Combined Synopsis Solicitation For Qty 11 Aluminum Enclosure To House Seismic Equipment And Its Ancillary Systems This Is A Combined Synopsis Solicitation For Commercial Items Prepared In Accordance With The Format In Subpart 12 6 As Supplemented With Additional Information Included In This Notice This Announcement Constitutes The Only Solicitation Proposals Are Being Requested And A Written Solicitation Will Not Be Issued The Solicitation Number Is Issued As A Request For Quotation Rfq 140G0320q0212 The Solicitation Document And Incorporated Provisions And Clauses Are Those In Effect Through Federal Acquisition Circular 2020 07 08 Dated 08 31 2020 Set Aside For Small Business Naics 221114 Electric Solar Power Generation Solar 250 Naics 332311 Prefabricated Metal Building And Component Manufacturing 750 Qty 11 Aluminum Structure Containing Solar Panels Grounding Communication Surge Protection Solar Conditioning And The Enclosure To House Seismic Equipment And Its Ancillary Systems Brand Name Or Equal To Sunwize Swingset Product Code 210423 In Accordance With Far 52 211 6 August 1999 Delivery Date 30 Days From Date Of Award Stored Up To One Year At Contractor s Facility Until The Usgs Can Schedule Pick Up See Storage Of Enclosures Section Attachments 889 Certification Document 2 Pages Drawing 1 Swingset Updated Design Drawing V7 6 Pages Drawing 2 Solar Power Panel V20 1 Page Swingset Enclosure Build Standards Scope The Scope Of This Section On The Swingset Build Is To Relay The Usgs s Requirements For A Pre Installation Fully Constructed Swingset Solar And Power System Terms And Definitions 1 Swingset Aluminum Structure Containing Solar Panels Grounding Communication Surge Protection Solar Conditioning And The Enclosure 2 Stanchion 2 Id Aluminum Pipe Either 2 Sch40 Or 2 Conduit Typically Used For Mounting The Solar Panels Antenna And Enclosure 1 Nominally Conduit Pipe And Sch40 All Mean 2 Id 2 3 8Th Od Aluminum Pipe 2 Two Types Of Aluminum Pipe Can Be Used Sch40 2 Aluminum Or 2 Aluminum Conduit Materials 1 All 20 Bolts Hex Head Screws Will Be 18 8 Ss 2 All Washers Will Be Ss 3 All Lock Washers Will Be Ss 4 All Aluminum Pipe Threads Will Have Anti Seize Placed On Their Threads 5 All Nuts Will Be Brass 6 All Pipe Will Be 2 2A Aluminum Conduit Or 2 Sch40 Aluminum Pipe Pre Cut To Length 7 Any Metal Touching Aluminum Is Limited To Ss Bronze Or Brass Or Galvanized Metals Stanchion Legs 1 All Four Stanchion Legs Will Have X2 20 Ss 1 Bolts Tapped Into The Base Of Each Leg The Lowest Bolt Will Be 1 From The Base Of The Leg And The Second Bolt Will Be Placed On The Opposite Side Of The First Bolt 20 From The Base Of The Leg Each Bolt Will Have One Brass Or Stainless Nut Threaded Onto The Bolt In Order To Tighten The Bolt Securely For Transport 2 The Four Vertical Stanchion Legs Will Have Bituminous Paint Applied From The Base Of The Vertical Stanchion Up 36 The Legs Will Be Dipped Into The Paint In Order To Coat The Inside A 3 Or 4 Pvc Pipe With Caps 48 Long Can Provide The Mechanism To Dip Them Swingset Framing Materials 1 2A Rigid Aluminum Conduit Or Sch40 Pre Cut Aluminum 2 Pipe Od 2 375 2 All Aluminum Pipe Threads Will Have Anti Seize Generously Brushed On The Pipe Coupling Threads 360 Degrees Around Threads 3 All Aluminum Conduit Or Pipe Will Be Free Of Defects Such As Bends Or Holes Or Flawed Threads 4 Tolerance All Vertical Stanchions Upon Finish Will Be Vertical Within 1 At 10 Above Bottom Of Enclosure For The Rear Stanchions And Within 5 At 4 Above The Bottom Of The Enclosure For The South Stanchions 5 Each Vertical Stanchion X4 Will Have A 125 Weep Hole Drilled At 25 Measured From The Bottom Of The Stanchions Solar Array 1 Due To The Nature Of Solar Panel Innovation Advances In Efficiency Etc The Solar Panels Will Be Approved By The Usgs Before Being Purchased And Installed 2 Solar Panels Will Be Unused 3 Panels Such As Topoint 190W Jtm190 72M Mono Silver Frame Solar Or