Prequalifications Are Invited For Coker Complex Rehabilitation New Hydrotreating Unit New Delay Coker Unit And Vapor Recovery Unit EgyptSopc Energy Efficiency Upgrade ProgramCoker Complex Rehabilitation ProjectInvitation For Prequalification Project Lots 1 12 For Coker Complex Rehabilitation New Hydrotreating Unit New Delay Coker Unit And Vapor Recovery Unit This Invitation For Prequalification Follows The General Procurement Notice For This Project Which Was Published On The Ebrd Website Project Procurement Notices Http Www Ebrd Com Pages Workingwithus Procurement Project Shtml On 16 October 2017 Suez Oil Processing Company Sopc Hereinafter Referred To As The Client Intends Using Part Of The Proceeds Of A Loan From The European Bank For Reconstruction And Development Hereinafter Referred To As The Bank Towards The Cost Of Sopc Energy Efficiency Upgrade Program Suez Oil Processing Company Sopc Intends To Revamp And Upgrade The Existing Delayed Coker Complex To Allow Operating The Complex At Its Original Throughput Of 5 000 Mtpd Of Atmospheric Residue The Coker Complex Is Located Within The Premises Of Sopc Refinery Area Suez Egypt The Project Will Cover Several Upgrade Steps Including The Following Modifications That Allow Together The Conversion Of The FeedS Heavy Residue Into The Desired More Valuable Products Such As Lpg Jet Fuel Euro 5 Diesel Petroleum Coke New Vacuum Distillation Unit Vdu To Replace The Existing UnitNew Distillate Hydro Treating Unit Dhtu To Replace The Existing Two Distillate Hydro Treating UnitsNew Delayed Coking Unit Dcu With All Its Supporting Units To Replace The Existing Units The Site Is Located In Suez Governorate Approximately 150Km East Of Cairo And Approximately 3 Km To The West Of The Central Business District Cbd Of The City Of Suez The Client Intends Prequalifying Firms And Consortia To Tender For The Following Contract S Hereinafter Referred To As The Contract To Be Funded From Part Of The Proceeds Of The Loan The Scope Of The Contract Includes The Purchasing Of 12 EquipmentS Lots Tenderers May Apply For Specific Or Combinations Of The Following EquipmentS Lots Lots Title1Fired Heaters2Api 618 Reciprocating Compressor3Api 617 Centrifugal Compressors4Air Compressors Dryers5Critical Heat Exchanger 1St Reactor Feed Effluent Exchangers Low Alloy Inconel Cladded 6Piping Bulk Metallic Nonmetallic 7Piping Valves 8Piping Supports Spring Rigid Struts Snubbers Sliding Plates Etc 9Piping Specialties Access Fittings Valves Interlock 10Explosion Proof Electrical Bulk Material11Main Electrical Equipment Switch Gear Swg Transformer 12New Integrated Control And Safety System Icss The Above Lots Detailed As A Following Lot 1 Fired Heaters Fired Heater Definition Function Fired Heater Is Equipment Used To Provide Heat For A Process Or Can Serve As Reactor Which Provides Heats Of Reaction Heater Designs Vary As To Its Function Heating Duty Type Of Fuel And Method Of Introducing Combustion Air Fired Heater Package Main Components 1 Fired Heater Structure Composed Of Three Main Items Radiant Section Fire Box Convection Section Stack2 Burners Low Nox Burners Liquid Fuel Or Gas Fuel Types3 Fuel Gas Skid4 Plc5 Burner Management System6 Package Instruments And Interconnecting Cables7 Package Piping8 Air Preheating System If Applicable Lot 2 Api 618 Reciprocating Compressor Reciprocating Compressors Packages For Use In Refinery Industry Process Services According To Api 618 Latest Edition Requirements Lot 3 Api 617 Centrifugal Compressors Centrifugal Compressors Packages For Use In Refinery Industry Process Services According To Api 617 Latest Edition Requirements Lot 4 Air Compressors Dryers 1 Oil Flooded Screw Air Compressor Package According To Manufacturer Standard 2 Packaged Integrally Geared Centrifugal Air Compressor According To Api 672 Latest Edition For Use In Refinery Industry Dryers Including Refrigerant Desiccant Dual Towers Pre Filters After Filters Coalescing Filters After Cooler According To Manufacturer Standard To Achieve Air Quality Of 1m Solid Particle Size Dew Point Of 40 C And 0 01 Ppm Of Oil For Instrument Air Which Is In Accordance With Class 2 2 1 Compressed Air Quality Based On Iso 8573 1 Lot 5 Critical Heat Exchanger 1St Reactor Feed Effluent Exchangers Low Alloy Inconel Cladded A Heat Exchanger Is A Device Used To Transfer Heat Between Two Or More Fluids The Hot And Cold Fluids Are Separated By A Solid Thin Wall Allowing The Exchange Of Heat Between The Two Fluids As A Result The