1. The Subject Of The Contract Is 24-Hour Protection Of Facilities (Including Buildings, Land, Property) Operated By The Silesian Provincial Branch Of The National Health Fund, In Accordance With The Rules And Conditions Set Out In The Swz. The Security Service Will Be Provided On The Terms Described In The Swz: A) In The Form Of Direct Permanent And Ad Hoc Physical Protection (E.G. Arrival Of Intervention Groups, Setting Up A Temporary Post) And - In The Case Of The Facilities Of The Silesian Branches Of The Ow Nfz - In The Form Of Constant Supervision Of Transmitted Signals, Collected And Processed In Electronic Devices And Alarm Systems (Monitoring) And B) In The Form Of Technical Security Consisting In The Operation, Maintenance And Repairs In The Places Where Electronic Devices And Alarm Systems (Closed Circuit Television Systems - Cctv And Burglary And Assault Signaling Systems - Sswin) Are Installed Threat To Protected Persons And Property. In The Facility Of The l skie Ow Nfz In Katowice At Ul. Kossutha 13, Security Will Be Provided Continuously 24 Hours A Day In A Two-Shift System (1St Shift - 12H; 2Nd Shift - 12H) Along With Running A Pass Office On Working Days, Except For Public Holidays From 7.30 To 17.00, With The Reservation That On The 1St And 2Nd Shift There Will Be One Employee Equipped With An Item Intended To Incapacitate People With Electricity With An Average Current In The Circuit Exceeding 10 Ma, Referred To In 2 Point 6 Of The Regulation Of The Minister Of The Interior And Administration Of Of 21 October 2011 On The Principles Of Arming Specialized Armed Protective Formations And The Conditions For Storing And Recording Weapons And Ammunition (Journal Of Laws Of 2015, Item 992), Hereinafter Referred To As The Sufo Regulation. The Contractor Is Responsible For Securing The Above-Mentioned Object For Incapacitation, In The Manner Described In 11 Section 3 Point 1 Of The Sufo Regulation - In A Device That Meets The Requirements Of At Least Class S2 According To Pn-En 14450 Or Equivalent, Permanently Attached To The Structural Elements Of The Building, Covered With 24/7 Armed Security. The Organization Of The Method Of Ensuring The Fulfillment Of The Requirement Referred To Above And The Cost Of The Device Rests With The Contractor. Method And Date Of Installation Of The Above-Mentioned Element Will Be Agreed With The Ordering Party At The Stage Of Contract Performance. In The Regional Offices Of The Silesian Ow Nfz (Bielsko-Bia a, Rybnik, Cz stochowa) Physical Protection Will Be Carried Out On Working Days For 12 Hours A Day (From 7.00 Am To 7.00 Pm) And Electronic Monitoring For The Remaining 12 Hours A Day (From 7.00 Pm To 7.00 Pm) At 7.00). On Days Off From Work, Electronic Monitoring Will Be Conducted 24 Hours A Day. Electronic Monitoring Of The Delegatures Will Take Place At From 7.00 P.M. To 7.00 A.M. On Working Days, And Around The Clock On Non-Working Days. During The Execution Of The Order (Contract), In The Event Of A Particular Threat To The Subject Of Protection (In A Given Location), The Contractor Should Ensure The Participation Of The Intervention Group In The Number Of Min. 2 People. The Maximum Reaction Time Of The Intervention Group Is 15 Minutes From The Moment Of Receiving A Telephone Call Or From The Moment Of Receiving A Threat Signal From The Burglary And Assault Alarm System And/Or The Fire Alarm System. During The Execution Of The Contract (Contract), The Contractor Should Ensure Strengthening Of Security In The Form Of Doubling The Number Of Physical Security Employees In Individual Facilities In The Event Of Difficulties In Maintaining Public Order In The Protected Area. The Increase In The Number Of Physical Security Staff Will Take Place Within A Maximum Of 150 Minutes From The Moment Of Receiving The Telephone Call. During The Execution Of The Contract (Contract), The Contractor Undertakes, In The Event Of Receiving A Signal About A Threat From Sswin, To Maintain The Post After 1 Hour From The Arrival Of The Intervention Group, On The Terms Set Out In The Draft Provisions Of The Contract (Maximum 200 Man-Hours), If Such Protection Proves Necessary . In Addition, The Contractor Undertakes To Monitor Signals From The Ssp During The Term Of The Contract And Undertakes To Follow The Instructions Of The Manufacturer Of The Ssp Control Panel. During The Execution Of The Contract (Contract), The Contractor Undertakes To Provide The Employer Additionally - At His Request - A Total Of No More Than 500 Man-Hours Of Direct Physical Protection In The Facilities Of The