Contract Notice Wastewater Treatment Plant Construction WorkExtension Of Wastewater Treatment Plant Ii In The Industrial Park Schwarze PumpeDescription The Aerobic Biological Wastewater Treatment Plant Aba Ii Completed In 2013 In The Industrial Park Schwarze Pumpe Is The Property Of Zweckverband Industriepark Schwarze Pumpe And Is Operated By Asg Spremberg Gmbh The Aba Ii Processes The Social And Sanitary Sewage Of The Industrial Park As Well As Upstream Grids Process Waste Water From The Ebs Power Plant Of Spreerecycling Gmbh And The Leag Power Plant Schwarze Pumpe And Water From Groundwater Remediation In Addition Anaerobically Pre Treated Wastewater From Aba I Is Currently Being Treated Due To Planned Settlements In The Industrial Park The Expansion Of The Wastewater Treatment Plant Aba Ii Is Required As Part Of The Extension Of The Aba Ii The Following Main Construction Measures Are Required New Aeration Tank 3 4 Total 7 600 M3 And Disaster Areas 1 2 Total 7 600 M3 Conversion And Extension Works Best Secondary Clarifier 1 Demolition Of The Ring Wall New Building Secondary Sedimentation Tank 3 1 090 M2 New Construction Drainage Secondary Clarifier 2 3 New Foundation Plate Sludge Storage Tank New Foundation Plate Hydrolysis New Pump House Hydrolysis New Foundation Plate Anaeroby New Foundation Plate Pellet Storage New Foundations Of Gas Flares New Building Foundations Gas Storage New Foundation Plate For Biogas Desulphurisation And Exhaust Air Treatment New Foundation Plate Biogas Upgrading New Foundation Plate Silo Activated Carbon New Building Foundations Cooling Inlet New Foundations And Supporting Structure Pipe Bridges New Construction Connecting Buried Pipelines Up To Dn 1000 All Newly Constructed Systems Must Be Connected To Each Other And Or To The Stock The Respective Pipe Routing Takes Place With Buried Pipelines Or Via Pipe Bridges Other Construction Works Include The Construction Of Operating Roads And The Modeling Of The Site After Completion Of The Construction Work The Contractor Must Provide The Following Services Construction Site Equipment And Provision And Securing Of The Construction Site Work Planning And Installation Of Scaffolding And Fall Protection Static Proof Installation Parts And Locksmith Work Earthworks Shoring Special Foundation Works Concrete And Reinforced Concrete Works Steel Construction And Locksmith Work Metalwork Roofing And Plumbing Work Demolition Foundation Earth Buried Pipelines Road Works Leak Tests Piping And Structures As Well As Clearing Of The Construction Site And The Disposal Of The Resulting Waste The Services Of The Technical Equipment Are Not Part Of This Invitation To Tender And Are Provided By The Client The Construction Site Is Located In The Industrial Park Schwarze Pumpe All Measures For The Extension Of Aba Ii Must Be Carried Out During Operation Business Interruptions Of The Existing Line Are Only Possible In Close Cooperation With The Operator And For A Short Time The Extension Of The Aba Ii Will Be Fully Available On 30 6 2020 A Takeover Of Small Amounts Of Wastewater Before This Time Must Be Possible Through Appropriate Measures A Takeover Of Wastewater From The Aba I By The Aba Ii Should Not Take Place After Commissioning Of The Extension Of The Aba Ii A Company Building Also To Be Built On The Aba Ii Site Will Be Tendered In A Separate Contract Notice Time Limit For Receipt Of Tenders Or Requests To Participate Date 17 04 2019 Local Time 12 00 Disclaimer The Above Text Is Machine Translated For Accurate Information Kindly Refer The Original Document
Contact Information
Other Detail
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 19334504
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.