Tenders Are Invited For To Supply And Install New High Speed Turbo Compressor To Replace Existing Roots Blowers To Suit Minimum Operation Requirement Health And Safety General Health Safety Measures At Site A Allow For Compliance To Osha 94 Fma 67And Statutory Requirements As To Ensure The Safety Health And Welfare Of Persons At Work And Public Protection ArisingFrom Contractual Works B Allow For Compliance With The Indah Water Konsortium Operational Instruction Opi Requirements C Allow For Adequate Personal Protective Equipment Ppe Such As Safety Helmets Safety Boots EyeProtectors Ear Protectors Gloves Fluorescent Jackets Etc To All Contractors Site Personnel Employers RepresentativesAnd Authorized Visitors D Allow For The Provision To Conduct Safety Inspections Tool Box Talks Before Daily Works E Prepare And Submit Colour Photos Before During And After Works F All Quantities Are Provisional And Subject To FinalMeasurement G To Provide Roro Construction Bin For The Whole Construction Period And To Be Located At DesignatedApproved Area Contractor To Ensure That All Rates Price Submitted Is In Compliance To Akta Perundingan Gaji Negara 2011 Akta 732 Perintah Gaji Minimum 2012 Minimum Wages Order 2012 P U A 214 Which Was Gazetted On 16Th July2012 Nota Kontraktor Hendaklah Memastikan Sebutharga Yang Di Hantar Adalah Selaras Dengan Akta Perundingan GajiNegara 2011 Akta 732 Perintah Gaji Minimum 2012 Minimum Wages Order 2012 P U A 214 Yang Telah DiWartakan Pada 16Hb Julai 2012Lot 1 0002 0 Preliminary Engineering Works To Conduct Professional Study Site Survey Technical Installation ProposalIncluding But Not Limited To Findings Photographs Details Calculation Graph Drawing Source Of Reference ProductCertification And Etc On The Details Installation That Will Be Conducted Prior To Start Of Work Actual Type Of High SpeedTurbo Compressor To Be Used Should Be Clearly Define Including Its Details Operation Maintenance Guidelines Spare Parts After Sales Service And Etc All The Reports Should Be Submitted To Iwk And Approved Before ActualImplementation Installation At Site Specification Of Existing Roots Blower As Per Details Below Tenderer Should Also MakeNesessary Confirmation Of The Specification With Original Manufacturer For Design Purposes This Study Need To Include TheCapability Of New Hst Units To Couple With Existing High Speed Turbo Blower Magnetic Type Units And Root Blowers A Blower Type Rotary Lobe Positive Displacement BlowerB Manufacture Fu TsuC Model No Rsr 200KD Bore Diameter 200Mm DiameterE Air Flow 44 42 M3 Min UnitF Motor Output 55Kw 6Pole 3 Phase 415 Volt 50 HzG Pressure 50 KpaH Operation Routine 2 Duty And 1 StanbyLot 1 0003 0 Site Preparation By Dismantling Existing Roots Blower To Supply Labour High Skilled Manpower Tools And Equipment Machineries To Remove Dismantle Existing Full Set Roots Blower Motor Blower Concrete Plinth AndAll Other Miscellaneous Hardware Acsessories As Instructed By Iwk Representative All Disposal Items Should Be Sent ToIwk Scrap Yard Area And The Blower Unit Stored At Uo Subang Jaya Workshop Ptg153 Putra Height All Parts Should BeDismantled On Site To Ensure Proper And Safety Of The Mobilisation Relocation Works Using Suitable Construction Crane IfApplicable Lot 1 0004 0 To Supply And Install New High Speed Turbo Compressor To Replace Existing Roots Blowers To Suit Minimum OperationRequirement As Detailed Below A Minimum Air Flow 44 0 M3 MinB Maximum Air Flow 88M3 MinC Maximum Shaft Output Power 110 Kw 150 HpD Electrical Starter 3 Phase 415 Volt 50 Hz Using Latest Advance Energy Saving Electrical Motor Starter With VariableSpeed ControlE Minimum Discharge Pressure 50 KpaF Maintenance Fully Borne By Proponent Troughout Warranty PeriodG Type Of Installation Enclosed Type IndoorH Cooling System Forced Air CoolingI Max Noise Level Db A 85 DbJ Warranty Period 2 Years Upon Succesful T CK Turbo Compressor Type Magnetic Bearing Or Air Bearing Type OnlySet 1 0005 0 All Nesessary On Site Modification Works That Need To Be Carried Out To Ensure Successful And Safely Operation Of The NewlyInstalled Turbo Compressor The Works Should Include But Not Limited To Modification On Building Structure Piping Works Control Panel Cabling Power Supply Or All Related Electrical Works Modification To The Existing Control Panel Plc Scada And Cabling Works Lot 1 0006 0 Testing Commissioning To Supply Specialist Technical Manpower To Performed T C For The Newly InstalledTurbo Compressor The Works Should Be Carried Out According To Supplier Reccomendation And Following RelatedInternational Standard If Applicable
Contact Information
Other Detail
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 22754843
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.