Contract Notice Analysis ApparatusDelivery And Installation Of 4 Pilot PlantsDescription A Total Of Four Pilot Plants Are Required For Continuous Experiments In The Field Of Dehydrogenation Of Liquid Organic Hydrogen Carriers Lohc For The Production Of Hydrogen In The Performance Class Up To 5 Kw The Test Facilities Will Be Operated In The New Building Of The Helmholtz Institute Erlangen Nuremberg To Reduce The Spare Parts To Be Provided At The Helmholtz Institute Erlangen Nuremberg As Many Components As Possible Should Be Similar And Interchangeable All Systems Have In Common That They Consist Of At Least The Following Components Liquid Tank For The Loaded Hydrogen Carrier Liquid Delivery For The Hydrogen Carrier Preheating Of The Loaded Hydrogen Carrier Chemical Reactor Filled With Catalyst Heating For The Chemical Reactor Liquid And Gas Separation To Separate The Produced Hydrogen Gas From The Discharged Hydrogen Carrier Vacuum Pump For The Hydrogen Gas Controllable By 0 1 1 0 Bar A Liquid Tank For The Discharged Hydrogen Carrier Control For The System Perhydro Dibenzyltoluene Should Be Used As Liquid Organic Hydrogen Carrier In All Systems Perhydrodibenzyltoluene Was Developed In Erlangen By The University Of Erlangen Nuremberg And Is Currently Marketed By The Company Hydrogenious Technologies Gmbh The Application Must Include Both The Engineering Of The Individual Components The Overall System P Id Flow Chart And The Structure Of The Systems And Their Control The Hi Ern Must Be Supplied With A Fully Functional Test Facility Including Complete Documentation On All Components Materials Etc This Documentation Includes In Particular But Not Limited To All Operating Instructions Testimonials On The Materials And Components Used Confirmations Of Prototype Tests And The Hazard Analysis Performed Hazop Furthermore A Risk Assessment In Accordance With The Arbschg And Betrsichv Must Be Carried Out Which Can Serve As The Basis For The Risk Assessment Of The Client All Plant Components Are To Be Built According To The Currently Applicable Regulations This Includes In Particular Pressure Equipment Directive 2014 68 Eu Design Of Pressure Equipment In Accordance With Din En Standards Or Alternatively Ad 2000 Electrical Installations In Accordance With The Relevant Vde Guidelines Machinery Directive 2006 42 Ec Atex Product Directive 2014 34 Eu And Atex Operating Directive 1999 92 Ec Conformity To Ce Must Be Declared For The Pilot Plant As A Whole The Components Of The Systems Should Be Selected Such That They Have An Operating Pressure Of 0 01 Bar A To 6 Bar A At An Operating Temperature Of 5 To 350Oc Withstand The Design Temperature Must Be At Least 50Oc Are Above The Permissible Operating Temperature The Design Pressure Must Be At Least 3 Bar Above The Permissible Operating Pressure The Systems Must Be Provided With Adequate Thermal Insulation At All Points Where Temperatures Are To Be Expected Deviating From Room Temperature The Insulation Must Be Carried Out In Such A Way That It Can Be Removed And Replaced Non Destructively The Plants Are Operated With The Following Chemicals Perhydro Dibenzyltoluene And Their Partially And Fully Dehydrated Discharged Species Secondary Alcohols And Ketones From C3 Up To A Maximum Of Heptanol Heteroaromatic Components Loading And Unloading Such As Perhydro N Ethylcarbazole Hydrogen Helium Argon This Results In The Requirement To Carry Out The Media Contacting System Components Made Of The Stainless Steels 1 4571 Or 1 4404 In Addition Ptfe Teflon Pfa Ffkm Kalrez And Graphite Sealing Materials Should Be Used The Hydrogen Should Be At A Purity Of 3 0 The System Pressureless At A Temperature Of Max 20Oc Leave The Sizing And Selection Of The Various Cleaning Stages Should Also Be Offered Here The Plant Is Equipped With A Control And AutomationTime Limit For Receipt Of Tenders Or Requests To Participate Date 28 05 2019 Local Time 16 00 Disclaimer The Above Text Is Machine Translated For Accurate Information Kindly Refer The Original Document
Contact Information
Other Detail
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 19972626
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.