Prequalification Required The Owner Will Only Accept Bids From Contractors That Have Been Prequalified Scope Of Work The Project Consists Of But Is Not Limited To The Following Major Elements Bidder Agrees To Furnish All Materials And Equipment And To Perform All Labor Necessary To Construct The Hudson River Water Reclamation Facility As Shown On The Attached Overall Site Plan And As Detailed In The Below Table Entitled Table 1 Please Be Advised That The Complete Set Of Drawings Will Be Released To All Prequalified Contractors On April 20 2022 The Work Shall Include But Not Be Limited To A Raw Sewage Pump Station Plant Pump Station Headworks With A Mechanical Screen And Grit Separator Two 2 Sequencing Batch Reactors A Post Equalization Basin A Concrete Structure To House A Future Sequencing Batch Reactor Tertiary Disc Filters A Chlorine Contact Chamber An Effluent Structure With A Low Profile Cascade Aerator And Metering Flume An Aerobic Digester A Concrete Structure To House A Future Aerobic Digester A Sludge Dewatering Building A Bulk Chemical Storage Structure A Chemical Feed Building A Blower Electrical Building A Control Building Instrumentation On Site Generators Electrical And Scada The Work Also Includes But Is Not Limited To Clearing And Grubbing Earthwork Site Work Yard Piping Stormwater Piping Asphalt And Gravel Roads Erosion And Sediment Control Measures Grassing Construction Staking Mobilization Demobilization Bonds Insurance Delivery Of Materials Taxes And All Other Appurtenances Necessary For Completion Of The Work Time Allotted For Completion Of Work Is 720 Calendar Days From The Date Of A Written Notice To Proceed From Owner The Work If Awarded Will Be Awarded In One 1 Contract
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 49137895
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.