|
Tender for G-Af-11-Pc-4S: Supply And Installation Of Porcupines In Four Subproject Areas (Dhemaji And Lakhimpur, Jorhat, Goalpara And Morigaon), Assam, India (Lot-2) , Grand Total Of Schedule 1, Schedule 2 And Schedule 3 , Currency 1 - Inr , Currency 2 - Usd , Currency 3 - Eur , Currency 4 - Aud , Currency 5 - Gbp , Currency 6 - Jyp Name Of The Bidder : 0.0 Ifb No. Price Schedule (Schedule 1) - Price Schedule For Goods To Be Offered From Within The PurchaserS Country (This Boq Template Must Not Be Modified/Replaced By The Bidder And The Same Should Be Uploaded After Filling The Relevent Columns, Else The Bidder Is Liable To Be Rejected For This Tender. Bidders Are Allowed To Enter The Bidder Name And Values Only ) Notes Column 4: In Accordance With Margin Of Preference Itb 35, If Applicable. Domestic Value Added Comprises Domestic Labor, The Domestic Content Of Materials, Domestic Overheads, And Profits From The Stage Of Mining The Raw Material Until Final Assembly. Column 6: Incoterms In Accordance With Itb 14. Currency In Accordance With Itb 15. Price Shall Include All Customs Duties And Sales And Other Taxes Already Paid Or Payable On The Components And Raw Materials Used In The Manufacturer Or Assembly Of The Item Or The Customs Duties And Sales And Other Taxes Already Paid On Previously Imported Items. Column 8: Payable In The PurchaserS Country If Contract Is Awarded. Item No. Description Country Of Origin Domestic Value Added In Percentage Quantity And Unit Of Measurement Unit Price Exw Total Exw Price Per Item Sales And Other Taxes Per Item Total Price Per Item Including Taxes Quantity Unit % Amount , Supply And Installation Of Porcupines In Goalpara, Dhubri And Barpeta W.R. Division Location A: Under Goalpara W.R. Division , Cost Of Supply Of Pre-Stressed Ce-Ment Concrete (Psc) Porcupine Members Of Size 0.10M X 0.10Mx 3.00M With M-30 Grade Of Cement Concrete. The Technical Specifications Are In Section 6.3. Location B: Under Dhubri W.R. Division 0.0 0.0 0.0 1.01 Supplying, Conveying And Fixing Spls. Including Eart Item1 123.223 Nos , Cost Of Supply Of Pre-Stressed Ce-Ment Concrete (Psc) Porcupine Members Of Size 0.10M X 0.10Mx 3.00M With M-30 Grade Of Cement Concrete. The Technical Specifications Are In Section 6.3. Location C: Under Barpeta W.R. Division 0.0 0.0 0.0 1.01 Supplying, Conveying And Fixing Spls. Including Eart Item1 123.223 Nos , Cost Of Supply Of Pre-Stressed Ce-Ment Concrete (Psc) Porcupine Members Of Size 0.10M X 0.10Mx 3.00M With M-30 Grade Of Cement Concrete. The Technical Specifications Are In Section 6.3 , Environmental Mitigation & Monitoring Measures , Location A: Under Goalpara W.R. Division , Obtaining And Submission Of Copies To Engi-Neer All Consents, Permits, Clearanc-Es, No Objection Clearances Or Nocs, Tree Cut-Ting Permissions, And Other Relevant Permits From Vari-Ous Authorities Before The Start Of Construction , Disposal Of Exist-Ing Old Geo-Bags And Other Materi-Als Used As Tem-Porary Anti-Erosion And Flood Protec-Tion Measures, And Disposal Of All Solid Wastes Dur-Ing Construction To Designated Loca-Tions And/Or Use Of Local Municipal Services , Provision Of All Requisite Facilities (I.E. Drinking Water Supply, Sanitation, Domestic