Tender for Internal Electrical Installation And Wiring Of The First Floor Of Inspection Bungalow (I.B.) At Level (+) 4.000 Including Supply Of All Materials At Bankura Area Office, Wbsetcl As Per Schedule , A1 [Dsr Ns-8] Sub-Main, New I.B. Main Db (A6) To The Distribution Block A13 In Ffdb-1, 4 X 25 Sq.Mm + 2 X 10 Sq.Mm Earth Wire, Frls/Hffr Pvc Cu In 32 Mm Medium Class Pvc Conduit (Est. 30 M + 20% Provision = 36 M). Wire 1.1 Kv, Is 694 - Make: Finolex / Polycab / Havells / Kei; Conduit Is 9537 (Part 3) - Any Isi-Marked Make. , A2 [Dsr Ns-1] 63 A Tpn Mcb, C-Curve, 10 Ka, On The First-Floor Outgoing Way Of The New I.B. Main Db (A6), In Series With The 300 Ma Rccb A7 - Overcurrent Protection Of Sub-Main A1 And Link Feeder A5 - Complete With Connections, Testing And Commissioning. Standard Is/Iec 60898-1. Make: Abb / Bch Electric / Ge / Havells / L&T / Schneider / Siemens / C&S Electric. , A2a [Dsr Ns-7] 80 A Four Pole (Tpn) Mcb, C-Curve, 10 Ka, Is/Iec 60947-2, Din-Rail Mounted, Main Incomer Of The New I.B. Main Db (A6) - The ConsumerS Circuit Breaker, Cea Regulations 2023, Reg. 37 - Complete With Connections, Testing And Commissioning. Make: Abb / Bch Electric / Ge / Havells / L&T / Schneider / Siemens / C&S Electric. , A3 [Dsr 2.5.3] 12 Way (4+36) Tpn Vertical Mcb Db, Double Door, Without Mcbs And Incomer - Ffdb-1 And Ffdb-2. Sheet Steel, Powder Coated, Ip-42/43, Is/Iec 61439-3. Make: Factory-Assembled, Of The Make Of The Mcbs (Abb / Bch Electric / Ge / Havells / L&T / Schneider / Siemens / C&S Electric). , A4 [Dsr Ns-11] 63 A, 4 Pole, 415 V Rccb, 30 Ma Sensitivity, Type A (Is 12640-1 / Iec 61008-1), In Mcb Db - Incomer And Isolating Switch Of Ffdb-1 And Ffdb-2, Each Fed From The Distribution Block A13 - Complete With Connections, Testing And Commissioning. Make: Any Isi-Marked, Preferably The Make Of The Mcbs. , A5 [Dsr Ns-8] Link Feeder, Distribution Block A13 In Ffdb-1 (Line Side Of The Ffdb-1 Rccb) To Ffdb-2, 4 X 25 Sq.Mm + 2 X 10 Sq.Mm Earth Wire, Frls/Hffr Pvc Cu In 32 Mm Medium Class Pvc Conduit (Est. 8 M). Wire 1.1 Kv, Is 694 - Make: Finolex / Polycab / Havells / Kei; Conduit Is 9537 (Part 3) - Any Isi-Marked Make. , A6 [Dsr 2.5.2] 8 Way (4+24) Tpn Vertical Mcb Db, Double Door, Without Mcbs And Incomer, With An Incomer Section For The 80 A Four Pole Mcb A2a - New I.B. Main Db Beside The Wbsedcl 3-Phase Meter. Sheet Steel, Powder Coated, Ip-42/43, Is/Iec 61439-3. Make: Factory-Assembled, Of The Make Of The Mcbs (Abb / Bch Electric / Ge / Havells / L&T / Schneider / Siemens / C&S Electric). , A7 [Dsr Ns-6] 63 A, 4 Pole, 415 V Rccb, 300 Ma Sensitivity, Type Ac, In Mcb Db - First-Floor Outgoing Of The New I.B. Main Db, Also Isolating The First Floor - Complete With Connections, Testing And Commissioning. Standard Is 12640-1. Make: Any Isi-Marked, Preferably The Make Of The Mcbs. , A8 [Dsr 2.10.2] 5-32 A Spn Mcb (32 A), C-Curve, 10 Ka - Ground-Floor Outgoing Of The New I.B. Main Db. Standard Is/Iec 60898-1. Make: Abb / Bch Electric / Ge / Havells / L&T / Schneider / Siemens / C&S Electric. , A9 [Dsr 2.14.2] 40 A 2 Pole Rccb 30 Ma - Ground-Floor Outgoing Of The New I.B. Main Db (Cea Regulations 2023, Reg. 44). Standard Is 12640-1. Make: Any Isi-Marked, Preferably The Make Of The Mcbs. , A10 [Dsr Ns-9] Link, Wbsedcl Meter Outgoing Terminals To The Main Incomer A2a, 4 X 35 Sq.Mm + 2 X 16 Sq.Mm Earth Wire, Frls/Hffr Pvc Cu In 40 Mm Medium Class Pvc Conduit (Est. 3 M + 20% Provision = 4 M). Wire 1.1 Kv, Is 694 - Make: Finolex / Polycab / Havells / Kei; Conduit Is 9537 (Part 3) - Any Isi-Marked Make. , A11 [Dsr 1.14.4] Link, Ground-Floor Outgoing (A8 + A9) To The Existing Ground Floor Main Switch, 2 X 6 Sq.Mm + 1 X 6 Sq.Mm Earth Wire (Est. 3 M). Wire Frls/Hffr Pvc Insulated Cu, 1.1 Kv, Is 694 - Make: Finolex / Polycab / Havells / Kei; In Medium Class Pvc Conduit, Is 9537 (Part 3) - Any Isi-Marked Make. , A12 [Dsr 2.21] M.V. Danger Notice Plate 200 X 150 Mm, Mild Steel 2 Mm, Vitreous Enamelled - On The New I.B. Main Db, Ffdb-1 And Ffdb-2 (Cea Regulations 2023, Reg. 20). Make: Any, Approved By The E.I.C. , A13 [Dsr Ns-3] 4 Pole Distribution Block Set, 125-160 A, 415 V, Ip20 With Cover, In Ffdb-1 Ahead Of Its Rccb (A4) - A Single 4 Pole Block Or 4 Single Pole Blocks, Per Pole One Supply Terminal 25-35 Sq.Mm And At Least Two Outgoing Terminals For 25 Sq.Mm Flexible Conductor With Ferrule - With 25 Sq.Mm Jumpers To The Ffdb-1 Rccb; Feeds The Ffdb-1 Rccb And The Link A5 To Ffdb-2 - Supply, Fixing, Connection, Testing And Commissioning. Standard Iec 60947-7-1. Make: Elmex / Connect Well / Yogya Equipments, Or Abb / Bch Electric / Ge / Havells / L&T / Schneider / Siemens / C&S Electric. , B1 [Dsr 1.10.2] Light / Fan / Exhaust Fan Point Wiring, 1.5 Sq.Mm Frls/Hffr Cu, Modular Switch, Gi Box, Earthing - Group B, Points Of 3 To 6 M Route Length From The Switchboard (6 Battens, 4 Toilet Down Lighters, 8 Down Lighters Dl-9 To Dl-11 And Dl-16 To Dl-20, Fl-1, 4 Cove-Light Points, 4 Fan Points Cf-1, Cf-4 To Cf-6, Exhaust Fans Ex-2, Ex-3). Wire 1.1 Kv, Is 694 - Make: Finolex / Polycab / Havells / Kei; Conduit Is 9537 (Part 3), Modular Switch Is 3854 And Plate - Any Isi-Marked Make. , B1a [Dsr 1.10.3] Light / Fan / Exhaust Fan Point Wiring As B1 - Group C, Points Of Over 6 M Route Length From The Switchboard (Conference Down Lighters Dl-1 To Dl-8 And Dl-12 To Dl-14, Fans Cf-2, Cf-3; Dining Dl-15; Battens L12, L15; Exhaust Fans Ex-1, Ex-4 - Route Lengths Scaled From Drg. Bnk/Ib/El/01, Clause 5(E)); Quantities Of B1 And B1a Fixed At Measurement. Wire 1.1 Kv, Is 694 - Make: Finolex / Polycab / Havells / Kei; Conduit Is 9537 (Part 3), Modular Switch Is 3854 And Plate - Any Isi-Marked Make. , B2 [Dsr 2.10.1] 5-32 A Sp Mcb (10 A), C-Curve, 10 Ka - 6 Lighting + 1 Stair + 2 Fan Circuits (Ff-Ltg-2A: Not More Than 10 Points Per Lighting Circuit, Clause 5(E)). Standard Is/Iec 60898-1. Make: Abb / Bch Electric / Ge / Havells / L&T / Schneider / Siemens / C&S Electric. , B3 [Dsr 1.14.1] Circuit Wiring 2 X 1.5 + 1 X 1.5 Sq.Mm Earth Wire From Ffdb-1 To The Switchboards Of The 9 Lighting / Fan Circuits - 17 Runs (Db To First Switchboard And Between The Switchboards Of A Circuit) X 9 M Average, And 8 M From Sb-11 To The Roof-Door Switchboard Sb-13 - + Provision (161 M + 31 M) - Payable On Actual Measurement. Wire Frls/Hffr Pvc Insulated Cu, 1.1 Kv, Is 694 - Make: Finolex / Polycab / Havells / Kei; In Medium Class Pvc Conduit, Is 9537 (Part 3) - Any Isi-Marked Make. , B4 [Dsr 8.9.3] Led Batten Luminaire 36 W, 4000 K, Surface / Ceiling Mounted, Supply, Installation, Testing And Commissioning - Bed Room 2, V.I.P. 3, V.V.I.P. 3 (L1, L2, L11, L12, L23, L14, L15, L24 Of Drg. Bnk/Ib/El/01); No Batten On The Stair (B14a). Bis (Crs) Registered. Make: Any, Approved By The E.I.C. , B5 [Dsr 8.2.3] Led Down Lighter 12-15 W, 4000 K, Recessed Or Surface, One In Each Toilet (L3, L10, L13, L16 Of Drg. Bnk/Ib/El/01), Supply, Installation, Testing And Commissioning. Bis (Crs) Registered. Make: Any, Approved By The E.I.C. , B6 [Dsr 9.2.4] Bldc Ceiling Fan Without Remote, For Speed Control By Wall Regulator, 1400 Mm Sweep, Is 374, Supply, Installation, Testing And Commissioning - Cf-1 To Cf-6 Of Drg. Bnk/Ib/El/01. Make: Any, With The Bis Mark Where Compulsory, Approved By The E.I.C. , B7 [Dsr Ns-4] Exhaust Fan, 300 Mm Sweep, Metal Body With Shutters, Is 2312 - Supply Only - Ex-1 To Ex-4 Of Drg. Bnk/Ib/El/01. Make: Any, With The Bis Mark Where Compulsory, Approved By The E.I.C. , B8 [Dsr 1.50.1] Installation, Testing And Commissioning Of Exhaust Fan Up To 450 Mm Sweep In The Existing Opening, Including Making Good The Damage And Connections , B9 [Dsr 1.11] Twin Control (Two-Way) Light Point Wiring, 1.5 Sq.Mm Frls/Hffr Cu In Medium Class Pvc Conduit, 2 Way Modular Switches, Modular Plate, Gi Box, Earthing - Stair Strip Lines Cv-5 And Cv-6 (Sb-11 / Sb-12); Roof-Stair Strip Lines Cv-7 And Cv-8 (Sb-11 / Sb-13), Each Point Feeding The First Driver Of Its Line (B14a). Wire 1.1 Kv, Is 694 - Make: Finolex / Polycab / Havells / Kei; Conduit Is 9537 (Part 3), Modular Switch Is 3854 And Plate - Any Isi-Marked Make. , B10 [Dsr 8.2.5] Led Recessed Down Lighter 22 W, Round, 4000 K, In The False Ceilings - Conference Room 14 (Dl-1 To Dl-14), Dining Room 6 (Dl-15 To Dl-20) Of Drg. Bnk/Ib/El/01 - Supply, Installation, Testing And Commissioning. Bis (Crs) Registered. Make: