Tenders Are Invited For Project To Renovate The Equipment Of The Ss1 Booster Stations In Bouficha And Ss2 In Sidi Bouali (Governorate Of Sousse) Supply, Testing, Transport, Assembly And Putting In Good Working Order Of A Horizontal Electric Motor With Slip-Ring Rotor Mt-5.5Kv, Two Complete Rotors For Existing Pumps, An Electrolytic Starter And A Mechanical Starter Block. Deadline For Receipt Of Tenders: 14/07/2023 Date For Bid Opening: 14/07/2023 Lot No 1: Mt 5.5Kv Electric Motor For The Ss1 Overpressure Station: Supply, Factory Test, Packaging, On -Site Transport, Handling, Unloading, Assembly, On -Site Test And Setting Up Perfect Walking Order Of One (01) New Complete Horizontal Electric Motor With Rotor With 5.5Kv Rings Of Nominal Power Pn = 2210 Kw In Cascade Mode And 2410 Kw In Sinusoidal Mode. The Complete And Neat Disassembly Of The Existing Engine With Their Accessories And Their Storage In A Place Intended For Them In The Station. Provisional Deposit: 11 000 Lot No 2: Electrolytic Demarreur For The Ss2 Overpressure Station And Mechanical Block For The Electrolytic De -Rat For The Ss1 Overpressure Station: Supply, Factory Test, Packaging, On -Site Transport, Handling, Unloading, Assembly, The On -Site Test And The Perfect Walking Order Of A (01) New Complete Electrolytic Starter Required For Starting And Operating At Variable Speed Of The Bobini Rotor Electric Motor, Supply, Test In Factory , Packaging, On -Site Transport, Handling, Unloading, Assembly, On -Site Test And Perfect Walking Order Of A (01) Complete Mechanical Block Of The Electrolytic Starter, Complete Dismantling And Careful Of The Mechanical Block Of The Existing Starter With Their Accessories And Their Storage In A Place Intended For Them In The Station. Provisional Deposit: 5 000 Lot No 3: Complete Rotors For Existing Pumps In Ss1 And Ss2 Overpressure Stations: Supply, Packaging, On -Site Transport, Handling, Unloading, Assembly, On -Site Test And Perfect Order Of Walking Order A (01) New Full Rotor In Factory For The Existing Pump In The Ss1 Overpressure Station In Bouficha. Supply, Packaging, On -Site Transport, Handling, Unloading, Assembly, On -Site Test And The Perfect Working Order Of A (01) New Full Rotor Balance In Factory For The Pump Existing In The Ss2 Overpressure Station In Sidi Bouali. The Complete And Neat Dismantling Of The Two (02) Old Rotors Of Existing Pumps With Their Accessories And Their Storage In The Stations. Provisional Deposit: 15 000 [Disclaimer: The Above Text Is Machine Translated. For Accurate Information Kindly Refer The Original Document.] Tender Link : Http://Www.Marchespublics.Gov.Tn/Onmp/Appeldoffre/Viewappeldoffrefront.Php?Lang=Fr&Id_Appeldoffre=87837&
|