Solid Waste Collection & Disposal, Fuel Supply Etc.) At Labour/ Construc-Tion Camps. , Air Quality Moni-Toring For Pm2.5, Pm10, So2, Nox, Co, Pb (Considering Use Of Motorized Boats For Porcu-Pine Installations) Once During The Installation Of Por-Cupine , Noise Levels Moni-Toring For Noise Levels In Db (A) For Day, Night, L10, L90, Lmax, Lmin (Considering Aquatic Ecology Of The Riparian Envi-Ronment) , Surface Water Quality Monitoring For Ph, Bod, Cod, Tds, Tss, Do, Oil And Grease And Other Physiochemical And Biological Parameters , Assessment Of Biodiversity With Special Empha-Size On Conservation Of Aquatic Ecology And Miti-Gation Measures , Ppe Kits For The Labours Consider-Ing Working Condi-Tion On Deep Waters Using Boats , Awareness Camp/ Training For The Labours On Envi-Ronmental Safe-Guard & Occupa-Tional Health Safe-Ty, Covid-19 Protocols , Location B: Under Dhubri W.R. Division , Obtaining And Submission Of Copies To Engineer All Consents, Permits, Clearances, No Objection Clearances Or Nocs, Tree Cutting Permissions, And Other Relevant Permits From Various Authorities Before The Start Of Construction , Disposal Of Exist-Ing Old Geo-Bags And Other Materi-Als Used As Tem-Porary Anti-Erosion And Flood Protec-Tion Measures, And Disposal Of All Solid Wastes Dur-Ing Construction To Designated Loca-Tions And/Or Use Of Local Municipal Services , Provision Of All Requisite Facilities (I.E. Drinking Water Supply, Sanitation, Domestic Solid Waste Collection & Disposal, Fuel Supply Etc.) At Labour/ Construction Camps. , Air Quality Moni-Toring For Pm2.5, Pm10, So2, Nox, Co, Pb (Considering Use Of Motorized Boats For Porcu-Pine Installations) Once During The Installation Of Porcupine , Noise Levels Moni-Toring For Noise Levels In Db (A) For Day, Night, L10, L90, Lmax, Lmin (Considering Aquatic Ecology Of The Riparian Environment) , Surface Water Quality Monitoring For Ph, Bod, Cod, Tds, Tss, Do, Oil And Grease And Other Physiochemical And Biological Parameters , Assessment Of Biodiversity With Special Empha-Size On Conserva-Tion Of Aquatic Ecology And Mitigation Measures , Ppe Kits For The Labours Consider-Ing Working Condi-Tion On Deep Waters Using Boats , Awareness Camp/ Training For The Labours On Envi-Ronmental Safe-Guard & Occupa-Tional Health Safe-Ty, Covid-19 Pro-Tocols , Location C: Under Barpeta W.R. Division , Obtaining And Submission Of Copies To Engineer All Consents, Permits, Clearances, No Objection Clearances Or Nocs, Tree Cutting Permissions, And Other Relevant Permits From Various Authorities Before The Start Of Construction , Disposal Of Exist-Ing Old Geo-Bags And Other Materi-Als Used As Tem-Porary Anti-Erosion And Flood Protec-Tion Measures, And Disposal Of All Solid Wastes Dur-Ing Construction To Designated Loca-Tions And/Or Use Of Local Municipal Services , Provision Of All Requisite Facilities (I.E. Drinking Water Supply, Sanitation, Domestic Solid Waste Collection & Disposal, Fuel Supply Etc.) At Labour/ Construction Camps. , Air Quality Moni-Toring For Pm2.5, Pm10, So2, Nox, Co, Pb (Considering Use Of Motorized Boats For Porcu-Pine Installations) Once During The Installation Of Porcupine , Noise Levels Moni-Toring For Noise Levels In Db (A) For