Hot Fluid Is Cooled And The Cold Fluid Is Heated Lot 6 Piping Bulk Metallic Nonmetallic Piping Bulk Metallic Nonmetallic Definition Pipes And Fittings System That Conveys Liquid Gas And Occasionally Solid Materials Piping Bulk Metallic Nonmetallic Function Conveying Liquid Gas And Occasionally Solid Materials Through Process Stages Types Of Piping Bulk Metallic Nonmetallic Piping Bulk Includes Two Types 1 Pipes2 FittingsFittings Include Many Types Such As 1 Flanges2 Elbows3 Tees4 Olets5 Blinds Spacers6 Nipples Lot 7 Piping Valves Piping Valves Definition A Valve Is A Device That Regulates Directs Or Controls The Flow Of A Fluid Gases Liquids Fluidized Solids Or Slurries By Opening Closing Or Partially Obstructing Various Passageways Manually Piping Valves Function On Off Control Non ReturnTypes Of Piping Valves 1 Gate Globe Check Smaller Than 2 2 Gate Globe Check Equal Or Larger Than 2 3 Ball Valves 4 Butterfly Valves5 Dual Plates Check Valves Lot 8 Piping Supports Spring Rigid Struts Snubbers Sliding Plates Etc Piping Supports Spring Rigid Struts Snubbers Sliding Plates Etc Piping Supports Definition Piping Support Is A Structural Element Which Carries The Weight Of The Piping And Or Controls The Piping Movement Piping Supports Function 1 Keeping The Stresses In The Piping System Within Its Allowable Limits 2 Controlling The Imposed Loads From The Piping Systems On The Equipment Types Of Piping Supports Piping Supports Definition Piping Support Is A Structural Element Which Carries The Weight Of The Piping And Or Controls The Piping Movement Piping Supports Function 1 Keeping The Stresses In The Piping System Within Its Allowable Limits 2 Controlling The Imposed Loads From The Piping Systems On The Equipment Types Of Piping Supports 1 Spring Supports Uses Helical Coil Compression Springs To Accommodate Loads And Associated Pipe Movements Due To Thermal Expansions Or Differential Settlement They Are Broadly Classified Into Two Types Variable And Constant Spring Supports 2 Rigid StrutsRigid Struts Are A Rigid Connection Between A Piping System And Supporting Structure They Offer A Pivot Connection Allowing A Small Angular Displacement 7 Degrees Whilst Maintaining A Rigid Connection In Both Compression And Tension This Allows A Pipe Movement Due To Thermal Expansion In A Singular Direction 3 SnubbersDynamic Restraints Commonly Used To Protect Pipe Work From Abnormal Movement In Process Piping In Situations Such As Earthquake Or Fluid Disturbance Caused By Valve Closure Or Pumping Lot 9 Piping Specialties Access Fittings Valves Interlock Piping Specialties Access Fittings Valves Interlock Piping Specialties Definition Items Not Covered By Codes StandardsPiping Specialties Function 1 Access Fittings Monitor Control The Corrosion Rate2 Valve Interlock Controls Sequence Of Opening Closing ValvesTypes Of Piping Specialties Including But Not Limited To The Following 1 Access Fittings2 Valves Interlock3 Flexible Hoses And Hose Connections4 Expansion Joints Rubber Metallic 5 Strainers Lot 10 Explosion Proof Electrical Bulk Material Electrical Material Used In Hazard Process Area Such As Lighting Fixtures Junction Boxes Sockets Power Distribution Panels Motor Control Stations Lot 11 Main Electrical Equipment Switch Gear Swg Transformer Switchgear Medium Low Voltage Power Transformers Distribution Panels Un Interrupted Power Supply Ups And Battery Chargers Lot 12 New Integrated Control And Safety System Icss Integrated Control And Safety System Icss Is Composed Of Distributed Control System Dcs Emergency Shutdown System Esd And Fire Gas System That Will Monitor Control And Ensure The Safety Operations For The Project Units The Dcs And Esd Will Interface To The Plant Equipment Instruments By Hard Wired Io Through Marshalling Cabinets Located In The Control Room The Dcs Will Also Interface To The Packages Via Serial Links F G Cabinets Will Interface To Dedicated Fire And Gas Detection System The Client Will Provide The Materials Requisitions MrqS For The Above Mentioned Lots As ItS Part Of Tender DocS And Will Be Provided At Stage Of Inviting Prequalified Applicants To Tender Two Stage Goods And Related Services Prequalification And Tendering For Contracts To Be Financed With The Proceeds Of A Loan From The Bank Is Open To Firms And Joint Ventures Of Firms From Any Country Prequalificatio
Contact Information
Other Detail
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 19961152
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.