Contract Notice Plumbing And Drain Laying WorkSanitary Installations Renovation Vblcampus House IiDescription The Administrative Buildings Of The Vbl In Karlsruhe Are Undergoing Extensive Renovation And Refurbishment Measures The Entire Building Complex Vblcampus Is Being Modernized With A Total Of Six Houses And A Gross Floor Area Of Around 26 000 Square Meters By 2023 The House Wise Refurbishment And Renovation Of A Parking Deck Are Planned In This Section From Mid 2019 The Office Building Haus Ii Will Be Completely Modernized The House 2 L X W X H About 66 X 13 X 16 M Has A Total Of Five Floors Plus Attic The Basement Serves For Technical Areas An Underground Car Park Access And Other Ancillary Rooms Ground Floor 3Rd Floor Serve As Office And Social Rooms Plant Description Excerpt Heating Supplies The Heat Supply Is Realized Via The District Heating Network Of Stadtwerke Karlsruhe There Is Provided An Indirect Feed Via A Plate Heat Exchanger The New District Heating Transfer Station Will Be Set Up In House 2 In The Basement Heating Loadi Heating Load Radiator149 Kwii Heating Load Of Heating And Cooling Ceilings64 Kwiii Heating Load Of Ventilation Systems64 Kwtotal Heating Loads I Iii 277 Kwheating Plantthe District Heating Transfer Station Is Located In The Former Heating Center In The Basement Of The Building Pressure Maintenance Replenishmenttechnically Required Pressure Maintenance And Refilling Facilities Are Arranged In The Technical Center In The Basement The Pressure Maintenance Is Carried Out As A Pump Controlled Pressure Maintenance Station Heat Distribution Networksdistribution Pipesthe Main Distributor Is Located In The Current Boiler Room In The Basement From Here The Distribution Takes Place Via The Following Main Groups Heating And Cooling Ceilings Radiator South Radiator North Rlt Device Reserve There Are Provided Highly Efficient Heating Pumps Pipelines Are Welded To The Distributor As A Black Steel Pipe Thermal Insulation Mineral Wool Insulating Sleeves Alukaschiert Distribution Pipes From The Ug Technical Center Risers Distribution Pipes In The False Ceiling Distribution Pipesbelow The Windows Other Radiator Connectionsmineral Wool Insulating Sleeves Aluminum Coated With Galvanized Sheet Metal Coating Manifolds Rlt Device Connections Lines Below 2 00 M From Rfbmineral Wool Mats Alukaschiert Heat Exchanger Distributorroom Heating Radiators Office Space In All Offices Heating Is Provided Via Heating And Cooling Ceilings As Well As Radiators In The Offices One Radiator Is Placed Per Grid Below The Windows In A Niche On An On Sitesteel Construction Installed Rooms Such As Tea Kitchens And Copy Rooms As Well As Conference Rooms On The 1St And 2Nd Floor Are Equipped With Compact Radiators Toilet Rooms Are Equipped With Compact Radiators Below The Windows For The Room Corridor Transition In The Basement As Well As Foyer Atrium In The Ec Limb Radiators Are Provided Hallway Atrium On The 1St And 2Nd Floor Panel Radiator Refrigeration Systems The Refrigeration Unit With The Associated Chiller Is Located In The Warehouse In The Basement I Cooling Load Of Heating And Cooling Ceilings142 Kwii Cooling Capacity Of The Rlt Device53 Kwcooling Tower The Cooling Water Is Recooled For The Chiller Via An Air Cooled Table Condenser On The Green Area Next To The Underground Car Park Entrance Pressure Maintenance Make Up Technically Required Pressure Maintenance And Make Up Devices Are Arranged In The Warehouse 2 U01 20 In The Basement The Pressure Maintenance Is Carried Out As A Membrane Expansion Vessel K lteverteilsystemefor The Entire Building 2 Cold Water Systems In The Two Pipe System Are Planned Network 1 Rlt Systemsnet 2 Cooling Ceilingsvertical Cold Water Distribution Takes Place Via The Technology Shaft North West Horizontal Access Is Planned Above The Suspended Ceilings The Connection Of The Air Handling Unit In The Basement Takes Place By Means Of Pipes Laid Under The Ceiling Cooling Office Space For All Office Areas From The Ground Floor To The Third Floor Suspended Cooling Ceilings Are Planned All Cold Water Pipes For The Cold Water Network Are Made Of Stainless Steel Pipes Time Limit For Receipt Of Tenders Or Requests To Participate Date 04 06 2019 Local Time 09 00 Disclaimer The Above Text Is Machine Translated For Accurate Information Kindly Refer The Original Document
Contact Information
Other Detail
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 20103357
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.