Contract Notice Construction Work For Power PlantEsb Energy Projects Electrical Balance Of Plant Ebop Irish FrameworkDescription Esb Is Seeking Expressions Of Interest For Works Supplies And Services Through A Framework Agreement Related To Electrical Balance Of Plant Ebop For Energy Projects Including But Not Limited To Solar Farms Battery Storage Wind Farms Energy From Waste Gas Turbine Or Other Energy Projects Acquired Or Built During The Term Of The Framework Including Joint Venture Or Subsidiary Developments Esb Plans To Develop The Projects Commencing In 2019 Through A Pipeline Of Greenfield Projects Which Are Currently Going Through The Consenting Process The Size Of Individual Projects Is Expected To Typically Range Between 5Mw And 100Mw Although Some Projects Could Be Outside This Range The Location Of These Proposed Projects Is Expected To Be On The Island Of Ireland Typically The Scope Of Work For This Framework Shall Include The Design Procurement And Installation For The Following Non Exhaustive List However Tenders Should Note That The Detailed Scope And Contracting Strategy For Each Project Will Be Determined At The Mini Tender Stage 1 Ebop Civil Works 2 Earthing System For Complete Station And Oem Plant Areas 3 Auxiliary Power Supplies 4 Mechanical And Electrical Services 5 Grid Connection Works Underground Cable Or Overhead Line As Required 6 Hv End Masts Or Cable Connection Terminations 7 Grid Transformer 8 Neutral Earthing Resistor 9 Mv Cable Network 10 Mv Switchgear 11 Connection Of Main Lv And Standby Supply 12 Fibre Optic Cable Network 13 Control And Protection As Per Employers Specifications 14 Connection To Revenue Metering 15 Installation And Wiring Of Oem Cabinets 16 Installation And Wiring Of Employers Scada Cabinets 17 Studies If Specified 18 Design Process And Procedures 19 Testing And Commissioning 20 Implementation Of Employers Electrical Transfer Procedures Including Sap 21 Operations And Maintenance Requirements 22 Permanent Telecommunications For Site 23 Fulfilling Role Of Pscs Or Principal Contractor During All Or Part Of The Works Which May Include Other Parties On Site 24 Met Mast Procurement And Erection If Required Including Foundation And Crane Hardstanding Some Post Construction Works Services During The Project Operational Phase May Also Be Included In The Framework Scope Time Limit For Receipt Of Tenders Or Requests To Participate Date 05 07 2019 Local Time 15 00
Contact Information
Other Detail
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 20558861
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.