Any, Approved By The E.I.C. , B11 [Dsr 8.15.3] Led Flood Light 100 W, Ip-65 Minimum - Fl-1 On The Roof, Switched At The Roof-Door Switchboard Sb-13 - Supply, Installation, Testing And Commissioning. Bis (Crs) Registered. Make: Any, Approved By The E.I.C. , B12 [Dsr 1.25] Two Module Stepped Type Electronic Fan Regulator On The Modular Plate Of The Fan Point - Cf-1 To Cf-6. Standard Is 11037. Make: Of The Make And Range Of The Modular Switches (Any Isi-Marked). , B13 [Dsr 1.47] Extra Down Rod Of 10 Cm Length, 15 Mm Dia G.I. Pipe, Heavy Gauge, Painted - Fans Under The False Ceilings Cf-2, Cf-3, Cf-6, 30 Cm Each (Est.). Make: Any, Approved By The E.I.C. , B14 [Dsr Ns-5] Led Cove Light Set Of 5 M - Flexible Led Strip 12 V Dc, About 25 W Per 5 M, Warm White (Outer Cove) Or Magenta (Inner Cove), With One 12 V Dc Constant-Voltage Selv Driver Of Not Less Than 30 W (Bis Registered), 230 V Loop In 20 Mm Pvc Conduit, 12 V Leads - Supply, Installation, Testing And Commissioning - Conference Room 8 Sets, Dining Room 5 Sets. Make: Any, Approved By The E.I.C. , B14a [Dsr Ns-10] Led Strip Light Set Of 5 M For The Stair - Flexible Led Strip As B14, 4000 K, In 5 M Of Surface-Mounted Aluminium Led Profile With Frosted / Opal Diffuser And End Caps, Screw-Fixed On The Wall Just Below The Slab, Light Directed Down, With One 12 V Dc Constant-Voltage Selv Driver Of Not Less Than 30 W (Bis Registered), 230 V Loop In 20 Mm Pvc Conduit, 12 V Leads - Supply, Installation, Testing And Commissioning - Stair Cv-5, Cv-6 And Roof Stair Cv-7, Cv-8 Of Drg. Bnk/Ib/El/01, 2 Sets Each. Make: Any, Approved By The E.I.C. , B15 [Dsr 1.10.3] Call Bell Point Wiring, 1.5 Sq.Mm Frls/Hffr Cu, Modular Bell Push, Gi Box, Earthing - Group C - Bed Room, V.I.P. Room And V.V.I.P. Room, Push At The Bedside, Buzzer (B16) Above The Outside Of The Room Door (Clause 5(F)). Wire 1.1 Kv, Is 694 - Make: Finolex / Polycab / Havells / Kei; Conduit Is 9537 (Part 3) And Modular Bell Push - Any Isi-Marked Make. , B16 [Dsr 1.38] Call Bell / Buzzer, Single Phase 230 V, Complete - One For Each Call Bell Point Of B15. Make: Any, Approved By The E.I.C. , C1 [Dsr 1.32] Gi Box With Modular Plate, 6 Pin 5/6 & 15/16 A Socket And 15/16 A Switch - S1, S8, S11 (One In Each Guest Room), S4 To S7 (Conference Room), S14 (Lobby). Switch Is 3854, Socket Is 1293. Make: Any Isi-Marked; Plate Of The Same Make And Range. , C1a [Dsr 1.31] Gi Box With Modular Plate, 3 Pin 5/6 A Socket And 5/6 A Switch - Bedside Outlets S2, S3, S9, S10, S12, S13. Switch Is 3854, Socket Is 1293. Make: Any Isi-Marked; Plate Of The Same Make And Range. , C2 [Dsr 1.32] Gi Box With Modular Plate, 6 Pin 5/6 & 15/16 A Socket And 15/16 A Switch. Switch Is 3854, Socket Is 1293. Make: Any Isi-Marked; Plate Of The Same Make And Range. , C3 [Dsr 1.14.2] Circuit Wiring 2 X 2.5 + 1 X 2.5 Sq.Mm Earth Wire (15 Socket Points X 9 M = 135 M). Wire Frls/Hffr Pvc Insulated Cu, 1.1 Kv, Is 694 - Make: Finolex / Polycab / Havells / Kei; In Medium Class Pvc Conduit, Is 9537 (Part 3) - Any Isi-Marked Make. , C4 [Dsr 2.10.1] 5-32 A Sp Mcb (16 A), C-Curve, 10 Ka - Socket Circuits Ff-Sp-1 To Ff-Sp-6 And Ff-Sp16. Standard Is/Iec 60898-1. Make: Abb / Bch Electric / Ge / Havells / L&T / Schneider / Siemens / C&S Electric. , C5 [Dsr 2.14.1] 25 A 2 Pole Rccb 30 Ma - Fridge Circuit Ff-Sp16. Standard Is 12640-1. Make: Any Isi-Marked, Preferably The Make Of The Mcbs. , C5a [Dsr 2.14.2] 40 A 2 Pole Rccb 30 Ma - Ahead Of Each Pair Of Socket Circuits (Ff-Sp-1 + Ff-Sp-2, Ff-Sp-3 + Ff-Sp-4, Ff-Sp-5 + Ff-Sp-6). Standard Is 12640-1. Make: Any Isi-Marked, Preferably The Make Of The Mcbs. , C6 [Dsr 2.10.1] 5-32 A Sp Mcb (10 A), C-Curve, 10 Ka - Conference Audio-Visual Power Circuits Ff-Av-1 And Ff-Av-2. Standard Is/Iec 60898-1. Make: Abb / Bch Electric / Ge / Havells / L&T / Schneider / Siemens / C&S Electric. , C7 [Dsr 2.14.1] 25 A 2 Pole Rccb 30 Ma - Ahead Of The Circuits Ff-Av-1 And Ff-Av-2. Standard Is 12640-1. Make: Any Isi-Marked, Preferably The Make Of The Mcbs. , C8 [Dsr 1.31] Gi Box With Modular Plate, 3 Pin 5/6 A Socket And 5/6 A Switch - Conference Audio-Visual Power Points Av1 To Av6 (Projector At Ceiling, Screen, Av Rack 2, ChairmanS End 2; Av1 To Av3 On Ff-Av-1, Av4 To Av6 On Ff-Av-2). Switch Is 3854, Socket Is 1293. Make: Any Isi-Marked; Plate Of The Same Make And Range. , C9 [Dsr 1.14.2] Circuit Wiring 2 X 2.5 + 1 X 2.5 Sq.Mm Earth Wire, Circuits Ff-Av-1 And Ff-Av-2 (6 Points X 9 M = 54 M, + Provision 5 M). Wire Frls/Hffr Pvc Insulated Cu, 1.1 Kv, Is 694 - Make: Finolex / Polycab / Havells / Kei; In Medium Class Pvc Conduit, Is 9537 (Part 3) - Any Isi-Marked Make. , C10 [Dsr 1.21.2] 25 Mm Medium Class Pvc Conduit, Laid Empty With Gi Pull Wire, For Audio-Visual Signal / Speaker Cables By Others (Est. 60 M). Standard Is 9537 (Part 3). Make: Any Isi-Marked. , C11 [Dsr 1.22.2] Metal Pull Box 100 X 100 X 60 Mm With Phenolic Laminated Cover On The Empty Av Conduit. Make: Any, Approved By The E.I.C. , D1 [Dsr 1.14.3] Circuit Wiring 2 X 4 + 1 X 4 Sq.Mm Earth Wire To Geyser Points (3 X 9 M = 27 M). Wire Frls/Hffr Pvc Insulated Cu, 1.1 Kv, Is 694 - Make: Finolex / Polycab / Havells / Kei; In Medium Class Pvc Conduit, Is 9537 (Part 3) - Any Isi-Marked Make. , D2 [Dsr 2.10.3] 5-32 A Dp Mcb (20 A), C-Curve, 10 Ka - Geyser Circuits. Standard Is/Iec 60898-1. Make: Abb / Bch Electric / Ge / Havells / L&T / Schneider / Siemens / C&S Electric. , D3 [Dsr 2.14.1] 25 A 2 Pole Rccb 30 Ma - Geyser Circuits (Wet Location, Mandatory). Standard Is 12640-1. Make: Any Isi-Marked, Preferably The Make Of The