Day, Night, L10, L90, Lmax, Lmin (Considering Aquatic Ecology Of The Riparian Environment) , Surface Water Quality Monitoring For Ph, Bod, Cod, Tds, Tss, Do, Oil And Grease And Other Physiochemical And Biological Parameters , Assessment Of Biodiversity With Special Empha-Size On Conserva-Tion Of Aquatic Ecology And Miti-Gation Measures , Ppe Kits For The Labours Consider-Ing Working Condi-Tion On Deep Waters Using Boats , Awareness Camp/ Training For The Labours On Envi-Ronmental Safe-Guard & Occupa-Tional Health Safe-Ty, Covid-19 Protocols Total Amount 0.0 0.0 0.0 Name Of The Bidder : 0.0 Ifb No. Price Schedule (Schedule 2) - Price Schedule For Goods To Be Offered From Outside The PurchaserS Country (This Boq Template Must Not Be Modified/Replaced By The Bidder And The Same Should Be Uploaded After Filling The Relevent Columns, Else The Bidder Is Liable To Be Rejected For This Tender. Bidders Are Allowed To Enter The Bidder Name And Values Only ) Notes Column 5 And 6: Incoterms In Accordance With Itb 14. Currency In Accordance With Itb 15. Column 6: Only To Be Used If The Purchase Wishes To Reserve Transportation And Insurance To Domestic Companies Or Other Designated Sorces. Identification Of Lowest Evaluated Bid Must Be On The Basis Of The Cif Or Cip Price, But The Purchaser May Sign The Contract On Fob Or Fca Terms And Make Its Own Arrangement For Transportation And / Or Insurance. Item No. Description Country Of Origin Quantity And Unit Of Measurement Unit Price Cif / Cip Unit Price Fob / Fca Quoted Currency Total Price Cif / Cip Per Item Total Price Fob / Fca Per Item Quantity Unit , Supply And Installation Of Porcupines In Goalpara, Dhubri And Barpeta W.R. Division Location A: Under Goalpara W.R. Division , Cost Of Supply Of Pre-Stressed Ce-Ment Concrete (Psc) Porcupine Members Of Size 0.10M X 0.10Mx 3.00M With M-30 Grade Of Cement Concrete. The Technical Specifications Are In Section 6.3. Location B: Under Dhubri W.R. Division 0.0 0.0 1.01 Supplying, Conveying And Fixing Spls. Including Eart Item1 123.223 Nos , Cost Of Supply Of Pre-Stressed Ce-Ment Concrete (Psc) Porcupine Members Of Size 0.10M X 0.10Mx 3.00M With M-30 Grade Of Cement Concrete. The Technical Specifications Are In Section 6.3. Location C: Under Barpeta W.R. Division 0.0 0.0 1.01 Supplying, Conveying And Fixing Spls. Including Eart Item1 123.223 Nos , Cost Of Supply Of Pre-Stressed Ce-Ment Concrete (Psc) Porcupine Members Of Size 0.10M X 0.10Mx 3.00M With M-30 Grade Of Cement Concrete. The Technical Specifications Are In Section 6.3 , Environmental Mitigation & Monitoring Measures , Location A: Under Goalpara W.R. Division , Obtaining And Submission Of Copies To Engi-Neer All Consents, Permits, Clearanc-Es, No Objection Clearances Or Nocs, Tree Cut-Ting Permissions, And Other Relevant Permits From Vari-Ous Authorities Before The Start Of Construction , Disposal Of Exist-Ing Old Geo-Bags And Other Materi-Als Used As Tem-Porary Anti-Erosion And Flood Protec-Tion Measures, And Disposal Of All Solid Wastes Dur-Ing Construction To Designated Loca-Tions And/Or Use Of Local Municipal Services , Provision Of All Requisite Facilities (I.E. Drinking Water Supply, Sanitation, Domestic Solid Waste Collection & Disposal, Fuel