Quotation Are Invited For Ceramic Coating On Condenser Tube Sheets And End Covers Water Boxes Ceramic Coating On Condenser Tube Sheets And End Covers Water Boxes For 6 Nos Trane Water Cooled Chillers At Jebel Ali New Staff A Ccommodation Block A B A Scope Of Works The Contractor Is Required To Quote Lump Sum Price For Ceramic Coating On Conden Ser Tubes End Covers And Water Boxes For 6 Nos Of Trane Water Cooled Chillers The Quotation Will Be Submitted As Per Dewa Specif Ication And Survey Only Contractor Shall Visit The Site And Take Necessary Measurement And Connections As Per Existing Conditions Contractor To Arrange Crane And Rigging To Remove And Fix The End Covers As Per Site Requirement Dismantling The End Plates Drying The Tube Sheet And Flash Out Any Water Contents Inside The Tubes Using Air Blower Covering The Chiller Using Tarpaulin T O Minimize Dust Plugging The Tubes Of Chiller Condenser Tube Sheets Using Plug Grit Blasting The Chiller Condenser Tube Sheets And End Covers To Sa 2 1 2 Standard Rebuild The Pitted Area On The Tube Sheet And End Covers With Metal Putty The Eroded Pitte D Area Only On Tube Sheets And End Covers Of Chiller Condenser Will Be Filled Rebuild With Metal Putty Resimac 101 Apply 2 Co At System Of Ceramic Coating Material On Tube Sheet And End Covers Apply Two Coat System Of Ceramic Coating Material Resimac 20 3 Both On Tube Sheets And End Covers Of Chiller Condenser At 500 Micron Dft Minimum Cary Out Pin Hole Holiday Test On End Coave Rs Only Using Elcometer Positector Cary Out Thickness Test To 500 Micron Dft Minimum Using Elcometer Positector Remove The Plugs Cleaning The Area Fix Back The Condenser Water Boxes Commissioning The System And Final Testing Under The Presence Of Dewa Supervisor Engineer Contractor To Hand Over The Cooling Towers In Working Condition Testing Installing And Commissioning The Complete System As Per Existing Site Requirements And Manufactures Recommendation The Job Execution Shall Be Carried Out In T He Timing Assigned By The Dewa Engineer The Contractor Is Required To Take All Precaution So As Not Damage Any Of The Existing Eq Uipment Structure Etc Contractor Staff Is Required To Wear Proper Personal Productive Equipment At All Times Inside The Premises All Health And Safety Measures Signboards Fire Blanket Fire Extinguishers Etc To Be Followed Up Strictly Contractor Has To P Rovide Material Submittal Method Statement And Schedule Of Work To The Engineer For Approval Before Carrying Out The Installation In Case Of Un Satisfactory Performance The Lpo Will Be Cancelled Giving 15 Days Notice Contact Person For Site Visit Mr Akba R Ali 052 8682151 And Mr Mohideen 055 3810513 04 3227879 B General Condition Mobilization At Site Of The Contract Spar E Parts Required To Carry Out The Rectification Activity Should Be Arranged At The Earliest In Order To Keep The Equipment Down Time To Minimum And Must Be Genuine Spares From Oem Or Oem Recommended Vendors All The Materials In General Will Conform As Per Lates Qty 6Ceramic Coating On Condenser Tube Sheets And End Covers Water Boxes Contact Person Mr Akbar 0528682151Standard Terms Conditions1 Prices Should Be Ddp Delivery Duty Paid At Dewa Stores 2 Quotation To Be Submitted Only In Local Currency U A E Dirhams3 Dewa Standard Payment Terms Is 30 Days Credit From The Date Of Acceptance Of Material4 No Dewa Staff Or His Or Her Relatives Up To Third Degree Should Have Ownership Or Partnership In Your Company And Your Participation In Dewa Tenders Rfqs Should Not Constitute A Conflict Or Perceived Conflict Of Interest
Contact Information
Other Detail
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 46558498
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.