|
The Scope Of Work Includes: - Construction Of A Water Supply Network From Pehd Pe100 Rc Pipes, Sdr17 Pn10 - L = 308.64 [M], Along With Complete Infrastructure And Water Supply Fittings, In Accordance With The Design Documentation, - Installation Of Above-Ground Dn80 Hydrants With Shut-Off Valves And The Necessary Accessories, In Accordance With The Design Documentation - 3 Sets, - Reconstruction Of Connections Water Supply Lines Dn 40 - Total Length 201.08 [M], Including The Necessary Infrastructure, Connections To The Existing Infrastructure/Installation And Other Works Necessary For The Proper Functioning Of The Connections, In Accordance With The Design Documentation, - Construction Of A Gravity Sanitary Sewage Network Made Of Pvc Pipes Dn 200 Sdr34 Sn8 - L= 309.75 [M], Along With Complete Sewage Wells With Types, Diameters And Locations In Accordance With The Design Documentation And Other Sewage Devices And Elements Necessary For The Proper Functioning Of The Network, - Construction Of A Storm Sewage System Made Of Pvc Sdr34 Sn8 Pipes, With Diameters According To Pzt - Total Length -L= 312.07 [M] Along With Complete Sewage Manholes With Types, Diameters And Locations In Accordance With The Design Documentation And Other Sewage Devices And Elements Necessary For The Proper Functioning Of The Network, - Reconstruction Of Existing Sanitary Sewers Dn 160 With A Total Length Of L = 361.91 [M] Together With The Necessary Elements Of Infrastructure, Connection With The Existing And Planned Infrastructure And Works Necessary To Ensure The Proper Functioning Of The Sewers, In Accordance With The Design Documentation, - Construction Of Storm Sewers Dn160 With Sewage Devices - Total Length - 376.95 [M], Together With Complete Elements Of Infrastructure, Necessary Connections To The Existing And Designed Storm Sewage System And Other Works Necessary For The Proper Functioning Of Sewers, In Accordance With The Design Documentation, - Construction Of Street Inlets Dn 500, Discharging Rainwater Into The Designed Storm Sewage System - 13 Sets, Along With Sewage Grates With A Settling Tank And Other Elements Provided For In The Design Documentation And Connection To The Designed Sewage System Rainwater, - Dismantling Existing Water Networks. – Can. And Connections In The Area Of Conflicts With The Designed Water Supply Networks, Sanitary Sewage Systems, Rainwater Sewage Systems, Liquidation Of Existing Tanks For Liquid Waste, Dismantling Of Existing Water Supply Connections, Sanitary And Storm Sewers In Places Of Conflict With The Designed Utilities, In Accordance With The Design Documentation And Applicable Regulations, - Reconstruction Of Two Sections Of The Municipal Road Constituting Reymonta Street In Bolków, Including Replacement Of The Road Surface Structure, Hardened Roadsides And Exits To The Extent Resulting From The Design Documentation And Reconstruction Of The Surface After The Planned Reconstruction Of The Water Supply Network, Sanitary Sewage
|