Supply Etc.) At Labour/ Construc-Tion Camps. , Air Quality Moni-Toring For Pm2.5, Pm10, So2, Nox, Co, Pb (Considering Use Of Motorized Boats For Porcu-Pine Installations) Once During The Installation Of Por-Cupine , Noise Levels Moni-Toring For Noise Levels In Db (A) For Day, Night, L10, L90, Lmax, Lmin (Considering Aquatic Ecology Of The Riparian Envi-Ronment) , Surface Water Quality Monitoring For Ph, Bod, Cod, Tds, Tss, Do, Oil And Grease And Other Physiochemical And Biological Parameters , Assessment Of Biodiversity With Special Empha-Size On Conservation Of Aquatic Ecology And Miti-Gation Measures , Ppe Kits For The Labours Consider-Ing Working Condi-Tion On Deep Waters Using Boats , Awareness Camp/ Training For The Labours On Envi-Ronmental Safe-Guard & Occupa-Tional Health Safe-Ty, Covid-19 Protocols , Location B: Under Dhubri W.R. Division , Obtaining And Submission Of Copies To Engineer All Consents, Permits, Clearances, No Objection Clearances Or Nocs, Tree Cutting Permissions, And Other Relevant Permits From Various Authorities Before The Start Of Construction , Disposal Of Exist-Ing Old Geo-Bags And Other Materi-Als Used As Tem-Porary Anti-Erosion And Flood Protec-Tion Measures, And Disposal Of All Solid Wastes Dur-Ing Construction To Designated Loca-Tions And/Or Use Of Local Municipal Services , Provision Of All Requisite Facilities (I.E. Drinking Water Supply, Sanitation, Domestic Solid Waste Collection & Disposal, Fuel Supply Etc.) At Labour/ Construction Camps. , Air Quality Moni-Toring For Pm2.5, Pm10, So2, Nox, Co, Pb (Considering Use Of Motorized Boats For Porcu-Pine Installations) Once During The Installation Of Porcupine , Noise Levels Moni-Toring For Noise Levels In Db (A) For Day, Night, L10, L90, Lmax, Lmin (Considering Aquatic Ecology Of The Riparian Environment) , Surface Water Quality Monitoring For Ph, Bod, Cod, Tds, Tss, Do, Oil And Grease And Other Physiochemical And Biological Parameters , Assessment Of Biodiversity With Special Empha-Size On Conserva-Tion Of Aquatic Ecology And Mitigation Measures , Ppe Kits For The Labours Consider-Ing Working Condi-Tion On Deep Waters Using Boats , Awareness Camp/ Training For The Labours On Envi-Ronmental Safe-Guard & Occupa-Tional Health Safe-Ty, Covid-19 Pro-Tocols , Location C: Under Barpeta W.R. Division , Obtaining And Submission Of Copies To Engineer All Consents, Permits, Clearances, No Objection Clearances Or Nocs, Tree Cutting Permissions, And Other Relevant Permits From Various Authorities Before The Start Of Construction , Disposal Of Exist-Ing Old Geo-Bags And Other Materi-Als Used As Tem-Porary Anti-Erosion And Flood Protec-Tion Measures, And Disposal Of All Solid Wastes Dur-Ing Construction To Designated Loca-Tions And/Or Use Of Local Municipal Services , Provision Of All Requisite Facilities (I.E. Drinking Water Supply, Sanitation, Domestic Solid Waste Collection & Disposal, Fuel Supply Etc.) At Labour/ Construction Camps. , Air Quality Moni-Toring For Pm2.5, Pm10, So2, Nox, Co, Pb (Considering Use Of Motorized Boats For Porcu-Pine Installations) Once During The Installation Of Porcupine , Noise Levels Moni-Toring For Noise Levels In Db (A) For Day, Night, L10, L90, Lmax, Lmin (Considering Aquatic