·#FLANGE BOLT TORQUE TIGHTENING AFTER PLACING GASKETS ·#NO WELDING SHALL BE C ARRIED OUT WITHOUT APPROVAL OF DEWA ENGINEERS OF THE FIT-UP. ·#ONLY QUALIFIED/CERTIFIED WELDERS SHALL BE ENGAGED FOR ALL THE WELDING INCLUDING TACK WELDING. ·#WELDING SHALL BE DONE IN ACCORDANCE WITH THE APPROVED SPECIFIED WELDING PROCEDURE. ·#ALL MACHINES (CUTTIN G, GRINDING & WELDING ETC) TO BE ARRANGED BY CONTRACTOR WITH VALID TESTING & CALIBRATION CERTIFICATES FROM 3RD PARTY LICENSED CERTIF YING AGENCIES. ·#CONSUMABLE LIKE ELECTRODES, GRINDING AND CUTTING DISCS REQUIRED FOR CUTTING AND INSTALLATION. ·#IN GENERAL ALL ITEM S OF TOOLS, ACCESSORIES, CONSUMABLE, HOSES, CABLES, DISTRIBUTION BOARD ETC. OTHER THAN FACILITIES PROVIDED BY DEWA SHALL BE ARRANGED BY THE CONTRACTOR. ·#ALL RIGGING TOOLS (BELTS, SHILLINGS AND D-SHACKLES) ARRANGED BY CONTRACTOR, MUST BE TESTED & CERTIFIED. ·#INS PECTION TO BE DONE BY DEWA ENGINEER AT ALL THE STAGES ANY TIME. ·#THE CONTRACTOR SHOULD APPLY FOR WORK TO PERMIT IN THE PRESCRIBED F ORMAT IN ADVANCE BEFORE COMMENCING THE WORK. Qty: 1 Flange replacement work in between Deaerator <(>&<)> Storage Tanks at Ph-I, E-Stn. Contact Person: Gopal Tewari / GopalT@dewa.gov.ae / STANDARD TERMS & CONDITIONS 1) Prices should be DDP delivery duty paid at DEWA stores. 2) Quotation to be submitted only in local currency U.A.E Dirhams 3) DEWA Standard payment terms is 30 days credit from the date of acceptance of material 4) No DEWA staff or his or her relatives up to third degree should have ownership or partnership in your company, and your participation in DEWA tenders / RFQs should not constitute a Conflict or perceived Conflict of Interest. Supplier Registration: https://srm.dewa.gov.ae/irj/portal/anonymous/regis Tender Link : https://www.dewa.gov.ae/api/RfxDownload/Get/2332302510
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 72302970
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.