Similar Better Quality Will Be Used 4 Solar Panels Will Be 24V Panels 5 Solar Panels Will Be Framed Offset Brackets 1 No Anti Seize Required For Galvanized Bolts And Nuts 2 All 7 8Ths Bolts Will Be Tightened Between 150 And 250 Inch Pounds And Verified With A Torque Wrench The Reason For The Disparity Is Due To Aluminum Conduit Inconsistencies And Deformation With Different Torques The Aluminum Conduit Should Not Deform More Than A 16Th Of An Inch When Torqueing The Bolts 3 All 7 8Ths Bolts Will Be Threaded In Such A Way That The Smooth Bolt Side Will Be Against The Plate 4 All Offset Brackets Will Be Squared With The Swingset Structure 5 All U Bolts On The Offset Brackets Will Be Evenly Tightened So That The Bolt Threads Appear Even Solar Panel Aluminum Angle 1 Aluminum Angle Used To Mount The Solar Panels To The Pipe Structure Will Be Made Of 6061 T6 1 5X2X 25 Aluminum The 1 5 Side Of The Aluminum Angle Will Attach To The Solar Panel Frame 2 1 2 Holes Will Be Drilled For The 3 8Th Inch U Bolt Mounting Holes In Order To Create Some Play In The Structure Assembly The Holes Will Be Deburred 3 The 3 8 U Bolts Holding The Angle To The 2 Conduit Will Be Verified With A Torque Wrench 4 Hardware Used To Mount The Aluminum Angle To The Solar Panel s Frame Will Be Ss 18 8 1 4 20 X 1 5 With Ss Washers Ss Lock Washer And Brass Hex Nut 5 5 16 Holes Will Be Drilled Through The Aluminum Angle And Solar Panel Frames For The Ss 1 4 20 Bolts With Brass Nuts The Holes Will Be Deburred 6 The Aluminum Angle Will Be Mounted In Such A Way That The Brass Nut And Bolt Will Be Centered When Exiting The Solar Panel Frame On The Back Inside Of The Frame And Will Not Affect The Solar Laminate 7 The Solar Panels Will Be Square With The Aluminum Pipe And The Aluminum Pipe Will Be Square With The Vertical Stanchions 8 The Solar Panel Electrical Cables Will Originate From The East Side Of The Structure Once The Solar Panel Frame Is Erected Onto The Main Swingset Stanchions 9 The Threaded End Of The Cut Aluminum Conduit Will Be Located On The Downward Side Of The Solar Structure With Couplings Attached And Anti Seize Applied 10 The Plane Of The Finished And Installed Solar Panel Will Not Contort More Than 1 16 Inch From Corner To The Opposite Corner Enclosure 1 60 Slope Top Aluminum Enclosure Will Be Made From 5052 Aluminum 2 60 Slope Top Aluminum Enclosure Will Be Mig Or Tig Welded On All Joints That Combine Edges 3 The Enclosure Will Be Square And Lie Flat On A Level Surface 4 The Enclosure Will Have X2 60Lbs Assistance Lid Opening Pistons Pistons Will Be Mounted In Such A Way That They Will Not Interfere With Any Other Components Of Enclosure Lid Power Panel Etc 5 The Enclosure Will Have Two Punch Sets Of Breather Louvers Located On The Uppermost Area On The East And West Sides Hardware Cloth Or Similar Fine Aluminum Mesh Will Be Installed Using Silicone On The Inside Of The Louvers To Deter Insect Intrusion North Is Defined As The Sloped Side Of The Enclosure 6 The Grounding Bus Will Be Located On The West Side 10 From The Bottom And Starting At 10 From The South Side The Bus Will Be Level With The Floor Of The Enclosure 7 One Primary Enclosure Shelf Made From 5052 Aluminum Needs To Be Mounted Inside Welded Or Bolted If Bolts Then 20 See Swingset Updated Design Drawing V7 Pdf Shelf Should Run The Entire Length Of The Enclosure And Have A Lip On The Exposed 60 Side 8 One 5052 Aluminum Secondary Shelf Below The Primary Enclosure Shelf Needs To Be Mounted Welded Or Bolted If Bolts Then 20 9 The Secondary Shelf Will Be Bent So The Weight Bearing Component Tilts Upward This Will Ensure The Digitizer Equipment Will Remain Fixed To The Shelf And Not Move Around During A Seismic Event The Shelf Can Be Bent To Roughly 80Deg The Dimensions Are 18 Long Parallel To The Long Axis Of The Enclosure X 10 Wide Not Including The Lip That Is Fastened To The Back Side Of The Enclosure 10 The Shelf Will Be Mounted 15 5 From