Quotation Are Invited For Air Preheater Basket Replacement D-Phase 2 - Boiler# 7 Aph Bas 1032204692Rfx Description Standard Terms & Conditions 1) Prices Should Be Ddp Delivery Duty Paid At Dewa Stores. 2) Quotation To Be Submitted Only In Local Currency U.A.E Dirhams 3) Dewa Standard Payment Terms Is 30 Days Credit From The Date Of Acceptance Of Material 4) No Dewa Staff Or His Or Her Relatives Up To Third Degree Should Have Ownership Or Partnership In Your Company, And Your Participation In Dewa Tenders / Rfqs Should Not Constitute A Conflict Or Perceived Conflict Of Interest. 1 Item-00001 Scope Of Work For Air Preheater Basket Replacement In D-Station Phase-2, Boiler No 7 -#Contractor To Visit The Site Before Submittin G The Quotation -#Contractor Must Have Previous Experience On Executing The Similar Type Of Job -#Opening Of Duct Top Side Bolted Do Ors To Facilitate The Baskets Replacement -#Cutting Of Duct Plates If Required For Access -#Removal Of Insulation -#Installation Of Monorail For Removing The Aph Baskets -#Removal Of Hot End And Cold End Baskets -#Level Checking Of Sector Plate And Attending Align Ment Of The Same For Any Deviation. -#Checking/Setting/Repairing Of Static Seals, Axial Seals -#Checking/Inspection/Repair And Setti Ng Of Radial, Axial And Bypass Seals At Cold And Hot End -#Inspect/Repair/Rectification Of All Sector Plates At Cold And Hot End 1 Job Sid Es By Weld Repair /Flush Grinding - #Inspect/Repair/Rectification/Alignment/Set Ting Of Axial Seal Plates With Respect To Sector Plate S And Seals -#Inspect/Repair/Rectification Of T-Bar At Cold And Hot End Sides Including Replacement Of Eroded Bolts And T-Bar Holdin G Angles. -#Checking And Alignment Of Guide And Support Bearings Including Oil Replacement And Flushing Of Both End Side Bearing Wit H Filling New Oil. -#Overhauling/Servicing And Replacement Of Guide Bearing Assembly/Oil Level -#Transportation Of Requisite Steel M Aterial And Baskets From Mmd Sub Store / Main Store. -#Gap Checking/Clearances Of Radial Seal And Recording The Same, If Seal Is Fou Nd Disturbed, It Is To Be Reset As Per Actual / Design Value. -#If Any Seal Found In Badly Damaged Condition, Contractor Has To Repl Ace The Same. -#Contractor Has To Detect The Puncture And Arrest The Same With New Patch Providing Work. -#Duct Casing Shield Plate Welding If Found Any Crack/Damages -#Balancing Of Rotor By Manually Rotating The Rotor Assembly -#Preparing And Fixing Of Weights At Appropriate Place During Rotor Balancing -#Fixing Of New Of Hot End And Cold End Baskets -#Closing Of All Manholes Doors By Providi Ng New Sealing Rope. -#Witnessing Trial Run And Attending Defects If Any Like Rubbing Noise, Fouling Etc# By Adjustments -#Work Shal L Have To Be Carried Out Strictly On War-Foot Basis As Per Instruction Of Mmd. -#Final Report To Be Submitted. Cold End - One Container - 1 Box, Total 12 Container X 1 Box - 12 Nos Per Unit Special Notes / Instructions: D-Phase 2 - Boiler 7 Aph Basket Replacement; Contact Person: Satheeshkumar Ramadoss/ Satheeshkumar.Ramadoss@Dewa.Gov.Ae / 043226031 / +971504069988 Tender Link : Https://Www.Dewa.Gov.Ae/Api/Rfxdownload/2332202947
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 58986541
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.