The Subject Of The Order Are Construction Works Carried Out In Two Stages: • Stage I (Construction Of The Tower): Construction Of A New, Typical Antenna Tower Made Of Spun Concrete With A Height Of 46.04 M Above Ground Level. At The Top Of The Structure There Is A Separation Crown Approximately 1.74 M High And A 2.0 M High Lightning Protection Spire. At A Level Of 44.30 M Above Sea Level. There Will Be A Platform Constituting The Installation Zone For Directional Antennas. The Scope Of Work Includes Earthworks, Reinforced Concrete Works (Foundation Construction), Assembly Of The Tower Structure And Installation Connection Of The Facility To Existing Low-Voltage Installations And Low-Current Installations With The Alarm And Disposition Point (Pad) Room In The Sława Śląska Forest District. The Contractor Is Also Obliged To Develop Complete As-Built Documentation.• Stage Ii (Demolition Of The Mast): Demolition Of The Existing Steel Mast/Tower With A 30.0 M High Pipe Spire Along With The Accompanying Land Development. The Works Also Include Loading, Transporting And Unloading The Dismantled Mast Elements And Antennas To The Scrap Collection Point In Sława, And If The Collection Point Refuses To Accept Them - To Pszok In Sława, And The Development Of Post-Construction Documentation For The Demolition. The Detailed Description Of The Subject Of The Order (Opz) Is Provided In The Attachments Indicated Below To The Swz1) Indicative Plan;2) Area Development Plan;3) Technical Design;4) Cross-Sections Normal;5) Fence;6) Projections;7) Cross-Section;8) Elevations;9) Lightning Protection Installation;10) Szk Cabinet;11) Installation Route;12) Pad Board;13) Foundation Footing;14) Existing Mast To Be Demolished;15) Stwiorb - Tower Construction;16) Stwiorb - Mast Demolition;17) Offer Cost Estimate - Construction Tower;18) Bid Cost Estimate - Demolition Of The Mast;19) Geotechnical Opinion;20) Building Permit;21) Architectural And Construction Design;22) Bioz Plan;23) Certificate Of The Mayor Of Sława Oddz. On The Environment.24) Bill Of Quantities - Construction Of The Tower25) Bill Of Quantities - Dismantling The Mast As Part Of The Execution Of The Subject Of The Order, The Contractor Is Obliged To Dismantle, Load, Transport And Deliver To The Scrap Collection Point, Using His Own Efforts And At His Own Expense, Steel Structural Elements Of The Existing Mast And Metal Elements Of The Dismantled Antennas, Suitable For Scrapping. The Contractor Is Obliged To Ensure Transport And Management Of The Indicated Areas In Accordance With Applicable Law. Elements, Including Compliance With The Required Obligations Arising From Waste Management Regulations. Upon Transferring The Elements Intended For Scrapping To The Contractor, The Ordering Party Transfers The Ownership Of These Elements To The Contractor For Further Use Or Sale As Scrap. The Income Obtained From The Sale Of Scrap Constitutes The Contractors Income And Is Not Subject To Separate Settlement With The Orde
Contact Information
Address
National Forest Holding State Forests Sława Śląska Forest District,Sława,67-410,Lubuskie,Pl432 - Zielonogórski
Contact No.
683566229
Email
slawaslaska@zielonagora.lasy.gov.pl
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 120865914
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.