Mcbs. , D4 [Dsr 2.16] Dp Sheet Steel Enclosure On Surface / Recess With 25 A Dp Mcb, C-Curve - The Switch At Each Geyser Point, Outside The W.C. & Bath Beside Its Door (Clause 5(G)). Mcb Is/Iec 60898-1, 10 Ka. Make: Mcb - Abb / Bch Electric / Ge / Havells / L&T / Schneider / Siemens / C&S Electric; Enclosure Of The Same Make. , E1 [Dsr 2.10.3] 5-32 A Dp Mcb (20 A), C-Curve, 10 Ka, In Ffdb-2 - One For Each Of The 6 Air-Conditioner Circuits; Circuit Wiring, Switch At Each Unit And Ac Units Under The Separate Air-Conditioning Tender (Clause 5(H)). Standard Is/Iec 60898-1. Make: Abb / Bch Electric / Ge / Havells / L&T / Schneider / Siemens / C&S Electric. , F1 [Dsr 2.10.1] 5-32 A Sp Mcb (16 A), C-Curve, 10 Ka - 2 Spare Ways In Ffdb-1 (Mcbs Fitted; No Circuit Wiring In This Contract). Standard Is/Iec 60898-1. Make: Abb / Bch Electric / Ge / Havells / L&T / Schneider / Siemens / C&S Electric. , F2 [Dsr 2.10.3] Provision - 20/25 A Dp Mcb, C-Curve, 10 Ka, In A Spare Way Of Ffdb-2, Fixed And Connected To The Busbar, For A Socket Or Ac Circuit Called For During Execution; Executed Only On The Written Order Of The E.I.C. (Clause 5(N)). Standard Is/Iec 60898-1. Make: Abb / Bch Electric / Ge / Havells / L&T / Schneider / Siemens / C&S Electric. , F3 [Dsr 1.14.3] Provision - Circuit Wiring 2 X 4 + 1 X 4 Sq.Mm Earth Wire From Ffdb-2, For The Circuits Of The Provision Mcbs F2 Or Any Other Circuit Of This Size Called For During Execution; Executed Only On The Written Order Of The E.I.C. (Clause 5(N)) - Payable On Actual Measurement. Wire Frls/Hffr Pvc Insulated Cu, 1.1 Kv, Is 694 - Make: Finolex / Polycab / Havells / Kei; In Medium Class Pvc Conduit, Is 9537 (Part 3) - Any Isi-Marked Make. , G1 [Dsr 5.15] 25 X 5 Mm Gi Strip On Surface/Recess - Earth Riser And Bonding (Est. 42 M + 20% Provision = 50 M). Hot-Dip Galvanised (Is 2629 / Is 4736). Make: Any. , G2 [Dsr 5.18] 6 Swg Dia Gi Wire Loop Earthing Along Conduit (100 M + Provision 14 M = 114 M). Hot-Dip Galvanised (Is 2629 / Is 4736). Make: Any. , G3 [Dsr 5.2] Earthing With G.I. Earth Pipe 4.5 M Long, 40 Mm Dia, With Accessories, Masonry Enclosure With Cover Plate And Locking Arrangement, Watering Pipe, Charcoal / Coke And Salt - 1 No. New Electrode, Added To The Existing Earth Bus And Earth Pit Of The I.B. And Bonded To The Earth Bar Of The New I.B. Main Db (Clause 5(I)). Hot-Dip Galvanised (Is 2629 / Is 4736). Make: Any. , G4 [Dsr 5.15] 25 X 5 Mm Gi Strip Earth Lead From The New Electrode To The Earth Bar Of The New I.B. Main Db (Est. 10 M). Hot-Dip Galvanised (Is 2629 / Is 4736). Make: Any. , H1 [Dsr Ns-2] Testing, Commissioning And Handing Over - Ir, Earth Continuity/Resistance, Polarity, Rccb Tests With An Rcd Tester; Test Report, Marked-Up As-Built Drawings, Warranty Cards; Inspectorate Liaison
|