Bus Garage Construction WorkNew construction of the bus depot in Zeitz lot 23 exhaust gas extraction traces of repairDescription New multi purpose hall including administration building as well as external structures and ancillary facilitiesBus depot ZeitzLot 23 exhaust extraction repair tracesAlong the two repair tracks 1 and 2 axes 06 08 A F built in lockable and mobile covered exhaust gas extraction points are installed at floor level 5 suction points are installed per axis Connection points The cables laid in the floor are made of PVC U and are not part of this position provided by the customer The two single lines DN 150 are connected to a common line in the area of the axes 06 08 A B with DN 250 and laid over the condensate sump to the radial fan with sound insulation housing mounted on a wall on a bracket The pressure side fan line is routed through a roof duct Time limit for receipt of tenders or requests to participate Date 07 07 2020 Local time 09 45 Disclaimer The above text is machine translated For accurate information kindly refer the original document
Contact Information
Other Detail
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 30254927
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.