Contract Notice Verification Of Load Bearing Structure Design ServicesTesting Services For Structural Design Testing Testing Of Technical Equipment And Fire Protection For The Planning And Construction Of The Kiel Small SluiceDescription 1 The Contract Includes The Structural Design Test The Testing Of The Technical Equipment And The Testing Of The Fire Protection And The Coordination Of These Services 2 The Structural Design Test Includes The Lock Construction Pit The Lock Demolition The Solid Construction The Structural Engineering And The Steel Hydraulic Engineering Including All Associated Sub Objects Trades And Components 3 The Description Of The Test Performances To Be Carried Out Is Based On The Guideline For The Determination Of The Remuneration For The Static And Constructive Examination Of Civil Engineering Structures For Traffic Facilities As Well As The Examination Of The Structural Fire Protection For Passenger Transport Facilities Of The Federal Railways Rvp As Of 2016 08 4 The Examination Of Technical Equipment Ta Comprises The Groups Of Equipment According To Hoai 2013 Annex 15 2 Group Of Units 1 8 5 Test Engineers For Fire Protection Check The Completeness And Accuracy Of The Fire Protection Fire Protection Concepts For The Respective Sub Objects The Exam Refers To The Following Essential Contents Fire Behavior Of Building Materials Fire Resistance Usage Unit Fire And Smoke Sections Required Distances First And Second Escape Routes Areas For The Fire Brigade Extinguishing Water Supply Details For Special Buildings The Test Engineer Must Supervise And Ensure The Proper Construction Of The Fire Protection Certificate He Has Tested In Commissioning Level 1 The Examination And The Coordination Of The Examination Performance For The Draft Execution Documents E Au 1 And E Au 2 For All Planned Performance Plans And Phases 1 To 5 Of The Hoai Is Based On Compliance With The Planning Contract And The Generally Accepted Rule Of The Technique In The Commissioning Level 2 The Examination And The Coordination Of The Examination Performance For The Tender Documents Of The Performance Phase 6 And 7 Of The Hoai And The Construction Contract Documents On The Basis Of The Draft Execution Documents 1 E Au 1 And In Accordance With The Requirements Of The Vv Wsv 2102 And The Regulations Of The Vob Part C In The Commissioning Level 3 The Examination And The Coordination Of The Examination Performance For The Tender Documents Of The Performance Phase 6 And 7 Of The Hoai And The Construction Contract Documents On The Basis Of The Draft Execution Documents 2 E Au 2 And According To The Requirements Of The Vv Wsv 2102 And The Regulations Of The Vob Part C In The Commissioning Level 4 The Examination And The Coordination Of The Examination Performance For The Execution Planning Performance Phase 4 And 5 Of The Hoai Of The Structural Implementation Of The Draft Au 1 On Compliance With The Building Contract And The Generally Accepted Rules Of Technology In The Commissioning Level 5 The Examination And The Coordination Of The Examination Performance For The Execution Planning Performance Phase 4 And 5 Of The Hoai Of The Structural Implementation Of The Draft Au 2 On Compliance With The Building Contract And The Generally Accepted Rules Of Technology Time Limit For Receipt Of Tenders Or Requests To Participate Date 20 02 2019 Local Time 10 00 Disclaimer The Above Text Is Machine Translated For Accurate Information Kindly Refer The Original Document
Contact Information
Other Detail
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 18343019
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.