Interior Base Of Enclosure On The South Side And Centered 20 From The West Side See Pictures 11 Each Swingset Will Contain A Power Board That Utilizes A Mean Well Npf 60 24 Power Supply See Diagram Attached For Power Board Solar Power Panel V20 Pdf 12 The Power Board Will Be Mounted On Two Rails Starting 12 From The East Side Using 5 16Th Holes And 20 Ss Hardware The Board Will Be Angled Roughly 30 Degrees With The Folded Edge Of The Board Resting Against The Southern Back Of The Enclosure See Pictures 13 The Power Board Will Have Clear Vinyl Plastic Sheet Mounted Over The Power Board 14 There Will Be 9 Cable Clamps On The Front Of The Lip Similar Better To Https Www Mcmaster Com 3225T28 Placed Between The Power Board And The Ground Bus Evenly Spaced The Clamp Will Be Kept Open One Brass Nut Will Hold It In Place No Washer Or Lock Washer Required 15 The Two Lock Hasps Will Be Ss Rivets Will Be Ss Heavy Duty Hasps See Pictures Of Indoor Unit 16 One 4 5 Hole Will Be Punched Or Cut Into The Bottom Of The Swingset Northwest Corner Centered At 6 25 Inches From Each Side 17 Two Holes For The Flex Connectors Will Be Punched One On The East Wall And One On The West Wall The West Side Hole Will Be 25 From South Wall 15 From The Bottom The East 10 From The South Wall And 10 From The Bottom Hole Size 1 5 8 This Is For The 1 Metallic Flex Coupling Single Point Ground 1 One Single Point Ground Will Be Placed On The West Wall 15 Distance From The Inside Bottom Of The Enclosure And 8 Distance From The North Inside Of The Enclosure 2 The Single Point Ground Will Be Brass Or Ss Rod Extending 3 Inside The Box And 3 Outside If Brass Is Used For The Rod Then Ss Bolts Will Be Used With Ss Washer And Ss Lock Washers If Ss Rod Is Used Then Brass Nuts With Ss Washers And Ss Lock Washer Will Be Used Flex Conduit Runs 1 Two Five Foot 1 Metallic Flex Conduit Runs Will Attach To The Enclosure On The East And West Sides The East Side Will Carry Four Conductors From The Two Solar Panels Which Will Attach To The Power Panel Inside 2 The West Side 1 Metallic Flex Conduit Will Carry Two Lmr400 Cables At The Top Of The Mast We Need One Lmr400 With A Type Nm Connector The Second Lmr400 Requires A Type Tnc M Connector The Conduit Should Be Just Large Enough To Push The Tnc Connector Next The First Lmr400 Cable Through The Flex 3 Two Holes For The Flex Connectors Will Be Punched On The East And West Walls The West Side Hole Will Be 25 From South Wall 15 From The Bottom The East 10 From The South Wall And 10 From The Bottom Hole Size 1 5 8 This Is For The 1 Metallic Flex Coupling Communication Cables 1 Two Lmr400 Cables Example Https Www Tessco Com Product 20 Lmr400 Jumper Nm Nm 530758 Will Be Run From The Rf Surge Protectors On The Inside Through The Flex Conduit And Up The Northwest Mast 2 Both Cables Will Have A Single 360 Turn Inside The Enclosure With An Approximate Loop Diameter Of 24 3 The Lmr400 That Extends To The Top Of The Nw Stanchion Will Have Type N Crimp On Both Ends This Cable Will Terminate 5 Above The Nw Mast The N Connector Will Have Temporary Tape Applied To The Top And Be Taped To The Mast For Transport 4 The Shorter Lmr400 Will Have One Type N Crimp Connector Inside The Enclosure Terminating To The Rf Surge Protector And One Type Tnc Crimp Connector Terminated Mid Way Up The Nw Mast The Tnc Will Have Temporary Tape Protecting The Connector For Transport And Taped To The Masts Cable Mounting Hardware 1 Nw Stanchion Will Include 8 Cable Standoffs 2 The 7 Standoffs Will Be Mounted To The Pipe And Face In An Easterly Direction Spaced Evenly Along The Nw Stanchion Starting From The Bottom The First Cable Guide Will Be Mounted 28 From The Bottom Of The Nw Stanchion 3 1 Standoff Will Be 10 Above The End Of The Flex Conduit And Mounted Facing West This Will Contain Rubber Mount With Part Number Bcu158x 4 The Part Number For The 8 Pieces Are As Follows A 8 Pcs Https Www Sitepro1 Com Store Cart