|
Bids Are invited for Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - Onboard Wnc Ships; Rrc For Repair/ Maintenance Of Vacuum Sanitation System Fitted Onboard Wnc Ships; Service Provider - Control Panel Inclusive Of Cabels Within The Panel , Vacuumerator Pump , Vpc Controller , Fd Valve , Ed Valve , Isolating Valve , Control Panel , Vacuumerator Pump , Vpc Controller , Fd Valve , Ed Valve , Isolating Valve , Vacuumerator Pump Installation/De-Instalation , Chemical Cleaning Of Vss Pipeline Inclusive Of Chemical , Renewal Of Vss Pipeline With New Pipeline, Fasteners For Pipe Flanges And Gasket. , Removal Of Vss Pipeline , Replacement Of Toilet , Replacement Of Urinal , Replacement Of Seat Cover , Replacement Of Vpc Controller , Replacement Of Pressure Switch , Replacement Of Vacuum Gauge , Replacement Of Release Button , Repair Of Toilet , Repair Of Urinal , Repair Of Vpc Controller , Repair Of Pressure Switch , Repair Of Vacuum Gauge , Recabeling Of Control Panel , For Ed Valve , For Control Panel , Inspection, Pressure Testing/Leak Testing And Refittment Of Vss Pipe Line Per Meter Per System , Defect Investigation Of Dosing System (P15b) , Replacement Of Dosing System (P15b) , Fault Analysis Of Vacuumerator Pump (P15b) , Overhauling Of Vacuumerator Pump (P15b)
|