|
1. The Subject Of The Contract Is The Installation Of Sswin, Cctv, Skd And Leakage Detection System At The Social Insurance Institution Inspectorate In Gniezno. The Subject Of The Contract Includes In Particular: 1.1. Implementation Of The Installation Of The Sswin Signaling And Assault System: - Installation Of Sensors On All Windows Indicated In The Documentation That Indicate Breaking The Glass Or Opening The Window, - Installation Of Sensors On All Doors To The Building Located On The Ground Floor (Staircase K1, K2, Side Entrance, Entrance To The Boiler Room, Garage Door) Signaling That The Door Is Ajar Or Opened, - Installation Of Panic Buttons At All Customer Service Stands In The Sok And At The Customer Advisors Stands - In Accordance With The Documentation, - Installation Of Motion Sensors In The Sok, In The Main Hall On The Ground Floor And On Communication Routes On All Floors, - Installation Of Optical And Acoustic Signaling Devices In Communication Routes On The Ground Floor And At The Entrance To The Building (Staircase K1 And K2), - Installation Of The System Control Panel Enabling Remote Signal Transmission To The Security Company And The Head Of The Inspectorate. - Commissioning And Measurements Address Surveillance Lines, - System Tests, - Employee Training, - Preparation Of As-Built Documentation, - Servicing The System During The Warranty Period. On The First Floor Of The Building, - Installation Of Internal Cameras On The Second Floor Of The Building, - Installation Of Internal Cameras On The Third Floor Of The Building, - Installation Of The Service Station In The Reception Room, - Installation Of The Recorder And Monitor In The Server Room, - Installation Of Cable Routes, - Installation Of Cabling, - Installation Of Alarm System Management Software, - Start-Up Of The Tvu System - Video Transmission Line, - Functional Tests Of The Television System Components, - System Tests And Measurements, - Employee Training, - Preparation Of As-Built Documentation, - Servicing The System During The Warranty Period, 1.3. Skd Access Control System Installation: - Installation Of Controllers On The Ground Floor Door, - Installation Of Controllers On The First Floor Door, - Installation Of Controllers On The Second Floor Door, - Installation Of Controllers On The Third Floor Door, - Equipping The Operators Station With A System (Computer, Monitor, Card Reader ) Enabling The Coding Of Access Cards, The Station Should Be Installed In The Inspectorates Secretariat, - Start-Up Of The Access Control System For Bus Controllers (Controllers), - Preparation And Testing Of The Alarm System Software, - Trial Operation Of The Access Control System - Post-Assembly Tests Of The Bus Controller (Controller), - Operation Access Control System Trial - Post-Assembly Tests Of The Identification Reader, - Trial Operation Of The Access Control System - Post-Assembly Tests Of Electromechanical Locking Elements, - System Tests And Measurements, - Employee Training, - Preparation Of As-Built Documentation, - Servicing The System During The Warranty Period, 1.4. Execution Of The Installation Asp Anti-Flooding System: - Installation Of An Alarm System In The File Storage Rooms On The Ground Floor, - Installation Of An Alarm System In The Ups Room, - Design Of A System That Automatically Closes The Water Inlet Valve To The Building In The Event Of Receiving A Signal About Flooding The Room, Note: Constant Water Supply To The Hydrant Installation. - Installation Of The System Control Panel In The Gatehouse And Enabling The Transmission Of Alarm Signals To A Security Guard, The Head Of The Inspectorate And Remote Transmission Of The Signal To The Intervention Group, - System Tests And Measurements, - Training Of Employees, - Preparation Of As-Built Documentation, - Servicing The System During The Warranty Period, 1.5. Instruction: Conducting Free Instruction To Users On The Correct And Safe Operation Of The Installations And Installed Devices. No. 11 To Swz (Opz, Design Documentation, Technical Specifications For The Execution And Acceptance Of Construction Works, Bills Of Quantities). Confidential Information Is Included In Appendix No. 13 To The Tor And Will Be Made Available To Contractors On The Terms Described In Point 2.1.9. Swz.2. The Required Features Of Construction Works Are Described In The Design Documentation, Which Includes Detailed Designs, Technical Specifications For The Execution And Acceptance Of Construction Works (Stwiorb) And Bills Of Quantities. No. 2 To Swz.
|