Php M Product Detail Amp P 2313 B 8 Pcs Https Www Sitepro1 Com Store Cart Php M Product Detail Amp P 43 C 8 Pcs Https Www Sitepro1 Com Store Cart Php M Product Detail Amp P 18 D 1 Pcs Https Www Sitepro1 Com Store Cart Php M Product Detail Amp P 3133 Surge Protection 1 Two Rf Surge Protectors Like This Https Www Tessco Com Product Gps Tower Top Protector 414436 Or Equal Or Better In Quality Will Be Mounted On The Copper Ground Bus Separated By 4 Minimum The Ss Screw For The Rf Surge Protector Will Have Anti Seize Applied To The Threads 2 The Ss Hex Bolt Used For Attaching The Rf Surge Protector Will Have Anti Seize Wiped Around The Threads Of The Bolt 360Deg 3 The Bulk Head Side Of The Rf Surge Protector Unit Will Face Upward 4 The Bottom Of The Rf Surge Protector Units Will Have Lmr195 Jumpers With Type N And Type Tnc Connectors Connected To Them And Run Down The Cable Clamps To The Power Board Each Jumper Will Be 5 Or 6 Feet Long 5 The Top Of The Rf Surge Protectors Will Connect To Lmr400 Type N Connectors Leading Out Of The Enclosure Through The Flex Conduit The Forward Rf Surge Protector Or North Rf Surge Protector Will Lead To The Tnc Connector Which Will Be Strapped To The Vertical Stanchion And Weather Proofed Electrical Tape Is Fine At 8 Feet Measured From The Bottom Of The Enclosure The Southern Rf Surge Protector Will Connect And Extend The Same Way To The Top Of The Northwest Stanchion Where It Will Be Strapped And Protected For Transit 6 Each Rf Surge Protector Will Have A 5 Type Lmr195 Jumper This Or Similar Better Https Www Tessco Com Product 5 Lmr195 Jumper N Male Tnc Male 514601 Connected To Them One End Will Be Type N Male And The Other End Will Be Type Tnc Male 7 One Surge Protector This Or Similar Better Https Www Amazon Com Delta La302dc 0 500V Lightning Arrestor Dp B004m4urxa Will Be Mounted 6 East Of The Power Panel On The Enclosure Tray It Will Be Roughly Centered On The Tray Grounding Cables 1 2Awg 7 Stranded Copper Cable With Green Insulation Will Extend From The Top Of The Northwest Stanchion Down The Pipe To The Single Point Ground Connection On The West Side Of The Enclosure The Top Of The 2 Stranded Copper Cable Will Attach To One Ground 2 Bronze Ground Clamp There Will Be 4 Inches Of Exposed Copper Cable Left Above The Pipe Clamp At The Top 2 All Internal Ground Cables Will Be Green 6Awg Thhn Stranded Terminated With Blue Type Compression Lugs With Hole Size For Copper 3 The Power Board Will Have One Green 6 Ground Cable Run From The Ground Bus On The Power Board To The Ground Bus On The Inside West Wall 4 The Ground Bus Will Have One 6 Ground Cable Run To The Single Point Ground Ground Bus On West Wall 1 The Ground Bus Edges Will Be Positioned 12 1 From The North Inside Edge Of The Enclosure And 12 1 Distance From The Bottom Inside Of The Enclosure 2 The Ground Bus Will Be Level Within The Enclosure With A Tolerance Of 1 32 3 The Ground Bus Will Be Connected To The Single Point Ground On The North Side Of The Ground Bus Via One 6 Stranded Copper Green Sheathed Insulated Grounding Wire With 6 Blue Crimped Lugs The South Side Of The Bus Will Connect To The Power Panel Via One 6 Copper Stranded Green Insulted To The Power Panel Ground Bus Located On The West Side Of The Power Panel One Lug Only Which Attaches To The South Side Of The Bus Finish Work 1 One Sticker Will Be Placed On The Middle Backside Of The Lower Solar Panel A Second Sticker Will Be Placed On The Front Side Of The Enclosure 2 Two 389 Locks Will Be Placed On The Hasps Before Departure 3 One 5 2 Bare Stranded Copper Conductor Will Be Left In The Enclosure With A Brown Single Post Crimp On One End Only Used For Single Point Ground To Ground Rod Connection 4 Hose Clamps Holding The Ground Onto The Stanchion Will Be Aligned Storage Of Enclosures After Fabrication Each Completed Unit Must Be Stored Until Usgs Staff Or Usgs Retained Contractors Picks It Up For Transport To The Seismic