Ecology Of The Riparian Environment) , Surface Water Quality Monitoring For Ph, Bod, Cod, Tds, Tss, Do, Oil And Grease And Other Physiochemical And Biological Parameters , Assessment Of Biodiversity With Special Empha-Size On Conserva-Tion Of Aquatic Ecology And Miti-Gation Measures , Ppe Kits For The Labours Consider-Ing Working Condi-Tion On Deep Waters Using Boats , Awareness Camp/ Training For The Labours On Envi-Ronmental Safe-Guard & Occupa-Tional Health Safe-Ty, Covid-19 Protocols , Item No. 37 , Item No. 38 , Item No. 39 , Item No. 40 , Item No. 41 , Item No. 42 , Item No. 43 , Item No. 44 , Item No. 45 , Item No. 46 , Item No. 47 , Item No. 48 , Item No. 49 , Item No. 50 , Item No. 51 , Item No. 52 , Item No. 53 , Item No. 54 , Item No. 55 , Item No. 56 , Item No. 57 , Item No. 58 , Item No. 59 , Item No. 60 , Item No. 61 , Item No. 62 , Item No. 63 , Item No. 64 Total Amount Usd 0.0 0.0 Eur 0.0 0.0 Aud 0.0 0.0 Gbp 0.0 0.0 Jpy 0.0 0.0 Name Of The Bidder : 0.0 Ifb No. Price Schedule (Schedule 3) - Price Schedule For Related To The Services To Be Offered From Outside And Within The PurchaserS Country (This Boq Template Must Not Be Modified/Replaced By The Bidder And The Same Should Be Uploaded After Filling The Relevent Columns, Else The Bidder Is Liable To Be Rejected For This Tender. Bidders Are Allowed To Enter The Bidder Name And Values Only ) Notes Column 5 And 6: Currency In Accordance With Itb 15. Prices Are To Be Quoted Inclusive Of All Customs Duties, Sales, And Other Similar Taxes Applicable In The Purchasers Country And Payable On The Related Services, If The Contract Is Awarded To The Bidder. Item No. Description Country Of Origin Quantity And Unit Of Measurement Unit Price Total Price Per Item Quantity Unit (A) Foreign Currency Quoted Foreign Curreny (B) Local Currency Quoted Local Curreny (A) Foreign Currency (B) Local Currency , Supply And Installation Of Porcupines In Goalpara, Dhubri And Barpeta W.R. Division Location A: Under Goalpara W.R. Division , Transport Of Psc Porcupine Members Of Size 0.10M X 0.10M X 3.00M From Manufacturing Unit To Stack Yard As Mentioned At Section 2, Itb 14.6 (B)(I) Including In-Surance, Loading And Unloading Etc. , Carriage Of Psc Porcupine Members Of Size 0.10 M × 0.10 M × 3.00 M From Stack Yard To Work Site Including Loading, Unloading & Stacking Distance From Divi-Sional Store To Work Site = 5Km , Labour Charge For Launching Of Psc Porcupine Including Carriage Of Psc Porcupine Members Of Size 0.10 M × 0.10 M × 3.00 M From The Stack Yard To The Place Of Launching, Erection Of The Porcupine With 6 (Six) Mem-Bers Properly, Sup-Ply & Fitting/Fixing With 12 Mm Dia. 25 Cm Long M.S. Nuts And Bolts And Launching The Por-Cupine Properly As Directed. (Lead Up To 150 M) Launching Without Boat , Labour Charge For Launching Of Psc Porcupine Including Carriage Of Psc Porcupine Members Of Size 0.10 M × 0.10 M × 3.00 M From The Stack Yard To The Place Of Launching, Erection Of The Porcupine With 6 (Six) Mem-Bers Properly, Sup-Ply & Fitting/Fixing With 12 Mm Dia. 25 Cm Long M.S. Nuts And Bolts And Launching The Por-Cupine Properly As Directed. (Lead Up To 150 M) Launching With Boat , Cost Of Earthwork In Bank Trimming To The Designed