Additional Groundwater Monitoring Well Drilling At The Former Michael 039 S Auto Service Facility The Contractor Shall After Mobilization And Set Up Drill And Install Four 4 Groundwater Monitoring Wells Using Truck Mounted Air Rotary Drilling Equipment The Contractor Will Be A Licensed Water Well Driller Have At Least 15 Years Of Experience Drilling And Installing Groundwater Monitoring Wells The Drilling Crew Must Have A Minimum Of Three Years Experience In Groundwater Monitoring Well Drilling And Installation Using The Selected Technique And Will Furnish All Equipment Tools Labor Materials And Supplies Necessary To Perform The Project The Wells Shall Be Drilled At The Locations Identified On Contract Drawing Figure 2 An Engineer Professional Geologist Contracted Separately By The Airport Authority Shall Observe And Log E G Lithology And Geology The Drilling And Construction Of The Groundwater Monitoring Wells During The Project S Entirety The Groundwater Monitoring Wells Shall Be Constructed Of Two Inch Diameter Pvc Slotted Well Screen And Solid Riser Pipe To A Maximum Depth Of Approximately 100 Feet The Screened Interval In Each Well Shall Be Based Upon Actual Subsurface Conditions Identified In The Field The Wells Shall Be Generally Screened In 10 Foot Intervals Corresponding With The Depth Of First Water Encountered And Screened Across This Interval For Future Groundwater Level And Sampling Purposes The Drilling Rig Shall Be Steam Cleaned Between Locations And Associated Equipment Decontaminated Between Locations All Shall Be Performed On A Decontamination Pad Provided And Constructed By The Contractor All Wells Shall Be Completed With Protective Steel Stick Up Casing That Extends To The Bedrock Surface Approximately 55 Feet Total Including Stick Up Locking Caps And Concrete Pads Drill Cuttings Shall Be Placed In Contractor Provided 55 Gallon Drums And Staged At The Neighboring Airport Tape Works Facility Characterization And Disposal Will Be Contracted Separately By The Engineer Professional Geologist And The Lehigh Northampton Airport Authority The Wells Will Be Developed By Surging And Over Pumping By The Contractor Using A Grundfos Pump Purged Groundwater Generated During Well Development Will Be Containerized In Metal 55 Gallon Drums And Staged At The Tape Works All Waste Characterization And Disposal Will Be Contracted Separately By The Engineer Professional Geologist And The Lehigh Northampton Airport Authority The Contractor Shall Provide For Cleanup And Demobilization From The Site Further Details Regarding The Bid And Specific Drilling Details And Units Are Provided In Part Iv Bid Forms
Contact Information
Other Detail
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 16650524
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.