Devon County Council (Dcc) Are Delivering A Key Piece Of Infrastructure On Behalf Of Teignbridge District Council (Tdc) In The Shutterton Area Of Dawlish (Grid Ref – 296289, 78512). Homes England Are An Interested Party.It Is Anticipated That The Scheme Will Provide A Section Of New Link Road, Through A Green Field Site, Which Will Eventually Join Up With 3Rd Party Infrastructure And Housing Deliveries.Dcc’S Scheme Extends On From The First Section Of Link Road That Has Been Built By Persimmon Homes.It Is Anticipated That The “Dawlish Hif (Housing Infrastructure Fund)” Scheme That Dcc Are Delivering Includes, But Not Limited To, The Construction Of:• A 26M Span Highway Bridge• Approximately 110M Of Highway Embankments On The Approaches To The Bridge, Including Carriageway And Foot/Cycle Paths• Approximately 360M Of At Grade Carriageway• Surface Water And Foul Water Drainage Features• Drainage Basins, Swale And Associated Items• Ecological Mitigation Enhancement Features• Landscaping• Fencingdevon County Council Has An Expectation To Deliver The Full Scope Of The Works In Connection With The Delivery Of The Infrastructure Between Ch310 To Ch800, On Behalf Of Teignbridge District Council. For Further Information, Please Refer To The Scope Documents. Devon County Council And Teignbridge District Council Will Aim To Deliver A Reduced Scope Of Works (Ch310-440 Only) Only If The Tender Offered By All Tenderer’S For The Full Scope Of The Works Is Above The Available Funding Budget Available Or Below The Minimum Quality Or Tdc Full Council Does Not Approve The Additional Funding To Allow For Its Award. In Addition, Dcc Shall Not Award All Or Some Of The Lots Until The Necessary Land And Highways Agreements Have Been Secured.The Maximum Funding Available For The Works Is £4,900,000.00. The Maximum Funding Available For The Reduced Scope Of Works, In The Eventuality That Additional Funding Is Not Approved By Tdc, Is £3,700,000.00.The Procurement Has Been Divided Into Lots. Tenderers May Bid For One Or More Of The Following Lots:Lot 1 Bridge And Spine Road (Entire Scheme Ch310-800)This Includes For The Entire Scheme Works In Accordance With The Entirety Of The Contract Documents. Therefore, The Delivery Of All Features Within The Contract Documents In Connection To The Delivery Of Infrastructure Between Chainages 310 And 800.These Works Are Consented Under Planning Consents References 21/02872/Ful And 21/02674/Maj.Lot 2 Bridge Works Alone (Reduced Scheme Ch310-440 Only) - Additional Funding And Lot 3 Bridge Works Alone (Reduced Scheme Ch310-440 Only)This Includes For A Reduced Extent Of Scheme Works. Lot 2 And 3 Is For The Delivery Of All Features Within The Contract Documents In Connection To The Delivery Of Infrastructure Between Chainages 310 And 440 Only.These Works Are Consented Under Planning Consents Reference 21/02872/Ful.There Is A Limit On The Number Of Lots Awarded To One Provider. Dcc Is Expecting To Appoint 1 Contractor For Lot 1. If Tdc Full Council Does Not Approve The Funding For The Preferred Tenderer’S Tender Price Or Tender Returns Be Returned At A Level That Does Not Achieve A Qualitative Evaluation Score Of 50% Or More Of The Total Percentage Available For Quality Or Planning Permission For The Planning Application Reference ‘21/02674/Maj’ Is Refused By Tdc, Dcc Is Expecting To Appoint 1 Contractor For Lot 2 Instead, Which Is A Reduced Scope Of Works. If Tdc Do Not Approve The Additional Funding Required To Deliver Lot 1 Or 2, Dcc Is Expecting To Appoint 1 Contractor For Lot 3 Instead.Works Are Anticipated To Commence Spring/Summer 2023.Dcc Reserves The Right To Not Award All Or Some Of The Lots.Dcc Will Not Award All Or Some Of The Lots If Tender Returns Be Returned At A Level That:• Is Above The Maximum Funding Available For The Full Scope Of The Works, Which Is £4,900,000.00 For Lots 1 And 2 And £3,700,000.00 For Lot 3• Does Not Achieve A Qualitative Evaluation Score Of 50% Or More Of The Total Percentage Available For Qualitydcc Will Not Award All Or Some Of The Lots If Homes England Do Not Consent Or One Of The Three Lots Are Awarded Or Tdc Full Council Does Not Approve The Additional Funding Required For Lot 1 And 2.In Addition, Dcc Shall Not Award All Or Some Of The Lots Until The Necessary Land And Highways Agreements Have Been Secured, Further Information Is Included At Clauses 2.5 And 2.6 And Annex A Of The Itt. In The Case Of Lot 1, Dcc May Not Award Until Planning Permission Has Been Granted By Tdc For The Planning Application Reference ‘21/02674/Maj’.
Contact Information
Contact Person
Chloe Staddon
Address
County Hall,Exeter,Devon,Ex2 4Qd,United Kingdom
Contact No.
+44 1392383000
Email
chloe.staddon@devon.gov.uk
Other Detail
Complete details of the selected Tender
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 59923728
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.