Quotation Are Invited For Build Perimeter Walls Detailed RequirementsThe Work Comprises The Following Tasks The Required Tasks Are Outlined Below The Contractor Is Encouraged To Contact The Referenced Point OfContact For More Information Should It Be Required Remove Broken WallO Breakdown And Remove The Existing Fencing And Construct New Walls With Proper Footings Remove All Rubble From Site In 1Days And Then Daily For The Duration Of The Project Remove Constantia Barb Wire But Save As It Will Be Re Installed On TheNew Wall Panels The Gate Must Be Reinstalled As Is And Be Completely Functioning At The Completion Of The Project O A Temporary Barricade Or Fence Must Be Installed To Prevent Unauthorized Access Once Any Wall Panels Have Been Removed The Palisades On Site Can Be Used As A Temporary Fence New FoundationO Ensure The Integrity Of The Foundation Has Not Been Compromised It Must Meet The Standards Below A Proper And Secure Foundation Has To Be Trenched 500Mm X 600Mm And Then Casted With High Strength Concrete MixAnd Re Enforcing To Insure No Sagging Or Collapsing Of The Wall Re Bar 10Mm 6 Bars Minimum Has To Be Installed ToThe Local Building Regulations To Insure A Strong Secure Sturdy And Long Lasting Foundation The Re Bar Has To Have 50 Mm Spacers On The Bottom And A Minimum Of 50Mm Thickness On Its Topping Top Side The Soil Type Properties Need To Be Taken Into Account When Erecting The New Wall S The Necessary Steps Has To Be Casted To Accommodate For The Slope Of The Yard And The Wall Pillars To Allow Proper AndSecure Foundation And Wall Cast 300Mm X 600Mm Mass Minimum Of 25 Mpa Concrete Strip Foundation The Length Of The Wall S Ready Mix Trucks To Be Used With The Correct Concrete Mix For The Foundation Can Be Poured With Wheelbarrows WhereThe Truck CanT Reach Build New Perimeter WallO Damp Proof Course Dpc The Full Length Of The Panel To Be Replaced Minimum 350 Micron O If Utilizing Bricks Cement Mortar Must Be Not Less Than 14Mpa And Bricks Must Be Kept Wet When Building The Wall O Interlocking Blocks May Be Interchanged For BricksO A Double Brick Wall Has To Be Erected Build With A Semi Face Brick No Mampara Bricks According To Local BuildingStandards Including Double Brick Force Build In On At Least Every 3Rd Course Of Bricks O Measuring Of The Exact Wall Length To Build Is The Responsibility Of The Contractor O Support Pillars With The Necessary Expansion Joints Have To Be Built At A Maximum Of 3 Meters Apart To Allow For TheNecessary Movement And To Prolong The Walls Life Span O A Course Roll Brick On Edge Line Has To Be Built On Top Of The Newly Build WallO Ensure The Pillars Size Strength Complies With The Local Requirements Standards O Back Fill And Compact The Trench On Both Sides Of The New Wall S O The Mortar Cement Line Has To Be Cleaned Out Properly And Professionally And The Wall Has To Be Cleaned And Washed With AProper Brick Washing Agent To Insure The Wall Will Be Without Any Mortar And Or Cement Residue This Is Relevant On BothSides Of The New Boundary Walls O Ensure The Cement And Mortar Mix Is Correct And That Enough Cement Is In All The Cement Lines Properly Supporting TheBricks In The New Wall S To Ensure Durability O The Necessary Rain Water Drain Holes Weep Holes Have To Be Left In The Parameter Wall To Allow Easy Flow Of Rain WaterWhen Necessary A Minimum Of X4 Per Relevant Wall And Spaced Out To The Lowest Areas Where Water Will Build Up Along TheWall Do Proper Finishing Of On Both Sides Of The Wall O All Rubble Removed From Site Area Cleaned And Garden Plants Grass Repaired Replaced In Original State In The ProjectTime Frame
Contact Information
Other Detail
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 19731487
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.