Contract Notice Electrical Fitting WorkElectrical Installation WorkDescription As Part Of The General Renovation Of The Vocational School Luisenstra e And The Entire Electrical Installation Is Renewed Most Of The Dismantlings Are Carried Out By The Master Builders The Plant Will Be Supplied With A New Main Feed In By The Swm The Counters And The Associated Main Distribution And Their Subdistributors Are Renewed And Installed In Their Own Distribution Rooms The Distribution Of The Subdistributor Is Made By A Busbar System Which Is Mounted Vertically On The Riser Points The Supply In The Individual Floors Takes Place Via Cable Carrier Systems In The False Ceiling Area Or Below The Heating Cooling Ceilings The System Must Be Installed Ready For Operation And Handed Over To The Client Scope Of The Construction Project Old Building Renovation About 93 500 Cubic Metersnew Installation About 6 500 Cubic Metersmaterial Requirement Approx Cable Carrier Systems Approx 3 400 M Climbing Routes Approx 210 M Busbar System Approx 170 M Media Column Model Munich Approx 175 Pcs Installation Equipment Approx 5 500 Pieces Edp Junction Boxes 2 Fold Approx 1 800 Pieces Data Cable Duplex Cat 7 Approx 52 000 M Power Supply Cube Approx 120 Pcs Main Distribution 9 Cabinets 1 Pc Sub Distributor Floor Cabinets H X W 220 X 200 Cm 28 Pcs Installation Cable 3 X 1 5 5 X 2 5 Approx 75 000 M Time Limit For Receipt Of Tenders Or Requests To Participate Date 26 09 2019 Local Time 10 40 Disclaimer The Above Text Is Machine Translated For Accurate Information Kindly Refer The Original Document
Contact Information
Other Detail
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 22179944
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.