Contract Notice Architectural Construction Engineering And Inspection ServicesTnw Technische Ausr stung Elt Lk Rottal Inn Neubau Vocational School PfarrkirchenDescription The District Of Rottal Inn Is Planning The Construction Of The Vocational School In Pfarrkirchen The Functional And Spatial Program Which Is Already Coordinated With The Government Of Lower Bavaria Is Available This Has The Status 8 3 2018 And Is Enclosed With The Tender Documents The Total Cost Of The Measure Is About 60 70 Million Eur Net Kg 200 700 There Are Still Classrooms And Specialist Rooms Included In The Program In Addition The Last Stage Of Construction Is A Gym With A Double Gym Incl Sanitary Facilities And Changing Rooms With Access To The Vocational School To Be Planned The Fag Application For The First Construction Phase Is Due Next Year The Measure Is To Be Implemented In 4 Construction Stages Whereby The Performance Phases 1 And 2 Are To Be Provided At The Beginning Over All Construction Stages The Later Stages Of Construction Will Then Be Commissioned Step By Step So That A Total Of 13 Stages Will Be Awarded The First Phase Of Construction Is Planned For The New Building Of The Fachklassentrakt With Workshop This Should Take Place On The Open Field In The Max Breiherr Stra e With Extension Option The Corresponding Fachklassentrakt In The Adam Regensburger Road Will Be Broken Off The Second Construction Phase Is The Demolition Of The Vocational School 2 In The Max Breiherr Stra e Including Replacement Construction The Third Construction Phase Is The Replacement Of The Remaining Vocational School From The Adam Regensburger Stra e At The Max Breiherr Stra e Location In The Last Phase Of Construction The Gymnasium Will Be Realized After The New Building In Doing So It Must Be Ensured That The Building Is Fully Functional As Of Completion Completion Of Construction Phase 1 This Is A First Rough Planning Possibly The Construction Phases Are Still Changing In The Project Realization The Planned Procedure Is Also Apparent From The Attached Plans Until Now Separate Concepts Have Been Available For Both Locations This Shall Be Changed Now It Should Be A Collaborative Project The Currently Double Areas For Both Schools Are To Be United A Functional Connection Should Arise Finally A Building With An Overall Concept Should Be The Result The Implementation Takes Place On A Building By Building Basis Since The Room Concept Only Counts For One Year It Has To Be Adapted Again And Again For This Reason It Is Also Just A Building To Create Thus The Chargeable Costs Are Only For A Building To Use The Planning And Construction Time Is Estimated At Roughly 15 To 20 Years As The 4 Construction Phases Are To Be Realized One After The Other Subject Of The Contract Are The Planning Services For The Technical Planning Of Technical Equipment Annexes 4 5 And 6 Elt Section 55 1 Hoai 2013 Part 4 Section 2 Basic Services Of The Lph 1 9 With The Exception Of Lph 4 Where The Lph 7 With One Percentage Point Less As The Client Provides Services Himself These Are The Dispatch Or Upload Of The Tender Documents The Submission The Formal Review Of Bids The Scheduling Logging And Lead Of Bidders With The Presence Of Planner As Well As The Preparation And Dispatch Of Rejection Letters In Addition The Special Performance Of The Monitoring Of The Elimination Of Defects Within The Statute Of Limitations Shall Be Awarded As A Percentage Of The Basic Services Time Limit For Receipt Of Tenders Or Requests To Participate Date 16 04 2019 Local Time 10 00 Disclaimer The Above Text Is Machine Translated For Accurate Information Kindly Refer The Original Document
Contact Information
Other Detail
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 19308493
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.