Contract Notice Ventilation Installation WorkMsr Technology Air Conditioning Systems And Building AutomationDescription Ventilation Installation Of 2 Ventilation Systems On The Roof Appendix 1 Supply And Exhaust Air For The Natural Science Rooms Power Supply Air 2 500 M3 H Power Exhaust Air 1 300 M3 H Supply And Exhaust Unit With Intake Chamber Shutter Filter Heater Variable Speed Ec Fans And Blow Out Chamber And Heat Recovery Installation Of About 50 M2Channel And Approx 200 M Spiral Duct Dn125 280 Installation Of 5 Pipe Silencers And Variable Volumetric Flow Controllers Installation Of 2 Channel Fire Dampers Installation Of 10 Ceiling Diffusers Appendix 2 Exhaust Air For The General Classrooms In The Bar Power Exhaust Air 9 320 M3 H Exhaust Air Unit With Shutter Filter Speed Controlled Ec Fan And Blow Out Chamber Installation Of About 90 M2Sewer And Approx 220 M Spiral Duct Dn80 315 Installation Of 21 Pipe Silencers And Variable Volumetric Flow Controllers Installation Of 6 Channel Fire Dampers Installation Of 42 Ceiling Diffusers Annex 3 Exhaust Air Cleaning Agent Room Installation Of 1 Small Room Fan 30 M3 H Installation Of 1 Afterflow Fire Damper Installation Of 3 Exhaust Systems On The Roof Annex 1 1 Process Exhaust Air For 3 Digestories 1 650 M3 H Annex 1 2 Process Exhaust Air For 13 Hazardous Substance Cabinets 620 M3 H Annex 1 3 Process Exhaust Air For 2 Draw Cabinets 100 M3 H System Construction On The Roof 2 Silencers Centrifugal Fan Deflector Hood Installation Of Approx 15 M2Channel And Approx 70 M Pipe Dn75 315 Installation Of 40 M2L90 Fire Protection Air Conditioners Installation Of 3 Outdoor Air Conditioners With 8 Indoor Units Installation Of The Outdoor Units On The Roof Indoor Units As A Version Rasterger te Installation Of Approx 240 M Refrigeration Pipe Pre Insulated As Rolled Goods 6 16 Mm Building Automation Electrical Connection And Control On The Roof Of 1 Supply And Exhaust Air System 1 Exhaust Air System 3 Process Exhaust Systems Installation Of Cable Tray About 45 M 600 X 200 Mm On The Roof Cable Laying From The Control Cabinet To The Room Mostly Via Cable Tray From Elt Cable Laying U A Approx 920 M Data Cable Cat 7 Approx 1300 M Installation Cable A2yl2y 2X2x0 8 Approx 560 M Installation Cable A2yl2y 4X2x0 8 Approx 920 M Installation Cable A2yl2y 6X2x0 8 Approx 740 M Power Cable Nyy J 3X1 5 Approx 1 540 M Power Cable Nyy J 5X1 5 Approx 490 M Power Cable Nyy J 5X2 5 Approx 260 M Power Cable Nyy J 5X4 Approx 110 M Power Cable Nyy J 5X6 Approx 540 M Power Cable Nyy J 7X1 5 Individual Room Control Installation In The Room 24 Rooms Of Room Temperature And Co2 Sensors Electrothermal Actuators For Zone Valves Heating 24V Venetian Blind Push Button Window Push Button Compact Automation Station Connection Of Variable Volumetric Flow Controllers Connection Sun Protection Motors 230V Connection Of Window Motors 24V Connection Of Air Conditioning Units Only In 3 Rooms 2 X 3 Indoor Units And 1X2 Indoor Units Regulation In The Room The Ventilation The Motor Skylights Of Sunscreen Air Conditioners The Radiator Installation Of A Control Cabinet 1 800 X 1 000 X 400 Mm In The 2Nd Floor Installation Of The Required Components For The Control And Regulation Of The Systems U A Motor Controls For The Ventilation Systems Automation Station Gsm Modem Installation Of A Weather Station Time Limit For Receipt Of Tenders Or Requests To Participate Date 30 07 2019 Local Time 10 00 Disclaimer The Above Text Is Machine Translated For Accurate Information Kindly Refer The Original Document
Contact Information
Other Detail
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 21070663
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.