Kantonsstrasse No. 1, Sargans: Street Design, Markthalle Section To The Bergwerk Junction. North Of Sargans, The Section Of The Market Hall On The Sarganserstrasse Up To And Including The Gonzen Mine Junction Will Be Made More Compatible With Settlement. A Concrete Roundabout Will Be Built At The Rheinstrasse/ Vilderstrasse Junction. It Is Planned To Separate The Roadway With A Multi-Purpose Strip And To Create A New Pedestrian And Cycle Path. The Multipurpose Strip Is Made Safer With Furniture/Trees. The Crossing Areas Are Secured With Central Islands. Various Utility Lines Such As Gas, Water, Telephone, Electricity And Sewerage With Street Drainage Have To Be Adapted. Main Masses: Broken Pavement 9000 T Cable Protection Pipes 2,300 M Displacement Piles 9,900 M Excavation 13000 M3 Kg 045 9,500 M3 Finishes 7,500 M Act 16N 700T Act 22S 2100 T Acb 22S 2100 T Ac 8S 610T Sda 8 220T Acf 22 480T Bus Panel: D=220 Mm 700 M2 Rotor: D= 260 Mm 1600 M2 Excavation Channel 9000 M3 Sprouts 5000 M2 Structural Concrete 700 M3
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 61542752
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.