3. The Scope Of The Order Includes, Among Others: - Demolition Works (Foundations), - Earthworks (Excavations, Embankments), - Protection Of Cables Of Existing Underground Installations With Protective Pipes, - Execution Of Road Surface Foundation Layers, - Construction Of Surfaces, - Vertical Markings.4.The Contractor Will Carry Out Construction Works Based On The Construction Design Approved By The Final Building Permit Decision No. Ab.6740.5.65.2025 Of August 4, 20255.The Detailed Material Scope Of The Subject Of The Order Is Specified In The Design Documentation, Annex No. 6 To The Swz, The Contract Template Constituting Annex No. 5 And This Swz.6.The Opole Lubelskie Commune Informs That During Construction Works, It Is Not Planned To Completely Exclude The Road In Question From Use Due To The Fact That The Road Is The Only Access To The Property. The Contractor Must Carry Out The Works In Such A Way As To Enable Residents To Pass. The Ordering Party Allows For The Possibility Of Temporary Closure, E.G. Due To The Laying Of Layers Of Bituminous Mass. 7. At The Same Time, We Would Like To Inform You That In The Area Of The Reconstructed Road, Another Contractor, Commissioned By The Provincial Roads Authority, Is Carrying Out Works Related To The Construction Of The Opole Lubelskie Bypass. Works Related To The Construction Of The Bypass May Result In Traffic Difficulties. The Contractor Of The Reconstruction Of The Municipal Road Will Be Obliged To Ensure Coordination With The Contractor Of The Bypass Construction Works, In Particular In Terms Of Ensuring Access To The Investment. The Planned Completion Date For The Works Related To The Construction Of The Bypass Is May 2027. 8. The Contractor Provides Surveying Services And Ensures That The Construction/Works Are Managed By Persons With Construction Qualifications In A Specific Specialty.9.The Ordering Party Does Not Reserve The Right To Apply For The Contract Only By Contractors Referred To In Art. 94 Of The Public Procurement Law, I.E. Those Having The Status Of A Sheltered Workshop, Social Cooperatives And Other Contractors Whose Main Goal Or The Main Purpose Of The Activities Of Their Organizationally Separated Units That Will Implement The Order Is The Social And Professional Integration Of Socially Marginalized People.11.All Works Must Be Performed In Accordance With Applicable Regulations, In Particular The Requirements Of The Act Of July 7, 1994 Construction Law (I.E. Journal Of Laws 2021, Item 2351), Standards, Technical Conditions And Construction Practices, Regulations On Health And Safety When Performing Construction Works, I.E. The Regulation Of The Minister Of Infrastructure Of February 6, 2003 On Occupational Health And Safety During The Performance Of Construction Works (Journal Of Laws 2003 No. 47, Item 401), Fire Protection Regulations. And In Accordance With The Instructions Of The Supervisory Inspector.12.The Ordering Party Allows The Use Of Subcontractors. In Such A Situ
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 120865889
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.