Stadtwerke Vlotho Gmbh Intends To Convert The Bus Stop At The Weser Secondary School In The City Center Of Vlotho. The Present Implementation Planning Includes The Planned Road And Civil Engineering Work As Well As The Manufacture Of Foundations For The Equipment Elements (Passenger Shelter And Furniture) In Vlotho, District Of Herford, State Of North Rhine-Westphalia. Stadtwerke Vlotho Gmbh, Hereinafter Referred To As Ag, Plans To Carry Out The Tendered Services For The Road And Civil Engineering Work At The Bus Stops. In The Course Of The Construction Work, The Bus Stop System Is To Be Reorganized In Terms Of Traffic Planning, Made Barrier-Free And The Traffic Conditions For Weaker Road Users Improved. The Measure Involves A Conversion At The Same Location. In The Area Of The Bus Stop, A Fundamental Expansion Of The Roadway In Asphalt Construction And The Ancillary Facilities In Paving Construction Are Planned. The Waiting Area Will Be Widened To 5.00 M. The Entire Area Is To Be Made Barrier-Free. The Curb Heights At The Stopping Areas Are To Be Raised To A Level Difference Of 18 Cm To The Roadway With A Bus Stone. The Tactile Guiding Elements Are To Be Paved Over With An Additional Accompanying Strip, Which Visually Separates The White Guiding Elements From The Gray Pavement By Means Of An Appropriate Color Contrast.Road Construction Approx. Loosen And Remove 740 M Of Soil Approx. Install Approx. 760 M Anti-Freeze And Base Course Material. 1,180 M Producing Asphalt Base And Surface Course Approx. Take Up 2,130 M Paving Approx. Laying 700 M Paving Approx. 410 M Curbs And On-Board Systems Set Approx. Make 360 M Channel Approx. 70 M Lay Tactile Guiding Elementsapprox. Create 180 M Drainage Pipe Approx. Lay 80 M Connecting Line Dn 150 Ppapprox. Make 7 Pcs. Road Gulliesapprox. 3 Pc. The Road Gullies Are All To Be Renewed By The Contractor And Reconnected To The Existing Mw Channel. The Existing Connection Lines And Old Street Gullies Are To Be Removed. The Existing Mixed Water Sewer Is Retained, Only Two Manhole Cones Need To Be Renewed And Installed Rotated By 180 Degrees. A New Box Gutter Is To Be Produced On The Staircase And Also Connected To The Existing Connecting Line. The Drainage Of The Entire Construction Site And The Drainage Of Rainwater In Each Construction Phase Is The Responsibility Of The Contractor, While Ensuring That There Is Sufficient Longitudinal And Transverse Gradient Of The Respective Work Planum. Special Attention Is Drawn To The Fact That All Necessary Expenses For The So-Called Makeshift Water Supply During The Production Of The Individual Superstructure Layers Are Included In The Unit Prices. Deriving Or Pumping Out The Precipitation Water Is An Ancillary Service And Is Not Remunerated Separately. Three New Passenger Shelters (Fgu) Including Foundations Are To Be Set Up By The Contractor. The Fgusers Have Integrated Lighting And Are To Be Set Up In Separate Recesses At The Rear Edge Of The Walkway. Due To The Terrain Sloping To The Rear, Angle Brackets Must Be Prepared In Advance. The Ag Will Convert The Street Lighting To Led Technology. The Topsoil In The Green Areas Must Be Covered To A Thickness Of 10 To 20 Cm. The Topsoil To Be Removed Must Be Removed And New Topsoil Delivered. The Necessary Pruning And Clearing Work On The Shrubs Must Be Carried Out By The Contractor In Advance.
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 61551955
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.