Project Work Will Consist Of Providing All Labor Qualified Supervision Material Tools Equipment Supplies And Incidentals To Disconnect The Visitor Center Hvac System From The Existing Geothermal Piping Loop And Replace The Geothermal Loop With A New Fluid Cooler And Natural Gas Boiler Located Near The Existing Maintenance Building Existing Piping Within The Visitor Center Will Be Replaced As Indicated On The Drawings Existing Heat Pumps Will Be Replaced And An Attic Ductless Split System Will Be Replaced With Heat Pump Units Energy Recovery Ventilators Will Be Added
Contact Information
Other Detail
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 31441961
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.