Station Site The Transporter Will Arrange In Advance With The Fabricator And Or Storage Facility For A Suitable Time For Pick Ups Storage Of Swingsets Is Most Critical The Duration Of Storage Will Not Exceed 12 Months Each Unit Should Be Uniquely Identified With A Serial Number And A Manifest Of Components That Includes Serial Numbers Of Uniquely Identified Components I E Telemetry Modems And Radios Antennas Solar Panels Power Boards Stored With The Box Unit Units May Be Stored Either On Site Where They Are Fabricated Or At An Off Site Facility In Either Case The Storage Facility Ies Should Be Located In Either Or Both The States Of Washington And Or Oregon It Is Considered Favorable To Have Several Different Storage Locations Since This May Reduce Transport Time From Storage To Installation Site But A Single Storage Facility Is Also Acceptable Storage Facilities Must Be Lockable Because The Swing Sets Will Be Located Outside They May Be Stored Either Outdoors Or Indoors It Is Preferable For Indoor Boxes To Be Stored Indoors Or At The Least In A Covered Shed Or Warehouse However In Either Case Units Stored Outdoors Must Be Covered With A Tarp Or Similar Covering To Protect Them From The Environment There Must Be Sufficient Space For The Swing Sets To Be Conveniently Loaded Onto A Standard Tail Lift Truck The Swingsets Are Tall And It Would Be An Advantage To Have A Ceiling Height That Allowed The Swingsets To Be Cherry Picked And Loaded Onto A Trailer Or Truck Requests For Pick Up Of Stored Units Will Be Made To The Storage Facilities At Least 48 Hours In Advance And Scheduled During The Regular Working Hours Of The Facility The Fabrication Shall Be Completed And The Products Placed In Storage Within Ninety 90 Calendar Days Of Issuance Of A Purchase Order Storage Of Products Shall Be For A Period Of Up To One Year After Fabrication At Vendor S Expense In An Insured Warehouse Or Yard The Listed Federal Acquisition Regulation Far Clauses Apply To This Solicitation And Are Incorporated By Reference All Far Clauses May Be Viewed In Full Text Via The Internet At Http Acquisition Gov Federal Acquisition Regulation Table Of Contents This Solicitation Incorporates By Reference Far 52 204 07 Oct 2018 52 204 13 Oct 2018 52 204 25 August 2020 52 212 1 June 2020 52 212 3 June 2020 52 212 4 October 2018 52 212 5 August 2020 And 52 232 40 December 2013 52 212 2 Evaluation Commercial Items Oct 2014 A The Government Will Award A Contract Resulting From This Solicitation To The Responsible Offeror Whose Offer Conforming To The Solicitation Will Be Most Advantageous To The Government Price And Other Factors Considered The Following Factors Shall Be Used To Evaluate Offers Trade Off Factors Price And Experience 1 Firm Fixed Price 2 Recent And Relevant Experience In Supplying This Type Of Enclosure In A Similar Environment And For Related Or Similar Purpose Pursuant To Far Clause 52 212 5 The Following Clauses Are Hereby Incorporated By Reference 52 204 10 Reporting Executive Compensation And First Tier Subcontract Awards Oct 2016 Pub L 109 282 31 U S C 6101 Note 52 209 6 Protecting The Government S Interest When Subcontracting With Contractors Debarred Suspended Or Proposed For Debarment Oct 2015 31 U S C 6101 Note 52 219 6 Notice Of Small Business Set Aside March 2020 52 219 28 Post Award Small Business Program Representation July 2013 15 U S C 632 A 2 52 222 03 Convict Labor June 2003 E O 11755 52 222 19 Child Labor Cooperation With Authorities And Remedies Jan 2020 52 222 21 Prohibition Against Segregated Facilities Apr 2015 52 222 26 Equal Opportunity Sep 2016 E O 11246 52 222 36 Affirmative Action For Workers With Disabilities Jul 2014 29 U S C 793 52 222 50 Combating Trafficking In Persons March 2015 52 225 3 Buy American Free Trade Agreements Israeli Trade Act May 2014 52 223 18 Encouraging Contractor Policies To Ban Text Messaging While Driving Aug 2011 E O 13513 52 232 33 Payment By