A E Statement Of Work Maintain Building 1 Sub Basement Amp Basement Utilities Project 608 21 100 Introduction The Basement And Subbasement Utilities Are In Desperate Need Of Inspection And Replacement This Project Would Address The Main Culprits Of The Deficient Utilities Specifically The Steam Generation And Condensate Return Systems The Work Will Include Replacing Steam Traps Steam Lines Condensate Lines Strainers Valves Pressure Reducing Valves And Pump Stations The Underground Steam Supply And Condensate Return Will Also Be Replaced During This Effort There Should Be Redundancy Of Underground Utilities To Preclude Unnecessary Trenching To Maintain These Lines There Will Be Some Remaining Asbestos Insulation Scattered In Minimally Accessible Areas Where The Steam Water And Electrical Piping Is Located That Will Need To Be Abated As It Is Found The Majority Of The Work For This Project Would Occur In The Basement And Subbasement Of Building 1 And 15 The Project Is Slated For Construction In 2022 There Will Be Two Items Which Will Be Priced As Deduct Alternates These Items Are As Follows Feasibility Study Of Switching From Steam Heat In Hospital Bldg 1 And 15 To Hot Water Heating Via Steam To Hot Water Heat Exchangers Feasibility Study And Conceptual Design Of Medical Center Water Treatment System Scope The Scope Of This Project Consists Of Architectural And Engineer A E Services Required To Complete The Project The Period Of
Contact Information
Other Detail
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 39907672
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.