Contract Notice Footbridge Construction WorkConstruction Work For A Metal Footbridge To Cross The Railway NetworkDescription The Purpose Of The Consultation Is To Build A Metal Railway Crossing Footbridge At Quimper Station Approximately 85 M Long 4 60 M Wide The Footbridge Crosses The Entire Beam And Serves The Two Central Platforms The Contract Includes The Realization Of The Foundations The Structure Framework The Equipment Four Elevators Their Power Supply And Alarm Reports Four Staircases Lighting Guardrails Ep Descents And Network Connections Reservations For Passenger Information And Video Protection Equipment The Contract Is Part Of The Operation To Develop The Multimodal Exchange Hub Pem The Contracting Authority Imposes A Possible Additional Service Photovoltaic The Procedure Is The Call For Tenders Opened In Application Of Articles L 2124 2 R 2124 2 1 And R 2161 2 To 5 Of The Public Procurement Code Provisional Notification Date April 2021 A Site Visit Is Possible See Rc Time Limit For Receipt Of Tenders Or Requests To Participate Date 08 01 2021 Local Time 16 00 Disclaimer The Above Text Is Machine Translated For Accurate Information Kindly Refer The Original Document
Contact Information
Other Detail
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 34380509
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.