Quotation Are Invited For Ceramic Coating On Chiller Condenser Tube Sheets And End Covers Water Boxes Ceramic Coating On Chiller Condenser Tube Sheets And End Covers Water Boxes For 4 Nos Of Daikin Water Cooled Chillers At New Acad Emy Building A Scope Of Works The Contractor Is Required To Quote Lump Sum Price For Ceramic Coating On Condenser Tubes En D Covers And Water Boxes For 6 Nos Of Trane Water Cooled Chillers The Quotation Will Be Submitted As Per Dewa Specification And S Urvey Only Contractor Shall Visit The Site And Take Necessary Measurement And Connections As Per Existing Conditions Contracto R To Arrange Crane And Rigging To Remove And Fix The End Covers As Per Site Requirement Dismantling The End Plates Drying The Tube Sheet And Flash Out Any Water Contents Inside The Tubes Using Air Blower Covering The Chiller Using Tarpaulin To Minimize Du St Plugging The Tubes Of Chiller Condenser Tube Sheets Using Plug Grit Blasting The Chiller Condenser Tube Sheets And End Cove Rs To Sa 2 1 2 Standard Rebuild The Pitted Area On The Tube Sheet And End Covers With Metal Putty The Eroded Pitted Area Only O N Tube Sheets And End Covers Of Chiller Condenser Will Be Filled Rebuild With Metal Putty Resimac 101 Apply 2 Coat System Of Ceramic Coating Material On Tube Sheet And End Covers Apply Two Coat System Of Ceramic Coating Material Resimac 203 Both On Tub E Sheets And End Covers Of Chiller Condenser At 500 Micron Dft Minimum Cary Out Pin Hole Holiday Test On End Coavers Only Using Elcometer Positector Cary Out Thickness Test To 500 Micron Dft Minimum Using Elcometer Positector Remove The Plugs Clean Ing The Area Fix Back The Condenser Water Boxes Commissioning The System And Final Testing Under The Presence Of Dewa Supervis Or Engineer Contractor To Hand Over The Cooling Towers In Working Condition Testing Installing And Commissioning The Complete System As Per Existing Site Requirements And Manufactures Recommendation The Job Execution Shall Be Carried Out In The Timing Ass Igned By The Dewa Engineer The Contractor Is Required To Take All Precaution So As Not Damage Any Of The Existing Equipment Struc Ture Etc Contractor Staff Is Required To Wear Proper Personal Productive Equipment At All Times Inside The Premises All Health And Safety Measures Signboards Fire Blanket Fire Extinguishers Etc To Be Followed Up Strictly Contractor Has To Provide Materi Al Submittal Method Statement And Schedule Of Work To The Engineer For Approval Before Carrying Out The Installation In Case Of Un Satisfactory Performance The Lpo Will Be Cancelled Giving 15 Days Notice Contact Person For Site Visit Mr Akbar Ali 052 86 82151 And Mr Mohideen 055 3810513 04 3227879 B General Condition Mobilization At Site Of The Contract Spare Parts Requi Red To Carry Out The Rectification Activity Should Be Arranged At The Earliest In Order To Keep The Equipment Down Time To Minimum A Nd Must Be Genuine Spares From Oem Or Oem Recommended Vendors All The Materials In General Will Conform As Per Latest Standards And Shall Be Submitted To Dewa For Engineers Approval The Contractor Is Required To Take All Precaution So As Not Damage Any Of The Existing Equipment Structure Ete The Contractor Shall Deploy The Skilled Technicians For Carrying Out The Works Should We Experience A Breakdown In Any Of Equipment System At Any Time Of The Day Or Night You Will Respond To Our Request With Your 24 Hou Rs Emergency Call Out System Available 7 Days A Week Responding Time To Breakdown Calls Is Within 1 Hour After Receipt Of Notificat Ion All Activities Shall Be Performed In Presence Supervision Of Competent Supervisor Contractor Shall Obtain All Necessary A Pprovals Clearance From Concerned Dewa Engineer Supervisor Before Commencing Any Maintenance Activities Supervisor Shall Be Resp Onsible For The Safety Of Men Equipment During The Activities And Also Must Ensure That Work Executed Is Of Highest Standard Con Tractor Shall Take Care Of All Related Formalities Like Mobilization Of Staff Ensuring Tools Test Equipment S Are Available At Si Te For Carrying Out The Corrective Maintenance Activities Transportation Of Staff From To Site Shall Be Arranged By The Contracto R Dewa Will Not Accept Any Claim For Extras Beyond The Order Price During And After The Execution Of Work Unless Claim With Prop Er Justification Is Approved By Dewa Management Contractor Shall Be Responsible For Any Discrepancies Or Damages Of The Existing System During Execution Of The Work Qty 4Ceramic Coating On Chiller Condenser Tube Sheets And End Covers Water Boxes For 4 Nos Of Daikin Water Cooled Chillers At New AcademyBuilding As Per The Attached Specification Contact Person For Site Visit Mr Akbar Ali 052 8682151 And Mr Mohideen 055 3810513 04 3227879 Standard Terms Conditions1 Prices Should Be Ddp Delivery Duty Paid At Dewa Stores 2 Quotation To Be Submitted Only In Local Currency U A E Dirhams3 Dewa Standard Payment Terms Is 30 Days Credit From The Date Of Acceptance Of Material4 No Dewa Staff Or His Or Her Relatives Up To Third Degree Should Have Ownership Or Partnership In Your Company And Your Participation In Dewa Tenders Rfqs Should Not Constitute A Conflict Or Perceived Conflict Of Interest
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 50421998
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.