Silesian Ow Nfz Covered By This Contract, Outside The Agreed Hours Of Physical Protection. The Use Of These Hours By The Ordering Party Will Be Optional And Will Depend On Current Needs.2. Detailed Conditions And Rules For The Implementation Of Direct Physical Protection And Technical Protection Are Specified In The Form, Description Of The Subject Of The Contract And The Draft Provisions Of The Contract. In The Content Of The Offer, And Specifically In The Content Of The Form, The Description Of The Subject Of The Contract, The Contractor Should Undertake That: Experience In Performing The Tasks Of A Physical Security Employee; B) One Employee On Each Shift, In The Facility At Ul. Kossutha 13, 40-844 Katowice, Staying In The Monitoring Room), Is Authorized To Use An Object Designed To Incapacitate People With Electricity With An Average Current Value In The Circuit Exceeding 10 Ma, Referred To In 2 Point 6 Of The Sufo Regulation;C) All Security Personnel (Min. 1) Who Will Manage And Supervise Physical Security Personnel Performing Direct Physical Security Are Entered On The List Of Physical Security Personnel And Have At Least One Year Of Experience In Performing The Tasks Of A Physical Security Officer;D) All Security Personnel (Min. 1), Who Will Perform Technical Security Consisting In The Operation, Maintenance And Repair Of Electronic Devices And Alarm Systems (Closed-Circuit Television Systems - Cctv And Burglary And Assault Signaling Systems - Sswin) In The Places Where They Are Installed, Signaling A Threat To The Protected Persons And Property, Are Entered On The List Qualified Technical Security Workers And Have At Least 1 Year Of Experience In Performing The Tasks Of A Technical Security Worker. The Contractor Should Undertake To Secure Such A Number Of People In Each Of The Four Above-Mentioned Category That Will Ensure The Performance Of The Contract In Accordance With The Description Of The Subject Of The Contract (Contract) And Other Requirements Set Out In The Draft Provisions Of The Contract (Contract), As Well As In Accordance With Applicable Law, In Particular In Accordance With The Act Of August 22, 1997 On The Protection Of Persons And Property (I.E. Journal Of Laws Of 2021, Item 1995), By The Regulation Of The Minister Of The Interior And Administration Of October 21, 2011 On The Rules For Arming Specialized Armed Protective Formations And The Conditions For Storing And Recording Weapons And Ammunition (I.E. Journal Of 2015, Item 992), Without Violating The Provisions Of The Labor Code And The Act Of 10/10/2002 On The Minimum Remuneration For Work (I.E. Journal Of Laws 2020, Item 2207). In Relation To The Number Of People Employed On The Basis Of An Employment Contract Within The Meaning Of The Labor Code, Resulting From The List Of Persons Referred To In 2A Section 4 Of The Draft Provisions Of The Contract, The Ordering Party Reserves The Right To Verify The Possibility Of Performing The Contract With The Participation Of The Indicated Number Of Persons On An Ongoing Basis. If The Given Number Of People Employed Under An Employment Contract Within The Meaning Of The Labor Code Indicates A Violation Of Generally Applicable Legal Regulations In This Respect, In Particular Those Resulting From The Provisions Of The Labor Law On Working Time, The Contractor - At The Request Of The Employer Submitted In Writing - Will Be Obliged To Immediately ( Not Later Than 5 Days From The Date Of Receipt Of The Application) To An Appropriate Increase In The Original Number Of Persons. Increasing The Number Of People By Adapting It To The Requirements Of Applicable Law Will Not Translate Into An Increase In The Contractual Remuneration. Failure To Increase The Number Of Persons Within The Above-Mentioned Period Entitles The Ordering Party To Inform The National Labor Inspectorate Or Other Relevant Entities Of Existing Violations Of The Law, Including Labor Law. The Content Of The Offer, On The Basis Of Which The Selection Of The Contractor Will Be Made. The Description Of The Facilities Of The l skie Ow Nfz Is Also Attached To The Swz, And The Information Contained Therein Should Be Taken Into Account By The Contractor When Preparing The Offer. The Requirement Of Employment Under An Employment Contract, The Method Of Documenting Employment, And The Powers And Sanctions Are Specified In The Swz. The Employer Reserves The Obligation To Personally, I.E. Without The Participation Of The Subcontractor, Perform Key Parts Of This Contract By The Contractor, I.E. The Part Specified In Chapter Iii Sec. 1 Letter A Swz.
|