Engineering And Construction Services Replacement Of Automatic Transfer Switch And Power Cables Survey Desig ...
Tender Notice
TenderID
30474684
Tender Brief
Engineering And Construction Services Replacement Of Automatic Transfer Switch And Power Cables Survey Design And Installation At The Us Embassy Lisbon Portugal
Pre Solicitation Notice Solicitation No 19Ge50 20 R 0036 The American Consulate General Frankfurt Germany Provides The Following Pre Solicitation Notice Regarding The Issuance Of A Request For Proposal Rfp For Engineering And Construction Services Replacement Of Automatic Transfer Switch And Power Cables Survey Design And Installation At The Us Embassy Lisbon Portugal The Regional Procurement Support Office In Frankfurt Germany Intends To Issue A Firm Fixed Price Construction Type Contract During The Third Quarter Of Calendar Year 2020 The Successful Contractor Shall Provide Complete Design Build Construction Services Contract Coordination And Supervision Including But Not Limited To The Management And Construction Necessary To Meet The Requirements Of This Contract Within The Established Timeframe The Work Includes Among Other Construction Activities Engineering And Construction Services To Replace An Existing 600A 400 230V 3 50Hz Paralleled Electrical Feed Installed In Cable Tray With A New 800A Feed Remove And Replace An Existing 800A Automatic Transfer Switch Ats Remove An Existing 600A Ats Reroute Several Electrical Circuits As Identified In This Statement Of Work Sow Remove And Replace An Existing Medium Voltage Mv Demarcation Switch This Automatic Transfer Switch Equipment Repair By Replacement Scope Will Be Split Into Two 2 Basic Phases With The First Being Engineering And Construction Documentation Services And The Second Being Construction Services The First Phase Will Include Developing Construction Documents Capturing The Installation Intent And Construction Phases Which Shall Include Site Plans Demo New Work Plans Equipment Cut Sheets And Relevant Engineering Calculations Following Approval Of Construction Documents The Second Phase Construction Services Work Will Include Removal Of Existing 600A Electrical Feed Removal Of Existing 600A And 800A Ats And Installing New 800A Electrical Feed And 800A Automatic Transfer Switch Temporarily Shutting Down Systems To Switch Over Service To New Atss The Contractor Shall Provide A Temporary Generator Ats And All Temporary Cabling Necessary To Power Main Distribution Panel The Magnitude Of This Project Is Anticipated To Be Between 250 000 00 And 500 000 00 U S Dollars For The Entire Project Companies Interested In The Solicitation Should Express Their Interest By Written Correspondence No Later Than Friday June 19 2020 At Both Of The Following Email Addresses Christeh State Gov And Frankfurtrpso State Gov And Must Include The Following Information Name Of Firm Name Telephone Email Address Of Point Of Contact And Complete Physical And Mailing Address Of Firm Do Not Telephone Firms Shall Be Knowledgeable In Written And Spoken English Application For Solicitation Documentation Check List In Applying For The Solicitation Material You Are Acknowledging That Your Company Is Able To Reach Compliance With The Following Highlighted Requirements Included In The Solicitation In Accordance With Dosar 652 242 73 Authorization And Performance Aug 1999 It Will Be Necessary For Your Organization To Possess Authorization To Operate And Do Business In The Country In Which This Contract Will Be Performed Furthermore Authorization Shall Include The Requirement To Be Registered To Do Business In Portugal Contractors Shall Be Required To Provide A A Thorough Description As To What Steps You Have Taken To Investigate All Requirements To Obtain Authorization To Perform In The Country Of Performance B Details Of Your Findings And A Description Of What Your Organization Will Actually Be Required To Undertake To Obtain Licensing And Requisite Permit S C Any Impact Such Authorization May Have On The Contractor S Operating Name And Address D Specific Information Concerning The Period Of Time You Anticipate It Will Take To Obtain Appropriate Authorization Any Plan Reflecting A Protracted Period I E More Than 15 Calendar Days After Award In Obtaining License S And Or Permit S Shall Be Rejected At The Discretion Of The Contracting Officer Since Further Delay Would Otherwise Harm The Government You Will Be Required To Provide Information That Clearly Shows You Are Able To Perform Work In Portugal Any Entry Or Work Visa Issues Requirements Must Be Clearly Discussed With A Plan To Mitigate Any Risk Clearly Identified Irrevocable Letters Of Credit Iloc The Successful Contractor Will Be Required To Provide The Government With Surety In The Form Of Irrevocable Letters Of Credits Totaling 40 Of The Value Of The Contract If You Have A Duns Number And Have Been Sam Registered Please Include Below Please Note That The Requirement To Obtain A Duns Number And For Your Company To Be Sam Registered Will Be A Mandatory Requirement Upon Contract Award Duns Number Sam Registered Yes No Dunn And Bradstreet Www Dnb Com Get A Duns Number Html System For Award Management Sam Gov The Failure To Provide The Above Documentation When Submitting Your Proposal May Result In Your Proposal Being Found Technically Unacceptable And Removed From The Competition Without Further Discussions Solicitation And Award Will Be Subject To The Laws And Regulations Of The United States Of America This Requirement Is Being Competed Utilizing Full And Open Competition Procedures The Contract Specialist For The Administration Of This Contract Is Mr Hartmut Christe Tel 49 69 7535 3343 Email Christeh State Gov
Contact Information
Other Detail
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 30474684
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.