Sec-Tion /Slope By Man-Ual Means Including Removing The Trimmed Soils To A Minimum Distance Of 30 M, Complete As Directed. , Construction Of Whole Bholuka Bamboo Double Screen With Ma-Tured Bholuka Bam-Boo Stacks 75Mm To 100Mm Dia., Placed At 30 Cm Clear Apart(I.E. 40 Cm C/C) Driven 4.00 M To 4.50M Below Ground And 3.0M To 3.50M Above Ground With Hydraulic Driv-Ing Equipment In-Cluding Hire Charge Of Equipment, Cost Of P.O.L. Etc. And Providing With 1 (One)Row Of Horizon-Tal Half Jati Bamboo Kamies Tied With Galvanised Wire Of 16 G To 18 G Etc. Complete As Di-Rected. , Location B: Under Dhubri W.R. Division , Transport Of Psc Porcupine Members Of Size 0.10M X 0.10M X 3.00M From Manufacturing Unit To Stack Yard As Mentioned At Section 2, Itb 14.6 (B)(I) Including In-Surance, Loading And Unloading Etc. , Carriage Of Psc Porcupine Members Of Size 0.10 M × 0.10 M × 3.00 M From Stack Yard To Work Site Including Loading, Unloading & Stacking Distance From Divi-Sional Store To Work Site = 10 Km , Labour Charge For Launching Of Psc Porcupine Including Carriage Of Psc Porcupine Members Of Size 0.10 M × 0.10 M × 3.00 M From The Stack Yard To The Place Of Launching, Erection Of The Porcupine With 6 (Six) Mem-Bers Properly, Sup-Ply & Fitting/Fixing With 12 Mm Dia. 25 Cm Long M.S. Nuts And Bolts And Launching The Por-Cupine Properly As Directed. (Lead Up To 150 M) Launching Without Boat , Labour Charge For Launching Of Psc Porcupine Including Carriage Of Psc Porcupine Members Of Size 0.10 M × 0.10 M × 3.00 M From The Stack Yard To The Place Of Launching, Erection Of The Porcupine With 6 (Six) Mem-Bers Properly, Sup-Ply & Fitting/Fixing With 12 Mm Dia. 25 Cm Long M.S. Nuts And Bolts And Launching The Por-Cupine Properly As Directed. (Lead Up To 150 M) Launching With Boat , Location C: Under Barpeta W.R. Division , Transport Of Psc Porcupine Members Of Size 0.10M X 0.10M X 3.00M From Manufacturing Unit To Stack Yard As Mentioned At Section 2, Itb 14.6 (B)(I) Including In-Surance, Loading And Unloading Etc , Carriage Of Psc Porcupine Members Of Size 0.10 M × 0.10 M × 3.00 M From Stack Yard To Work Site Including Loading, Unloading & Stacking Distance From Divi-Sional Store To Work Site = 10Km , Labour Charge For Launching Of Psc Porcupine Including Carriage Of Psc Porcupine Members Of Size 0.10 M × 0.10 M × 3.00 M From The Stack Yard To The Place Of Launching, Erection Of The Porcupine With 6 (Six) Mem-Bers Properly, Sup-Ply & Fitting/Fixing With 12 Mm Dia. 25 Cm Long M.S. Nuts And Bolts And Launching The Por-Cupine Properly As Directed. (Lead Up To 150 M) Launching Without Boat , Labour Charge For Launching Of Psc Porcupine Including Carriage Of Psc Porcupine Members Of Size 0.10 M × 0.10 M × 3.00 M From The Stack Yard To The Place Of Launching, Erection Of The Porcupine With 6 (Six) Mem-Bers Properly, Sup-Ply & Fitting/Fixing With 12 Mm Dia. 25 Cm Long M.S. Nuts And Bolts And Launching The Por-Cupine Properly As Directed. (Lead Up To 150 M) Launching With Boat , Cost Of Earthwork In Bank Trimming To The Designed Sec-Tion /Slope By Man-Ual Means Including Removing The Trimmed Soils To A Minimum Distance Of 30 M, Complete As Directed. Total Amount Inr 0.0 Usd 0.0 Eur 0.0 Aud 0.0 Gbp 0.0 Jpy 0.0
|