Electronic Funds Transfer Jul 2013 52 000S 5079 Technical Liaison Technical Direction Oct 1997 A The Performance Required Herein Shall Be Subject To The Technical Direction Of The Technical Liaison Tl As Identified Below As Used Herein Technical Direction Is Defined As Direction To The Contractor That Fills In Details Suggests Possible Lines Of Approach Or Otherwise Supplements The Scope Of The Work Set Forth Herein And Shall Not Constitute A New Assignment And Does Not Supersede Or Modify Any Article Or Clause Of This Contract B The Technical Liaison Is Not Authorized To Perform Formally Or Informally Any Of The Following Actions 1 Promise Award Agree To Award Or Execute Any Contract Contract Modification Or Notice Of Intent That Changes Or May Change This Contract 2 Waive Or Agree To Modification Of The Delivery Schedule 3 Make Any Final Decision On Any Contract Matter Subject To The Disputes Clause 4 Terminate For Any Reason The Contractor s Right To Proceed 5 Obligate In Any Way The Payment Of Money By The Government Only A Warranted Contracting Officer Is Authorized To Obligate Funds On This Or Any Other Contract Action C The Contractor Shall Immediately Notify The Contracting Officer In Writing If The Technical Liaison Has Taken An Action Or Fails To Take Action Or Issues Direction Written Or Oral That The Contractor Considers To Exceed The Above Limitations D The Technical Liaison Assigned For This Contract Is Name Tbd At Award Telephone Number Email E Only The Contracting Officer May Designate A Different Technical Liaison Electronic Invoicing And Payment Requirements Invoice Processing Platform Ipp April 2013 Payment Requests Must Be Submitted Electronically Through The U S Department Of The Treasury s Invoice Processing Platform System Ipp Payment Request Means Any Request For Contract Financing Payment Or Invoice Payment By The Contractor To Constitute A Proper Invoice The Payment Request Must Comply With The Requirements Identified In The Applicable Prompt Payment Clause Included In The Contract Or The Clause 52 212 4 Contract Terms And Conditions Commercial Items Included In Commercial Item Contracts The Ipp Website Address Is Https Www Ipp Gov Under This Contract The Following Documents Are Required To Be Submitted As An Attachment To The Ipp Invoice Invoice Only The Contractor Must Use The Ipp Website To Register Access And Use Ipp For Submitting Requests For Payment The Contractor Government Business Point Of Contact As Listed In Sam Will Receive Enrollment Instructions Via Email From The Federal Reserve Bank Of Boston Frbb Within 3 5 Business Days Of The Contract Award Date Contractor Assistance With Enrollment Can Be Obtained By Contacting The Ipp Production Helpdesk Via Email Ippgroup Bos Frb Org Or Phone 866 973 3131 If The Contractor Is Unable To Comply With The Requirement To Use Ipp For Submitting Invoices For Payment The Contractor Must Submit A Waiver Request In Writing To The Contracting Officer With Its Proposal Or Quotation Unilateral Deobligation The Contractor Shall Submit All Invoices Under This Award No Later Than Ninety 90 Calendar Days After The Period Of Performance Has Expired Unless A Request For Extension Has Been Submitted To And Granted By The Contracting Officer After 120 Calendar Days Have Passed After The Expiration Of The Period Of Performance The Contracting Officer Reserves The Right To Issue A Unilateral Modification Deobligating Any Unexpended Funds And To Initiate Closeout Procedures All Questions Regarding This Procurement Shall Be Electronically In Writing To Charlan Fejarang At Cjfejarang Usgs Gov No Later Than Thursday September 10 2020 At 12 00Pm Pt Responses Are Due To The Contracting Officer s Email Address At Cjfejarang Usgs Gov By Tuesday September 15 2020 At 12 00Pm Pt
Contact Information
Other Detail
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 32881159
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.