Construction Work for Gas PipelinesEngineering Procurement Installation and Pre commissioning Activities for Offshore Sections of EastMed Pipeline ProjectDescription The main scope of the offshore pipeline EPCI contractor is relative to engineering procurement installation and pre commissioning of the offshore pipeline including management administration and coordination detail design installation engineering and development of installation procedures and plans procurement of the line pipe with anti corrosion internal flow coating and concrete weight coating and auxiliaries anodes for concrete weight coated sections induction bends buckle arrestors procurement of all other materials required for the completion of the works including anodes for non concrete weight coated offshore line pipe sections isolations joints onshore cathodic protection materials fiber optic cable for short onshore pipeline section set up and operation of marshalling yards storage logistics and transportation of materials to the various worksites and to the pipelay vessels engaged by the contractor offshore pipeline installation including pre lay and post lay surveys anodes installation cable crossings works seabed intervention works and all other ancillary activities shore crossing construction and onshore pipeline installation works pipeline system pre commissioning to prove pipeline integrity and to make the system ready for the introduction of gas full support during commissioning and start up activities To a maximum of 2 candidates qualified to be invited to participate in the competitive dialogue it will be asked during all the entire Tender procedure Competitive Dialogue to perform EPCI Simultaneous Engineering Activities that is early preparatory engineering activities review and endorsement of selected offshore pipeline FEED documents production of additional documents aiming up on conclusion of the competitive dialogue at the preparation of final binding EPCI offers The scope and arrangements of EPCI Simultaneous Engineering Activities will be provided to the qualified candidates in a subsequent invitation to participate in competitive dialogue The project scope includes the following principal pipeline sections the offshore sections OSS s as follows OSS 1 from gas sources offshore of Israel to Cyprus approx 300 km with 2300 m max water depth OSS2 2 from Cyprus to East Crete approx 732 km with 3000 m max water depth OSS 3 from Crete to South Peloponnese approx 421 km with 1370 m max water depth OSS 4 crossing Gulf of Patras approx 18 km with 110 m max water depth Nominal OD varies between 24 30 for section 1 2 and 3 and between 46 48 for 4 with wall thickness up to 39 mm short onshore pipeline sections connecting stations by others to respective landfalls at Cyprus and Crete Time limit for receipt of tenders or requests to participate Date 15 06 2020 Local time 17 00
Contact Information
Other Detail
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 29680795
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.