Tenders Are Invited For Technical Planning Services - Modernization Of The Würzburg Waste-To-Energy Plant - ... in Germany
Tender Notice
TenderID
71999241
Tender Brief
Tenders Are Invited For Technical Planning Services - Modernization Of The Würzburg Waste-To-Energy Plant - Specialist Planning Services - Retrofit Of Line 3
Technical Planning Services - Modernization Of The Würzburg Waste-To-Energy Plant - Specialist Planning Services - Retrofit Of Line 3. Planning Services - Modernization Of Mhkw/Retrofit Line 3 The Waste Management Association The Würzburg Area Owns The Mhkw Würzburg And Operates It In Cooperation With Stadtwerke Würzburg Ag. The Mhkw Würzburg Currently Has 3 Process Lines For The Thermal Utilization Of Municipal Waste, Including Commercial Waste And Sewage Sludge. Currently, Up To Around 215,000 T Are Processed Annually. Medium- And In The Long Term, At Least 200,000 T Should Be Recycled. To Make Sure Following The Disposal Order, Line 1 Went Into Operation In 2020 After Extensive Renovation Taken. The Modernization Of The Mhkw Würzburg Is To Be Further Pushed Forward. Goal Is To Safely And Efficiently Use The Resulting Waste Thermally And Continue To Do So A High Standard In The Area Of Environmental And Climate Protection As Well As Economical Business Management To Ensure. A Further Step Is A Retrofit Of Line 3. Retrofit Line 3 Means Upgrading Line 3 To A Throughput Of Reliable 120,000 T/A. The Project Includes: - Replacing The Grate - Replacing The Furnace Including Complete Air System/Air Preheater - The Structural Adjustment Of The Grate To Current Waste Composition - The Adjustments In The Firebox / Train 1 In The Lower One Area - The Reduction Of Nitrogen Oxides In Flue Gas Cleaning: Sncr On 3 Levels; Dismantling The Raw Gas Catalytic Converter - A Flow Simulation And Corresponding Adjustment Flue Gas Ducts In Front Of The Fabric Filter Compliance With The Limit Values According To The New, The Stricter 17.Bimschv, Which Is Valid From December 2023, Should Be Integrated Into The Planning Become. The Conversion Time For Line 3 Including Commissioning Without Trial Operation Was Assessed Estimated To Be Around 9 Months.
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 71999241
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.